WALGREEN CO. * TO CONSTRUCT A NEW SINGLE STORY 13,833 RETAIL BUILDING WITH DRIVE-THRU PICK UP WINDOW. Construction is masonry exterior walls with wood metal roof joist, wood roof beams and metal studs & GWB interior walls and a suspended ceiling. DRH98-0089 CUP98-0020 PC#621-98 ads
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/8/199910/11/199910/11/1999APASS
DetailsCarl Dependahl
Walgreen's, final reinspect - I have the card, Carl - Cathy ok for c/o
Permanent Occupancy 10/11/199910/11/1999 DONE
Details
BLD-Final10/6/199910/6/199910/6/1999PFAIL
DetailsTom Arcoraci
final fire scheduled for this afternoon not ready for struc final
FIRE-Alarm Testing10/5/199910/6/199910/6/1999PPART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 10/05/1999 at 15:17:04. Contact: ###-####. Ok on alarm system
FIRE-Final Inspection10/6/199910/6/199910/6/1999PPASS
DetailsJoe Tawney
John ###-#### reinsp ok for perm occ
INSP - Final8/27/19998/27/19998/27/1999 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC
INSP-Final Inspection8/24/19998/25/19998/26/1999PFAIL
DetailsJoe Tawney
09/01/99 406 - REINSP FAIL DUCT DET
INSP - Final8/25/19998/25/19998/25/1999 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC
INSP - Final8/24/19998/25/19998/25/1999PFAIL
DetailsCarl Dependahl
08/26/99 340 - GARY ###-####; c/n, eng's letter, grid, other agcy oks...
INSP-Final Inspection8/24/19998/24/19998/24/1999PFAIL
DetailsJoe Tawney
09/01/99 406 - FINAL FAIL C/N ISSUED
INSP-Final Inspection8/25/19998/26/19998/23/1999APART
DetailsJoe Tawney
09/01/99 406 - OK ON AG HYDRO TEST
INSP-Conference8/12/19998/12/19998/12/1999PPART
DetailsJoe Tawney
08/12/99 406 - CONF ON SPKLR COVERAGE OF SOFFITS OK TO COVER
INSP - Wall cover7/31/19998/2/19998/2/1999AFAIL
DetailsTom Arcoraci
08/02/99 408 - grid not ready
INSP - Wall cover8/2/19998/2/19998/2/1999PFAIL
DetailsTom Arcoraci
08/02/99 408 - grid needs end struts on order
INSP - Framing/Rough-in7/28/19997/28/19997/28/1999PFAIL
DetailsCarl Dependahl
grid clg, verbal c/n...gave guidelines to supt.
INSP - Framing/ Rough-in7/27/19997/27/19997/27/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF ONLY: NEED DETAIL FOR CORRIDOR AT EAST SIDE
INSP - Framing/ Rough-in7/21/19997/21/19997/21/1999 PART
DetailsCarl Dependahl
/ / 340 - NEED SURVEYOR'S STATEMENT FOR SETBACKS
INSP - Framing/ Rough-in7/20/19997/20/19997/20/1999 PART
DetailsCarl Dependahl
/ / 340 - NEED DETAIL FOR CORRIDOR
INSP - Energy code compliance7/15/19997/15/19997/15/1999PNR
DetailsTom Arcoraci
07/15/99 408 - Scheduled by Hello!. Contact phone is [6586540].
INSP - Framing/ Rough-in7/15/19997/15/19997/15/1999 PART
DetailsCarl Dependahl
/ / 340 - SPEC INSP ONSITE; MASONRY
INSP-Conference6/29/19996/29/19996/29/1999 PART
DetailsJoe Tawney
/ / 406 - CONF WITH GARY REG SPKLR PROT SOFFITS
INSP - Framing/ Rough-in6/28/19996/28/19996/28/1999 PART
DetailsCarl Dependahl
/ / 340 - OK TO CONTINUE COVER, SOFFITS, INT WALLS
INSP-Sprinkler Rough-in/Hydro6/24/19996/24/19996/24/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND HYDRO TEST
INSP - Framing/ Rough-in6/10/19996/10/19996/10/1999 PART
DetailsCarl Dependahl
/ / 340 - INT SOFFITS, EXT WALLS OK TO INSUL.
INSP - Framing/Rough-in6/9/19996/10/19996/10/1999ACANC
DetailsJim Storey
06/10/99 301 - trans to carl
INSP-Sprinkler Rough-in/Hydro6/10/19996/10/19996/10/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON EXTENDED UNDERGROUND LINE
INSP - Framing/Rough-in6/7/19996/7/19996/7/1999 PART
DetailsCarl Dependahl
/ / 340 - REVIEWING RESUBFOR STRUCT CHANGES; ROOF FRAME OK; NEED ENG'S
INSP - Framing/Rough-in6/3/19996/3/19996/3/1999 FAIL
DetailsCarl Dependahl
/ / 340 - NEED SURVEY STATEMENT; OK TO ROOF, COMPLETE MANSARDS
INSP - Framing/Rough-in6/2/19996/2/19996/2/1999PPART
DetailsCarl Dependahl
06/02/99 340 - ROOFING ###-####-,pend engs report for roof
INSP - Framing/Rough-in5/28/19995/28/19995/28/1999 FAIL
DetailsCarl Dependahl
06/02/99 340 - ROOFING ###-####-, need eng's claification for straps& ot
INSP - Framing/Rough-in5/26/19995/27/19995/27/1999AFAIL
DetailsCarl Dependahl
05/27/99 340 - Ken ###-#### roof;need engs okfor roof as not per plan, p
INSP-Sprinkler Rough-in/Hydro5/20/19995/20/19995/20/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND PIPING
INSP - Framing/Rough-in5/6/19995/7/19995/7/1999APART
DetailsCarl Dependahl
05/07/99 340 - standing structural Gary ###-####;not frame, conc slab; p
INSP - Foundation5/6/19995/6/19995/6/1999 PART
DetailsCarl Dependahl
/ / 340 - CHK'D CONC SPECS, HAS SPEC INSP. PENDING REPORT
INSP - Foundation4/16/19994/16/19994/16/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF ONLY W/ ARCH RE CALCS SUBMITTED
INSP - Framing/Rough-in4/14/19994/14/19994/14/1999 NR
DetailsCarl Dependahl
/ / 340 - QUESTION RE EXIT SIGN, REFERRED TO FIRE/ PLAN REVIEW. CONF O
INSP - Foundation4/6/19994/7/19994/7/1999APART
DetailsCarl Dependahl
04/07/99 340 - GARY ###-####; masonry fnd, has spec insp, pending report
INSP - Foundation4/5/19994/5/19994/5/1999 PART
DetailsCarl Dependahl
/ / 340 - REC'D RESUBMITTAL/CLARIFICATION FOR MASONRY PILASTERS & WALL
INSP - Foundation3/31/19993/31/19993/31/1999 NR
DetailsCarl Dependahl
/ / 340 - REC'D RESUB, NO INSP