INSP - Final | 7/27/1999 | 7/28/1999 | 7/28/1999 | P | PASS |
Russ Owen
|
|
|
07/28/99 407 - FINAL please call prior to coming Matt ###-####
|
INSP - Final | 7/26/1999 | 7/27/1999 | 7/27/1999 | A | FAIL |
Russ Owen
|
|
|
07/27/99 407 - MATT ###-####
|
INSP - Energy code compliance | 3/3/1999 | 3/5/1999 | 3/5/1999 | A | PASS |
Russ Owen
|
|
|
03/05/99 407 - ###-#### CALL FIRST MATT
|
INSP - Final | 3/2/1999 | 3/3/1999 | 3/3/1999 | A | FAIL |
Russ Owen
|
|
|
THIS IS FRAMING INSPECTION NOT A FINAL.
|
INSP - Final | 3/3/1999 | 3/3/1999 | 3/3/1999 | | FAIL |
Russ Owen
|
|
|
03/03/99 407 - framing inspection,left corrections.i
|
INSP - Framing/Rough-in | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | FAIL |
Russ Owen
|
|
|
03/01/99 407 - has corrections and needs truss calcs.
|
INSP - Concrete | 1/7/1999 | 1/7/1999 | 1/7/1999 | P | PART |
Russ Owen
|
|
|
01/07/99 407 - ok except per contractor engineer will allow some holdown
|
INSP - Framing/Rough-in | 1/7/1999 | 1/7/1999 | 1/7/1999 | P | CANC |
Russ Owen
|
|
|
01/07/99 407 - wrong inspection caled in.
|
INSP - Foundation | 1/6/1999 | 1/6/1999 | 1/6/1999 | P | PART |
Russ Owen
|
|
|
01/06/99 407 - footings only at this time. told them to call for wall in
|