BLD-Final | 8/31/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Tom Arcoraci
|
|
|
jeff ###-#### as per conversation 1:30 pm 9/5/2000 10:50:55 AM ok for perm 9/6/2000 8:07:48 AM
|
FIRE-Final Inspection | 8/31/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Joe Tawney
|
|
|
jeff ###-#### as discussed 1:30 pm Reinsp OK for Certificate of completion 9/6/2000 7:49:08 AM
|
Permanent Occupancy | | 9/5/2000 | 9/5/2000 | | DONE |
|
|
|
|
BLD-Final | 8/29/2000 | 8/31/2000 | 8/31/2000 | P | NR |
Carl Dependahl
|
|
|
jefferey ###-#### fn occ; recallwhen ready by 408 8/31/2000 2:58:51 PM
|
FIRE-Final Inspection | 8/29/2000 | 8/31/2000 | 8/31/2000 | P | FAIL |
Joe Tawney
|
|
|
jeffery-- ###-#### fire fn Reinsp Fail AHU shutdown, Cook hood test 8/31/2000 3:37:07 PM
|
FIRE-Final Inspection | 8/10/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Joe Tawney
|
|
|
Ken ###-#### Structural will also be going out pm Fail S/F dampers and detectors 8/18/2000 7:45:10 AM
|
BLD-Final | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 13:33:31. Contact: ###-####. conf 8/16/2000 4:34:15 PM
|
FIRE-Final Inspection | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 13:31:49. Contact: ###-####. fail S/f dampers 8/16/2000 12:30:48 PM
|
BLD-Final | 8/10/2000 | 8/15/2000 | 8/15/2000 | P | PART |
Tom Arcoraci
|
|
|
Ken ###-#### conf 8/15/2000 4:27:07 PM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | PART |
Jim Storey
|
|
|
ceiling inspection Ken Ewing ###-#### west service corridor ok for cover tile under 1 sq/ft must bechecked for clips. 7/17/2000 3:31:37 PM
|
FIRE-Conference | 5/9/2000 | 5/10/2000 | 5/10/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 15:18:51. Contact: ###-####. Conf. with contractor on service corridor & lobby area. 5/11/00 11:47:19 AM
|
BLD-Conference | 5/5/2000 | 5/5/2000 | 5/4/2000 | P | PART |
Tom Arcoraci
|
|
|
Cn issued regarding hood/ceiling.
|
BLD-Conference | 4/27/2000 | 5/1/2000 | 5/1/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 14:03:01. Contact: ###-####. Conf. on service wing constr. 2 1/2 hr. insp.
|
BLD-Conference | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PART |
Joe Tawney
|
|
|
Conf. with contr. regarding last phase of work.
|
BLD-Conference | 4/17/2000 | 4/18/2000 | 4/18/2000 | P | PART |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/17/2000 | 4/17/2000 | 4/17/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 08:25:53. Contact: ###-####. Ok occ. 500 wing 4/18/00 10:41:44 AM
|
FIRE-Final Inspection | 4/13/2000 | 4/14/2000 | 4/14/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp fail smoke/fire damper detectors 4/17/00 9:26:14 AM
|
FIRE-Final Inspection | 4/11/2000 | 4/12/2000 | 4/12/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final fail alarm system faile 4/13/00 8:52:21 AM
|
BLD-Framing/Rough-in | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### Ok to c over WIP on wing 500. 3/8/00 10:37:45 AM
|
BLD-Conference | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | PART |
Tom Arcoraci
|
|
|
Ken; ###-####. 2hr wall conf. 3/2/00 8:51:14 AM
|
BLD-Conference | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | PART |
Tom Arcoraci
|
|
|
fire wall conf\\###-#### 2 hr. wall conf. 2/29/00 3:20:50 PM
|
BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | P | PASS |
Jim Sly
|
|
|
###-####wing 600 ok for temp occ
|
FIRE-Final Inspection | 2/9/2000 | 2/10/2000 | 2/10/2000 | P | PART |
Joe Tawney
|
|
|
###-#### reinspection ok for temp occ of wing 600
|
FIRE-Final Inspection | 2/8/2000 | 2/9/2000 | 2/9/2000 | P | FAIL |
Joe Tawney
|
|
|
James ###-#### alarm system test c/n issued.
|
BLD-Framing/Rough-in | 1/13/2000 | 1/14/2000 | 1/14/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/13/2000 at 22:40:16. Contact: ###-####. 600 wing 2-hr wall. 1/18/00 9:00:38 AM
|
BLD-Conference | 1/7/2000 | 1/10/2000 | 1/10/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 13:00:31. Contact: ###-####. V-1-hr const. Conf.
|
BLD-Conference | 1/6/2000 | 1/7/2000 | 1/7/2000 | A | PART |
Tom Arcoraci
|
|
|
conference James ###-####. Finish in pm.
|
BLD-Final | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | PART |
Tom Arcoraci
|
|
|
PARTIAL FINAL FOR WING 800 JAMES ###-#### ok to occ. Wing 800.
|
FIRE-Final Inspection | 12/28/1999 | 12/29/1999 | 12/29/1999 | P | PART |
Joe Tawney
|
|
|
JAMES ###-#### REINSPECTION. Reinsp. ok for temp. occ. of 800 wing.
|
BLD-Final | 12/23/1999 | 12/28/1999 | 12/28/1999 | P | FAIL |
Tom Arcoraci
|
|
|
wing 800 james ###-####. Conference.
|
FIRE-Final Inspection | 12/23/1999 | 12/28/1999 | 12/28/1999 | A | PART |
Joe Tawney
|
|
|
###-#### james wing 800. Ok on alarm system move one strobe adj. one damper.
|
BLD-Framing/Rough-in | 12/3/1999 | 12/6/1999 | 12/6/1999 | A | FAIL |
Tom Arcoraci
|
|
|
WING 800 JAMES ###-#### Not ready.
|
BLD-Framing/Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PART |
Tom Arcoraci
|
|
|
rescheduled from tom ok to cover part of 2hr wall.
|
BLD-Conference | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | FAIL |
Tom Arcoraci
|
|
|
james--- ###-#### conf C/N.
|
FIRE-Conference | 11/24/1999 | 11/29/1999 | 11/29/1999 | A | PART |
Joe Tawney
|
|
|
JAMES ###-#### Conf. Regarding smoke detectors & horn strobes.
|
BLD-Final | 11/18/1999 | 11/19/1999 | 11/19/1999 | P | PART |
Tom Arcoraci
|
|
|
james ###-#### Area 700 ok for occ.
|
FIRE-Final Inspection | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PART |
Joe Tawney
|
|
|
james ###-#### Reinsp. Ok for occ. Of 700 wing.
|
FIRE-Final Inspection | 11/17/1999 | 11/18/1999 | 11/18/1999 | P | NR |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 22:40:12. Contact: ###-####. not ready
|
BLD-Final | 11/15/1999 | 11/17/1999 | 11/18/1999 | A | FAIL |
Tom Arcoraci
|
|
|
james-- ###-#### fn occ Not ready.
|
FIRE-Final Inspection | 11/15/1999 | 11/16/1999 | 11/17/1999 | A | FAIL |
Joe Tawney
|
|
|
james--- ###-#### fn fire 700 area Roll-up fire not working; alarms tested ok.
|
FIRE-Final Inspection | 11/8/1999 | 11/10/1999 | 11/10/1999 | A | FAIL |
Joe Tawney
|
|
|
wing #700 james ###-#### Corridor/area separation wall penetrations; no alarm???; exit signs; etc.etc.
|
FIRE-Conference | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
Joe Tawney
|
|
|
james---###-#### conf insp Conf. On alarm system and smoke/ fire dampers.
|
BLD-Framing/Rough-in | 10/28/1999 | 10/29/1999 | 10/29/1999 | P | PART |
Tom Arcoraci
|
|
|
JAMES-- ###-####--OK TO COVER 2 hr wall framing.
|
BLD-Wall cover | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | PART |
Carl Dependahl
|
|
|
James ###-#### 408's job: walked w/supt. Need fire assy. For non listed boxes, etc. 2nd layer lid @ SW corner ok to tile. Consulted Tom
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/21/1999 | A | PART |
Tom Arcoraci
|
|
|
cover james ###-#### 2hr wall conference.
|
BLD-Framing/Rough-in | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | PART |
Tom Arcoraci
|
|
|
james-- ###-#### ok to cover/1 HR-CONFERENCE OK TO COER PART EXT WALLS
|
BLD-Framing/Rough-in | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PART |
Tom Arcoraci
|
|
|
JAMES-- ###-####-OK TO COVER Ok to cover ext. walls at selecte areas
|
INSP - Conference | 9/15/1999 | 9/16/1999 | 9/16/1999 | A | PASS |
Tom Arcoraci
|
|
|
1 HR CONSTRCTN CONFERENCE
|
INSP - Foundation | 5/21/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Joe Tawney
|
|
|
05/23/99 406 - PRE CONSTRUCTION CONF WITH CONTR
|
INSP - Foundation | 5/21/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Tom Arcoraci
|
|
|
05/24/99 408 - ###-#### ALAN//PRE CONSTRUCTION CONFERENCE @1:00
|
INSP - Final | 2/4/1999 | 2/4/1999 | 2/4/1999 | P | FAIL |
Carl Dependahl
|
|
|
02/04/99 340 - Issue an Occupancy Violation notice to Integrated Health them to obtain a CO...gave c/n to Debbie Flowers, Administrator. 02/10/99 - A response from the new owners & CSHQA architects regarding the posting of an occupancy violation notice to the tenant. A meeting was held this day and it was agreed and the owner directed the architects to proceed post haste to satisfy the requirements of the building & fire code concerning the occupancy violation for this I1.1 use originally approved as an R-1 elderly housing apartment complex. We agreed on a day of response from the architect or the action of the occupancy violation process would be continued. The architect met the original time although a couple of more submittals were required to get us to the point we are at today. I have met with the architect, Steve Benner & the contractor, CSDI, Jeff Langdon to review te notes made on the plans that would need close attention in the field. I will review the plans with Tom Arcoraci, Structural Inspector to get him up to agrred upon concepts. This occupancy violation is fothwith voided. 4/26/99 - {Processing to issuae permit.
|