Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03661
StatusFinaled
Name Y M C A
Site Address 1050 W STATE ST
Project NameYMCA
Customer Number 
ePlanReviewNo
Description
ADDITIONS AND MODIFICATIONS TO THE EXISTING PARKING SITE AND YMCA BUILDING. WORK TO INCLUDE A REMODEL OF THE EXISTING BUILDING AND TO CONSTRUCT TWO ADDTITIONS TO THE EXISTING BUILDING WHICH INCLUDES NEW SWIMMING POOL, EXCERCISE ROOMS, MECHANICAL ROOMS, CONFERENCE ROOM AND LOCKER ROOM. THE UPGRADE TO THE EXISTING BUILDING WILL CHANGE THE TYPE OF CONSTRUCTION TO TYPE III-1HR. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS. DRH98-0136, CUP98-72, PC#802-98 THIS BUILDING IS FULLY FIRE SPRINKLERED FOR AN AREA INCREASE. STATE ST. ADDITION WILL BE ONE STORY WITH A BASEMENT AND MEZZANINE, WASHINGTON ST. WILL BE TWO STORY WITH AN OCCUPIED ROOF.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/2/20018/2/2001 DONE
Details
BLD-Conference6/7/20016/7/20016/7/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/7/2001 8:34:40 AM ok to delete panic at activity rm... floor area is marginal & largely occupied by semi-fixed tables; consulted w/ Mike Otto. Also rec'd eng's & spec. insps reports ok. 6/7/2001 8:35:15 AM
BLD-Final6/6/20016/7/20016/7/2001APASS
DetailsCarl Dependahl
###-####
BLD-Conference6/6/20016/6/20016/6/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/6/2001 3:53:49 PM w/ Jordan Wilcomb re final
BLD-Conference5/21/20015/21/20015/21/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/21/2001 3:57:25 PM no final til eng's letters approved
BLD-Conference5/1/20015/1/20015/1/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/1/2001 4:39:07 PM w/ arch re c/n
BLD-Final4/24/20014/25/20014/25/2001AFAIL
DetailsCarl Dependahl
###-####; c/n, need panic at doors from rm 107 & eng's /spec insp's affidavits. 4/25/2001 2:01:42 PM
FIRE-Final Inspection2/14/20012/16/20012/16/2001APASS
DetailsRick Jackson
###-####
FIRE-Final Inspection10/23/200010/31/200010/31/2000AFAIL
DetailsRick Jackson
FIRE FN -JIM ###-#### c/n issued 10/31/2000 11:13:41 AM
BLD-Framing/Rough-in9/18/20009/19/20009/19/2000APART
Details
###-#### ceiling grid ceiling. rated ok on the 2nd floor rated 9/19/2000 9:58:38 AM
FIRE-Conference9/13/20009/14/20009/14/2000APART
DetailsRick Jackson
###-#### okay to occupy the womens locker and roof playground. 9/14/2000 9:48:45 AM
BLD-Framing/Rough-in9/8/20009/11/20009/11/2000AFAIL
Details
###-#### 2nd floor rated ceiling, must follow eng to the letter, c/n issued 9/12/2000 10:01:54 AM
BLD-Other12/15/200012/15/20009/9/2000 DONE
After consult with m otto I approved 81/2 by 11 submittals for the area "b" classroo 183 through old storage room closing off exist 2nd exit etc..pep 12/15/2K
BLD-Conference9/6/20009/7/20009/7/2000APART
Details
FOR CONF JIM-- ###-#### must review with m otto 9/7/2000 3:13:30 PM
BLD-Conference8/28/20009/1/20009/1/2000APART
Details
###-#### madeok to occ upy the pool area 9/1/2000 4:05:52 PM
FIRE-Conference9/1/20009/1/20009/1/2000PPART
DetailsRick Jackson
###-#### Jim checked life safety for the new pool area; exits and alarms okay. gave approval to use the pool effective 9/5/00 9/1/2000 2:41:49 PM
FIRE-Conference8/28/20008/31/20008/31/2000APART
DetailsRick Jackson
###-#### diwscussed requireements of opening pool area 8/31/2000 10:54:13 AM
BLD-Framing/Rough-in8/23/20008/24/20008/24/2000APART
Details
JIM ###-#### CEILING GRID ceiling room adj to the pool 8/24/2000 10:15:17 AM
BLD-Framing/Rough-in8/1/20008/2/20008/2/2000APART
Details
Jim ###-#### on the type of assy to use on the 2nd floor corridor assy 8/2/2000 10:41:16 AM
FIRE-Conference7/31/20008/2/20008/1/2000APART
DetailsRick Jackson
###-#### Jim okay to occupy basement offices 8/1/2000 3:36:06 PM
BLD-Framing/Rough-in7/25/20007/26/20007/26/2000APART
Details
JIM ###-#### FR on the stair rated ceiling system. 7/26/00 11:13:10 AM
BLD-Framing/Rough-in7/17/20007/18/20007/18/2000PCANC
DetailsRuss Owen
###-####
FIRE-Conference7/17/20007/18/20007/18/2000PPART
DetailsRick Jackson
###-#### Do not occupy basement until 1hr corridor is complete 7/19/00 10:07:22 AM
FIRE-Conference7/17/20007/18/20007/18/2000PPART
DetailsRick Jackson
###-####
FIRE-Conference7/13/20007/14/20007/14/2000APART
DetailsRick Jackson
###-####; okay to occupy the cardio vascular room
FIRE-Conference7/7/20007/10/20007/10/2000APART
DetailsRick Jackson
Jim ###-#### REquirements to open cardio room- exit sign; proper stores; exit path unobstructed; C/N issued. 7/11/00 11:38:38 AM
BLD-Framing/Rough-in6/30/20007/3/20007/3/2000APART
Details
###-#### ceiling grid ceiling made ok to drop in tiles igh ceiling adj to the pool 7/6/00 2:00:20 PM
BLD-Framing/Rough-in6/26/20006/26/20006/26/2000PPART
Details
###-#### ceiling grid ceilings in the 1st and bsmt verbal need to confirm all slack wireing 6/27/00 4:31:18 PM
BLD-Framing/Rough-in6/19/20006/19/20006/19/2000APART
Details
Scheduled by Inspector: 338 On 6/19/00 ceiling grid jim made ok with other agencies approvals 6/20/00 10:19:01 AM
BLD-Framing/Rough-in6/14/20006/15/20006/15/2000ACANC
Details
jim ###-#### ceiling grid insp out of time 6/19/00 6:50:08 AM
BLD-Framing/Rough-in5/31/20005/31/20005/31/2000PPASS
Details
CEILING GRID--- JIM ###-#### ok to drop in the tiles 5/31/00 4:41:24 PM
FIRE-Conference5/17/20005/18/20005/18/2000PPART
DetailsRick Jackson
jim ###-#### fire conf--around 1:00 Okay to occupy front lobby office area. 5/22/00 9:01:08 AM
BLD-Framing/Rough-in4/24/20004/24/20004/24/2000PPART
Details
ceiling grid jim ###-#### ok to dropin the tiles for the new gymnewhall ok 4/24/00 2:35:50 PM
FIRE-Final Inspection4/24/20004/24/20004/24/2000PFAIL
DetailsRick Jackson
reinspection jim ###-#### Conference to determine criteria to use new gymnasium. 4/26/00 11:58:05 AM
BLD-Framing/Rough-in4/20/20004/21/20004/21/2000APART
Details
ceiling grid---jim ###-#### c/n issued slack wires required on diffusers or attach positively to the main runner or crosstee that is supported by wires 04/21/2000 10:33:48 AM
BLD-Framing/Rough-in4/11/20004/12/20004/12/2000PPART
Details
###-#### ceiling oktto drop in tiles with secure of the diffusers (no caddy clips) gym ceiling 04/12/2000
BLD-Conference3/28/20003/29/20003/29/2000APART
Details
###-#### with jim (jw) robert (hlr) and myself conf on the occupancy of the new 2nd floor gym for the temp exercise room, will be ok to use if there are two complete exits. also.discussed the use of existing doors in rated walls, if doors are moved they must be replaced; all doors are to have approved hardware aemblies; all glazing is to be in proper frames... 3/30/00 10:04:22 AM
FIRE-Final Inspection3/28/20003/29/20003/29/2000PFAIL
DetailsRick Jackson
###-#### Not a final- ok to occupy west activity room. 3/30/00 11:02:29 AM
BLD-Framing/Rough-in3/21/20003/22/20003/22/2000APART
Details
ceiling grid Jim ###-#### ceiling grid at main level entry 03/22/2000 2:00:14 PM
FIRE-Final Inspection3/16/20003/17/20003/17/2000AFAIL
DetailsRick Jackson
JIM ###-#### FIRE FN Not a final inspection- conferencce. 3/20/00 10:27:52 AM
BLD-Framing/Rough-in3/9/20003/9/20003/9/2000PFAIL
Details
jim ###-#### c/n issued confirn F R of the display cabinets in wall between RR-163 and corridor158...stasir 143 ..94ubc sec 1009.3 pp 1no piping other than standpipe etc allowed. 3/9/00 10:41:08 AM
FIRE-Conference3/7/20003/7/20003/7/2000PPART
DetailsRick Jackson
jim ###-#### fire conf fire extinguisher placement with architect. 3/8/00 10:09:19 AM
BLD-Framing/Rough-in3/2/20003/2/20003/2/2000PPART
Details
jim ###-#### fr ok to cover behind ele mech and plmg this area 3/2/00 3:48:54 PM
BLD-Framing/Rough-in2/24/20002/25/20002/25/2000PPART
Details
###-####
FIRE-Sprinkler Rough-in2/10/20002/11/20002/11/2000PPART
DetailsRick Jackson
jim ###-#### ; need 1 hour corridor to use north addition
BLD-Framing/Rough-in2/2/20002/3/20002/3/2000APART
Details
jim ###-#### made ok to cover tis selected area 2/14/00 11:13:01 AM
FIRE-Conference2/3/20002/3/20002/3/2000 PART
DetailsRick Jackson
discussed location of annunciator panel
BLD-Framing/Rough-in1/26/20001/27/20001/27/2000PPART
Details
ceiling grid \###-#### made ok to drop in tiles this area 1/27/00 6:33:47 PM
BLD-Conference1/6/20001/11/20001/11/2000APASS
Details
###-####- jim for conf with architects and the contractor on stairrails and for combustability of cedar in saunas
BLD-Other1/6/20001/11/20001/11/2000APASS
Details
jobsitewalkthrough with arch and contr.about handrails and fire resistive req for saunas
BLD-Conference1/6/20001/6/20001/6/2000APASS
Details
with john larsen to set up time for walk through an tues 1/11/00 with all parties involved.
BLD-Framing/Rough-in12/21/199912/22/199912/23/1999PPART
Details
jim ###-####. Ok to cover.
FIRE-Sprinkler Rough-in12/22/199912/22/199912/22/1999PPART
DetailsRick Jackson
special needs and janitor closet okay to cover
FIRE-Conference12/14/199912/14/199912/14/1999PPART
DetailsRick Jackson
jim ###-#### conf To use new locker room- exiting requirements must be required before using.
BLD-Conference12/9/199912/9/199912/9/1999PPART
Details
jim ###-#### Received plan schedule for phased occupancy.
BLD-Framing/Rough-in11/16/199911/17/199911/17/1999PPART
Details
JIM ###-#### made ok for 2nd floor ceiling frame around elevator shaft.
BLD-Framing/Rough-in11/9/199911/9/199911/9/1999PPART
Details
JIM-- ###-#### -CEILING GRID INSP Ok to drop in ceiling tiles basement room ok to cover outside of Ele. Shaft @ W side.
BLD-Foundation11/2/199911/3/199911/3/1999APART
Details
grid line A 7-3 made ok w/sp insp approval.
BLD-Conference10/12/199910/14/199910/14/1999APART
Details
at 9 am Jim ###-#### Smoke conf. Post poned until 10/18/99
BLD-Concrete9/27/19999/27/19999/27/1999PPART
Details
JIM-- ###-####--REBAR & CONCRETE--GRID LINE A LINE FROM 12 TO 7 Made ok with sp. Msp. Approval
BLD-Conference9/23/19999/24/19999/24/1999APART
Details
JIM-- ###-#### CONF Jim/JW Bob H/Larson stair #172 A2.15 address light box penetration
INSP - Conference9/8/19999/10/19999/10/1999APART
Details
ONSITE CONFERANCE, JIM and moke otto walked jobsite and discusses lifesafety and exiting requirements and for the protection of the building occupants during construction ###-####
INSP - Foundation9/8/19999/9/19999/9/1999APART
Details
REBAR AND CONCRETE, GRID LINE 12, D-A, JIM ###-#### sp insp made ok
INSP - Concrete8/30/19998/31/19998/31/1999APART
Details
08/31/99 338 - REBAR POUR GRID LINE 12 D TO A JIM ###-#### SP INSP APP
INSP - Concrete8/20/19998/20/19998/20/1999PPART
DetailsJim Storey
08/20/99 301 - JIM ###-####. GRID LINE 2 FROM D-C. covered by special in
INSP - Concrete8/9/19998/10/19998/10/1999PPART
Details
08/10/99 338 - JIM ###-####. ENTERY WALLS OF NORTH ADDITION-SHEET F2 C ON S14. r-bar placed sp insp on site
INSP-Conference8/4/19998/4/19998/4/1999 PART
Received letter of transmittal from arch on the project for an appeal on fire protection rating of exterior columns. Per supervisor an appeal shall be taken to the appeals board. This paperwork is delivered to M. Southard.
INSP - Concrete7/28/19997/29/19997/29/1999PPART
Details
07/29/99 338 - MADE OK WITH SP INSP APPROVALS
INSP - Foundation7/20/19997/21/19997/21/1999PPART
Details
07/21/99 338 - BEAMS AND FOUNDATION NORTH ADDITION JIM ###-#### made ok
INSP-Conference7/21/19997/21/19997/21/1999 PART
With Bob Howard, recieved details of the proposed tempory stairs from the natatorium when the doors at the southwest corner are made unsafe to use. Wood is allowed in this type of construction as long as it is of 2" nom thickness. All other requirements for the stairs must comply with ubc chap. 10. will relay answer on the forms submitted by fax and return by fax to arch. see file.
INSP-Conference7/21/19997/21/19997/21/1999PPART
Details
bob with the Arch, firm of Hosford-Larson-Rudeen with questions on the temp stairs at the pool area near the new elevator shaft. wood framing is acceptable as long as all codes for rise run, rails and landings comply. also confirmed that two (2) exits are required for the pool area if it is in use. Covered walkway protection may be required for the main exit from the pool area.
INSP - Foundation7/7/19997/8/19997/7/1999PPART
Details
REBAR JIM ###-#### COLUMN PADS 11.3 12 LINE AND N SP INSP MADE OK 338
INSP - Concrete6/28/19996/29/19996/28/1999PPART
Details
06/29/99 338 - grid line N and 8 and 9 made ok with sp insp approvals
INSP - Foundation6/18/19996/21/19996/21/1999APART
Details
06/21/99 338 - Grid Line L and 6 Jim ###-#### ok with sp insp
INSP - Concrete6/9/19996/10/19996/10/1999APART
DetailsWes Worcester
06/10/99 342 - JIM ###-#### no answer, still tying bar,spec insp??? FOUN
INSP - Foundation6/3/19996/4/19996/4/1999APART
Details
06/04/99 338 - madeok to pour with sp insp approvals
INSP - Foundation6/2/19996/3/19996/3/1999APART
Details
06/03/99 338 - ###-####//REBAR FOOTING & WALL ON GRID 6 & L sp insp made
INSP - Foundation6/2/19996/2/19996/2/1999 PART
Details
06/02/99 338 - madeok conf with sp insp eng ctr and arch on concrete sch
INSP - Foundation6/2/19996/2/19996/2/1999 PART
Details
06/02/99 338 - conf on the concrete design placement and insp with arch,