INSP - Framing/Rough-in | 4/22/1999 | 4/26/1999 | 4/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
04/26/99 340 - ###-#### GEORGE//ROOF COVER; need nails aT BLOCKING
|
INSP - Final | 6/3/1999 | 6/3/1999 | 6/3/1999 | | PASS |
Carl Dependahl
|
|
|
06/03/99 340 - ###-#### PGR//FINAL AS EARLY AS POSSIBLE card to cont.
|
INSP - Final | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | PASS |
Carl Dependahl
|
|
|
06/03/99 340 - ###-#### PGR//FINAL AS EARLY AS POSSIBLE
|
INSP - Final | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
Jim Storey
|
|
|
06/01/99 301 - temp ok pending p/z
|
INSP - Final | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
Jim Storey
|
|
|
06/01/99 301 - temp ok pending p/z
|
INSP-Final Inspection | 5/28/1999 | 6/1/1999 | 6/1/1999 | A | PASS |
Joe Tawney
|
|
|
06/01/99 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 5/26/1999 | 5/27/1999 | 5/27/1999 | P | FAIL |
Carl Dependahl
|
|
|
05/27/99 340 - Georege###-####
|
INSP-Final Inspection | 5/26/1999 | 5/27/1999 | 5/27/1999 | P | FAIL |
Joe Tawney
|
|
|
05/27/99 406 - REINSP FAIL FIRE EXT FD ACCESS
|
INSP-Final Inspection | 5/18/1999 | 5/18/1999 | 5/18/1999 | | FAIL |
Joe Tawney
|
|
|
05/18/99 406 - FINAL FAIL PLAN REV NOTES, DOOR HDWRE, FIRE EXT
|
INSP - Framing/Rough-in | 5/7/1999 | 5/10/1999 | 5/11/1999 | P | PART |
Carl Dependahl
|
|
|
05/10/99 340 - framing/George ###-####;anchors added, ok to delete ledge
|
INSP - Framing/Rough-in | 5/4/1999 | 5/5/1999 | 5/5/1999 | A | FAIL |
Russ Owen
|
|
|
05/05/99 407 - has correction notice.
|
INSP - Framing/Rough-in | 4/12/1999 | 4/13/1999 | 4/16/1999 | A | PART |
Carl Dependahl
|
|
|
04/13/99 340 - ###-#### GEORGE//PARTIAL ROOF COVER, roof deck ok; need f
|
INSP - Concrete | 4/2/1999 | 4/7/1999 | 4/7/1999 | A | PART |
Carl Dependahl
|
|
|
04/07/99 340 - ###-#### GEORGE//GROUTING CMU WALLS, 2nd lift, so. wall
|
INSP - Concrete | 4/2/1999 | 4/6/1999 | 4/6/1999 | A | NR |
Tom Arcoraci
|
|
|
###-#### GEORGE//GROUTING CMU WALLS
|
INSP - Foundation | 4/6/1999 | 4/6/1999 | 4/6/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF. ONLY W/ SUPT RE MASONRY AT SOUTH WALL
|
INSP - Concrete | 4/2/1999 | 4/5/1999 | 4/5/1999 | A | PART |
Carl Dependahl
|
|
|
04/05/99 340 - ###-#### GEORGE//GROUTING CMU WALLS; 1ST LIFT, SOUTH WALL
|
INSP - Framing/Rough-in | 4/2/1999 | 4/2/1999 | 4/2/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF RE EAST UNITS, OK TO ROOF TO AREA WALL
|
INSP - Framing/Rough-in | 3/26/1999 | 3/30/1999 | 3/30/1999 | A | FAIL |
Carl Dependahl
|
|
|
03/30/99 340 - ###-#### GEORGE//RI FRAMING storage units east side, nail sheathing at sills, add straps at butt jts
|
INSP - Framing/Rough-in | 3/29/1999 | 3/29/1999 | 3/29/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF ONLY W/ FRAMER
|
INSP - Concrete | 3/19/1999 | 3/22/1999 | 3/22/1999 | A | PART |
Carl Dependahl
|
|
|
03/22/99 340 - ###-#### GEORGE//CEMENT SLAB
|
INSP - Framing/Rough-in | 3/19/1999 | 3/22/1999 | 3/22/1999 | A | PART |
Carl Dependahl
|
|
|
03/22/99 340 - ###-#### GEORGE//FINAL FRAMING COVER IN OFFICE office ok to cover
|
INSP - Framing/Rough-in | 3/22/1999 | 3/22/1999 | 3/22/1999 | A | PART |
Carl Dependahl
|
|
|
office only ok to cover
|
INSP - Framing/Rough-in | 3/17/1999 | 3/18/1999 | 3/18/1999 | A | FAIL |
Carl Dependahl
|
|
|
03/18/99 340 - ###-#### GEORGE//PARTIAL COVER OFFICE AREA CN, SHEAR PANELS, OK TO COVER AS NOTED
|
INSP - Concrete | 3/15/1999 | 3/16/1999 | 3/16/1999 | A | PART |
Carl Dependahl
|
|
|
03/16/99 340 - ###-#### george SLABS
|
INSP - Final | 3/10/1999 | 3/12/1999 | 3/12/1999 | A | FAIL |
Carl Dependahl
|
|
|
03/12/99 340 - ###-#### GEORGE//FINAL FRAMING IN OFFICE AREA not a final, nr
|
INSP - Concrete | 3/10/1999 | 3/11/1999 | 3/11/1999 | A | PART |
Carl Dependahl
|
|
|
03/11/99 340 - int sep wall, 2nd lift
|
INSP - Concrete | 3/11/1999 | 3/11/1999 | 3/11/1999 | P | PART |
Carl Dependahl
|
|
|
MASONARY WALLS\\###-####...cross wall, 2nd lift ok
|
INSP - Concrete | 3/8/1999 | 3/8/1999 | 3/8/1999 | P | PART |
Carl Dependahl
|
|
|
LATE AFTERNOON GEORGE ###-####...part, masonry at west wall, not complete.
|
INSP - Framing/Rough-in | 3/5/1999 | 3/5/1999 | 3/5/1999 | | PART |
|
|
|
|
INSP - Framing/Rough-in | 3/5/1999 | 3/5/1999 | 3/5/1999 | | PART |
Jim Sly
|
|
|
03/05/99 316 - Roof nailing.....OK
|
INSP - Framing/Rough-in | 3/4/1999 | 3/5/1999 | 3/5/1999 | A | PART |
Jim Sly
|
|
|
03/05/99 316 - Roof nailing only....OK
|
INSP - Concrete | 2/16/1999 | 2/18/1999 | 2/18/1999 | P | FAIL |
Jim Sly
|
|
|
02/18/99 316 - slab George ###-#### or ###-#### pager. If rains, will p friday No one at jobsite.
|
INSP - Concrete | 2/12/1999 | 2/16/1999 | 2/16/1999 | A | PART |
Carl Dependahl
|
|
|
02/16/99 340 - ###-#### geroge\\###-#### pager\\\stor-it met w/ supt at
|
INSP - Concrete | 2/12/1999 | 2/12/1999 | 2/12/1999 | | PART |
Carl Dependahl
|
|
|
02/12/99 340 - slab george ###-####-###-#### pager
|
INSP - Foundation | 1/28/1999 | 1/28/1999 | 1/28/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - frost wall ok
|
INSP - Wall cover | 1/27/1999 | 1/28/1999 | 1/28/1999 | A | CANC |
Carl Dependahl
|
|
|
01/28/99 340 - GEORGE..###-####
|
INSP - Foundation | 1/25/1999 | 1/27/1999 | 1/27/1999 | A | NR |
Carl Dependahl
|
|
|
01/27/99 340 - george ###-####, gave to 338
|
INSP - Foundation | 1/19/1999 | 1/19/1999 | 1/19/1999 | P | PART |
Tom Arcoraci
|
|
|
01/19/99 408 - GEORGE ###-#### OR ###-#### OFFICE FOUNDATION wall at office ok
|
INSP - Foundation | 1/12/1999 | 1/14/1999 | 1/14/1999 | A | CANC |
Tom Arcoraci
|
|
|
01/14/99 408 - GEORGE ###-#### OR ###-#### done by 338
|
INSP - Foundation | 1/11/1999 | 1/12/1999 | 1/12/1999 | A | PART |
|
|
|
01/12/99 338 - made ok to pour r-bar is placed and weather protection is
|
INSP - Foundation | 1/7/1999 | 1/8/1999 | 1/8/1999 | A | PART |
|
|
|
01/08/99 338 - madeok to pour concrete with r- bar placed
|
INSP - Foundation | 1/6/1999 | 1/7/1999 | 1/7/1999 | A | PART |
|
|
|
01/07/99 338 - made ok to pour with the r-bar placed
|
INSP - Foundation | 12/14/1998 | 12/15/1998 | 12/15/1998 | P | FAIL |
|
|
|
12/15/98 338 - JIM..###-#### PAGER no call from contr poured w/o insp
|