Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03044
StatusFinaled
Name SEIDL HOME CO INC
Site Address 517 N QUARRY VIEW PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2544 sq. ft. two story single family dwelling with a 812 sq. ft. attached three car garage and a 216 sq. ft. covered 2nd level wood deck per approved plans, engineering and all red-lining..(1st floor 842 sq. ft.) (2nd floor 1702 sq. ft.) NOTE: THIS LOT IS LOCATED WITHIN A HILLSIDE AREA AND IS SUBJECT TO THE HILLSIDE ORDINANCE. CLASS "A" ROOF SYSTEM AND 30' DEFENSIBLE AREA AROUND STRUCURE REQUIRED. LOWER LEVEL OF THIS STUCTURE QUALIFIES AS 1ST STORY (SECTION 219 1997 UBC) CU #43-90 DJO PC #1013
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/16/19997/16/19997/16/1999APASS
DetailsRuss Owen
see notes on lc.
INSP - Framing/Rough-in7/16/19997/16/19997/16/1999 PASS
DetailsRuss Owen
/ / 407 - WINDOW WILL BE REPLACED AT ON JULY 26TH,PER LETTER,ALSO
INSP - Final7/15/19997/15/19997/15/1999PFAIL
DetailsRuss Owen
07/15/99 407 - John ###-####
INSP - Final7/14/19997/14/19997/14/1999PNR
DetailsRuss Owen
07/14/99 407 - need drainage first.
INSP - Final7/12/19997/12/19997/12/1999PFAIL
DetailsRuss Owen
07/12/99 407 - not ready.
INSP - Energy code compliance5/24/19995/25/19995/25/1999PPASS
DetailsRuss Owen
05/25/99 407 - John ###-####
INSP - Framing/Rough-in5/25/19995/25/19995/25/1999 PASS
DetailsRuss Owen
/ / 407 -
INSP - Framing/Rough-in5/21/19995/24/19995/24/1999PPART
DetailsRuss Owen
05/24/99 407 - ok to insulate 1 coorection left.
INSP - Framing/Rough-in5/18/19995/19/19995/19/1999AFAIL
DetailsRuss Owen
05/19/99 407 - left corrections.;
INSP - Framing/Rough-in5/18/19995/18/19995/18/1999 CANC
DetailsRuss Owen
05/18/99 407 - cancell.
INSP - Framing/Rough-in5/18/19995/18/19995/18/1999 CANC
DetailsRuss Owen
05/18/99 407 - cancell.
INSP - Framing/Rough-in5/17/19995/17/19995/17/1999PPASS
DetailsRuss Owen
05/17/99 407 - letter from engineer ok to side.
INSP - Framing/Rough-in5/14/19995/14/19995/14/1999PFAIL
DetailsRuss Owen
05/14/99 407 - NEED LETTER FROM ENGINEER.
INSP - Framing/Rough-in4/29/19994/30/19994/30/1999AFAIL
DetailsRuss Owen
04/30/99 407 - need engineer to ok engineered features. a written prior
INSP - Framing/Rough-in4/23/19994/26/19994/27/1999AFAIL
DetailsRuss Owen
04/26/99 407 - problems have engineer out to,ok engineered features.
INSP - Foundation2/12/19992/16/19992/16/1999APASS
DetailsRuss Owen
02/16/99 407 - ###-#### john
INSP - Foundation2/5/19992/8/19992/8/1999PPASS
DetailsRuss Owen
02/08/99 407 - footings ok. also letter from soils ok.