BLD-Final | 12/23/1999 | 12/23/1999 | 12/23/2000 | P | FAIL |
Carl Dependahl
|
|
|
for temp occ --###-####-gene. Fire failed, recall.
|
BLD-Final | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### GENE
|
FIRE-Final Inspection | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | PASS |
Joe Tawney
|
|
|
Gene ###-####. Reinsp. Of for perm. Occ.
|
BLD-Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | FAIL |
Tom Arcoraci
|
|
|
Gene ###-####. Not ready.
|
FIRE-Final Inspection | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | FAIL |
Joe Tawney
|
|
|
###-####. Reinsp. fail need LED's for duct detectors.
|
BLD-Final | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | FAIL |
|
|
|
c/n issued 1) need protection for bathroom drain pipes unter lavs, ALL
2) stair rail and extensions not per plans see sheet A/7 1 and 2 rail too high at the bottom this is not a vallute (3) need fire signoff. (4) doors on corridors do not latch and seal properly both floors. (5) provide assy per plan review note for the full height wall at the corridors near the stairs. (6) provide final signoff for the special inspections, by the str. eng of record. Gene ###-####
|
BLD-Final | 12/13/1999 | 12/15/1999 | 12/14/1999 | P | CANC |
Jim Sly
|
|
|
###-####- gene fn
|
FIRE-Final Inspection | 12/10/1999 | 12/15/1999 | 12/14/1999 | A | CANC |
Joe Tawney
|
|
|
GENE ###-####
|
BLD-Final | 12/10/1999 | 12/14/1999 | 12/14/1999 | A | CANC |
Carl Dependahl
|
|
|
GENE ###-####
|
FIRE-Final Inspection | 12/14/1999 | 12/14/1999 | 12/14/1999 | A | FAIL |
Joe Tawney
|
|
|
Reinsp. test duct detectors & install LED's.
|
BLD-Final | 12/9/1999 | 12/10/1999 | 12/10/1999 | P | FAIL |
Jim Sly
|
|
|
gene ###-#### fn occ Not ready.
|
FIRE-Final Inspection | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Joe Tawney
|
|
|
gene -###-#### fire fn Reinsp. Fail duct detectors, door closens.
|
BLD-Final | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | FAIL |
Jim Sly
|
|
|
TEMP OCC GENE ###-#### Not ready.
|
FIRE-Final Inspection | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | FAIL |
Joe Tawney
|
|
|
gene ###-#### Final fail C/N issued.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PASS |
Jim Sly
|
|
|
CEILING GRID AND FRAMING GENE ###-#### Ceiling grid & firestopping ok.
|
BLD-Framing/Rough-in | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | PASS |
Jim Sly
|
|
|
gene ###-####
|
BLD-Framing/Rough-in | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PASS |
Jim Sly
|
|
|
gene ###-#### fr insp Frame ok pending spec. insp. And approval
|
BLD-Framing/Rough-in | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | PART |
Jim Sly
|
|
|
###-#### FR INSP pre inspection walk thru (frame)
|
BLD-Concrete | 9/21/1999 | 9/24/1999 | 9/24/1999 | A | PART |
Jim Sly
|
|
|
###-####-- SLAB POUR- 2ND FLOOR Slab ok 2nd floor pending special insp. Report and appr.
|
BLD-Framing/Rough-in | 9/21/1999 | 9/22/1999 | 9/22/1999 | P | PART |
Jim Sly
|
|
|
GENE ###-#### -REBAR- & WIRE MESH -2ND FLOOR Pan deck 2nd floor ok pending special insp. & approval
|
BLD-Framing/Rough-in | 9/20/1999 | 9/21/1999 | 9/21/1999 | A | PART |
Jim Sly
|
|
|
jene-- ###-#### -welding insp- 2ND FLOOR welding, pending special insp. Reports and approval
|
INSP - Concrete | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | PART |
Tom Arcoraci
|
|
|
pouring at 6am- SPEC INSP ON SITE
|
INSP - Framing/Rough-in | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PART |
Jim Sly
|
|
|
08/12/99 316 - West and North tilt up panels OK...Pending special insp t
|
INSP - Foundation | 8/6/1999 | 8/11/1999 | 8/11/1999 | A | PART |
Jim Sly
|
|
|
08/11/99 316 - Tilt up panels OK pending special insp tests and approval
|
INSP - Foundation | 8/6/1999 | 8/10/1999 | 8/10/1999 | A | PART |
Jim Sly
|
|
|
08/10/99 316 - Tilt up walls OK PENDING special insp tests and approvals
|
INSP - Foundation | 8/6/1999 | 8/9/1999 | 8/9/1999 | A | PART |
Tom Arcoraci
|
|
|
08/09/99 408 - spec insp at site
|
INSP - Foundation | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
Jim Sly
|
|
|
08/05/99 316 - North and west tilt walls OK pending special insp tests a
|
INSP - Framing/Rough-in | 7/19/1999 | 7/20/1999 | 7/20/1999 | A | PART |
Jim Sly
|
|
|
07/20/99 316 - Tilt up panels OK pending special insp tests and approval
|
INSP - Foundation | 7/8/1999 | 7/8/1999 | 7/8/1999 | P | PART |
Jim Sly
|
|
|
07/08/99 316 - Foot and rebar OK pending special insp tests and appr.
|
INSP - Concrete | 7/1/1999 | 7/2/1999 | 7/2/1999 | A | PART |
Jim Sly
|
|
|
07/02/99 316 - Concrete slab....OK pending special insp tests and appr
|
INSP - Foundation | 6/25/1999 | 6/25/1999 | 6/25/1999 | P | PART |
Jim Sly
|
|
|
06/25/99 316 - Footings OK pending spec insp approval
|
INSP - Foundation | 6/23/1999 | 6/24/1999 | 6/24/1999 | A | PART |
Jim Sly
|
|
|
06/24/99 316 - ###-#### GENE//CALL B4 GOING 2 MEET U 4 CONFERENCE
|