BLD-Final | 11/29/1999 | 11/30/1999 | 11/30/1999 | P | FAIL |
|
|
|
Rich ###-#### Elec. Permits 99-00861 and 99-00894 not finaled; I have requested these finals in P.Plan system.
|
FIRE-Final Inspection | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PASS |
Rick Jackson
|
|
|
Rich ###-####
|
INSP - Final | 6/29/1999 | 7/1/1999 | 7/1/1999 | P | PART |
|
|
|
07/01/99 338 - made ok for temp
|
INSP-Final Inspection | 6/29/1999 | 7/1/1999 | 7/1/1999 | A | PART |
Rick Jackson
|
|
|
8:15 as per rick jackson rich ###-#### test elevator recall - temp occ approved
|
INSP-Conference | 6/25/1999 | 6/25/1999 | 6/25/1999 | A | FAIL |
Rick Jackson
|
|
|
left c/n with general contractor
|
INSP-Final Inspection | 6/24/1999 | 6/24/1999 | 6/24/1999 | P | FAIL |
Rick Jackson
|
|
|
alarms not complete; sprinkler problems; extinguishers; c/n issued
|
INSP - Final | 6/17/1999 | 6/18/1999 | 6/18/1999 | P | FAIL |
|
|
|
06/18/99 338 - other agencies not approved
|
INSP-Final Inspection | 6/17/1999 | 6/18/1999 | 6/18/1999 | P | FAIL |
Rick Jackson
|
|
|
Rich ###-#### rated corridor not complete; emergency lights and exit signs
|
INSP-Final Inspection | 6/16/1999 | 6/17/1999 | 6/17/1999 | A | FAIL |
Rick Jackson
|
|
|
RICH ###-#### not a final inspection - reviewed requirements for shell occupancy and tenant for 2nd floor
|
INSP - Framing/Rough-in | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | FAIL |
|
|
|
06/16/99 338 - fyi c/n issued builder has all three copys for finall ins
|
INSP-Supply line flush | 5/21/1999 | 5/21/1999 | 5/21/1999 | A | PASS |
Rick Jackson
|
|
|
underground okay
|
INSP-Conference | 5/6/1999 | 5/6/1999 | 5/5/1999 | A | PASS |
|
|
|
with plan review on the resubmittal repairs of this project
|
INSP-Conference | 4/28/1999 | 4/28/1999 | 4/28/1999 | A | PART |
Rick Jackson
|
|
|
walk through of site with perry and contractor - reviewed plans; sprinkler plans not on site - requested
|
INSP - Framing/Rough-in | 3/17/1999 | 3/18/1999 | 3/18/1999 | A | FAIL |
|
|
|
03/18/99 338 - other agencies not approved, approved plans not available
|
INSP - Framing/Rough-in | 2/12/1999 | 2/12/1999 | 2/12/1999 | | PART |
|
|
|
02/12/99 338 - ok for covr of the stair walls inside only
|
INSP - Framing/Rough-in | 2/5/1999 | 2/8/1999 | 2/8/1999 | A | FAIL |
|
|
|
02/08/99 338 - c/n issued
|
INSP - Framing/Rough-in | 2/4/1999 | 2/5/1999 | 2/5/1999 | P | FAIL |
|
|
|
02/05/99 338 - cancelled again by the contractor
|
INSP - Framing/Rough-in | 2/3/1999 | 2/4/1999 | 2/4/1999 | P | FAIL |
|
|
|
02/04/99 338 - cancelled by the contractor
|
INSP - Framing/Rough-in | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | PART |
|
|
|
made ok to nail shear walls all nailing to be completed prior to the signoffs.
|
INSP - Framing/Rough-in | 12/29/1998 | 12/30/1998 | 12/30/1998 | A | FAIL |
|
|
|
12/30/98 333 - not ready talked to Mike about stair, hoolddown and beari
|
INSP - Foundation | 11/19/1998 | 11/20/1998 | 11/20/1998 | A | PASS |
|
|
|
11/20/98 333 - FDN -OK FOUNDATION
|
INSP - Framing/Rough-in | 11/13/1998 | 11/16/1998 | 11/16/1998 | A | PART |
|
|
|
11/16/98 333 - floor at crawl space area ok
|