Permanent Occupancy | | 8/2/2001 | 8/2/2001 | | DONE |
|
|
|
|
BLD-Conference | 6/7/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/7/2001 8:34:40 AM ok to delete panic at activity rm... floor area is marginal & largely occupied by semi-fixed tables; consulted w/ Mike Otto. Also rec'd eng's & spec. insps reports ok. 6/7/2001 8:35:15 AM
|
BLD-Final | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/6/2001 3:53:49 PM w/ Jordan Wilcomb re final
|
BLD-Conference | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/21/2001 3:57:25 PM no final til eng's letters approved
|
BLD-Conference | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/1/2001 4:39:07 PM w/ arch re c/n
|
BLD-Final | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; c/n, need panic at doors from rm 107 & eng's /spec insp's affidavits. 4/25/2001 2:01:42 PM
|
FIRE-Final Inspection | 2/14/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
FIRE-Final Inspection | 10/23/2000 | 10/31/2000 | 10/31/2000 | A | FAIL |
Rick Jackson
|
|
|
FIRE FN -JIM ###-#### c/n issued 10/31/2000 11:13:41 AM
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
|
|
|
###-#### ceiling grid ceiling. rated ok on the 2nd floor rated 9/19/2000 9:58:38 AM
|
FIRE-Conference | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | PART |
Rick Jackson
|
|
|
###-#### okay to occupy the womens locker and roof playground. 9/14/2000 9:48:45 AM
|
BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | FAIL |
|
|
|
###-#### 2nd floor rated ceiling, must follow eng to the letter, c/n issued 9/12/2000 10:01:54 AM
|
BLD-Other | 12/15/2000 | 12/15/2000 | 9/9/2000 | | DONE |
|
|
|
After consult with m otto I approved 81/2 by 11 submittals for the area "b" classroo 183 through old storage room closing off exist 2nd exit etc..pep 12/15/2K
|
BLD-Conference | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PART |
|
|
|
FOR CONF JIM-- ###-#### must review with m otto 9/7/2000 3:13:30 PM
|
BLD-Conference | 8/28/2000 | 9/1/2000 | 9/1/2000 | A | PART |
|
|
|
###-#### madeok to occ upy the pool area 9/1/2000 4:05:52 PM
|
FIRE-Conference | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PART |
Rick Jackson
|
|
|
###-#### Jim checked life safety for the new pool area; exits and alarms okay. gave approval to use the pool effective 9/5/00 9/1/2000 2:41:49 PM
|
FIRE-Conference | 8/28/2000 | 8/31/2000 | 8/31/2000 | A | PART |
Rick Jackson
|
|
|
###-#### diwscussed requireements of opening pool area 8/31/2000 10:54:13 AM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
|
|
|
JIM ###-#### CEILING GRID ceiling room adj to the pool 8/24/2000 10:15:17 AM
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
|
|
|
Jim ###-#### on the type of assy to use on the 2nd floor corridor assy 8/2/2000 10:41:16 AM
|
FIRE-Conference | 7/31/2000 | 8/2/2000 | 8/1/2000 | A | PART |
Rick Jackson
|
|
|
###-#### Jim okay to occupy basement offices 8/1/2000 3:36:06 PM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PART |
|
|
|
JIM ###-#### FR on the stair rated ceiling system. 7/26/00 11:13:10 AM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | CANC |
Russ Owen
|
|
|
###-####
|
FIRE-Conference | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | PART |
Rick Jackson
|
|
|
###-#### Do not occupy basement until 1hr corridor is complete 7/19/00 10:07:22 AM
|
FIRE-Conference | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | PART |
Rick Jackson
|
|
|
###-####
|
FIRE-Conference | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Rick Jackson
|
|
|
###-####; okay to occupy the cardio vascular room
|
FIRE-Conference | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | PART |
Rick Jackson
|
|
|
Jim ###-#### REquirements to open cardio room- exit sign; proper stores; exit path unobstructed; C/N issued. 7/11/00 11:38:38 AM
|
BLD-Framing/Rough-in | 6/30/2000 | 7/3/2000 | 7/3/2000 | A | PART |
|
|
|
###-#### ceiling grid ceiling made ok to drop in tiles igh ceiling adj to the pool 7/6/00 2:00:20 PM
|
BLD-Framing/Rough-in | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | PART |
|
|
|
###-#### ceiling grid ceilings in the 1st and bsmt verbal need to confirm all slack wireing 6/27/00 4:31:18 PM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 6/19/00 ceiling grid jim made ok with other agencies approvals 6/20/00 10:19:01 AM
|
BLD-Framing/Rough-in | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | CANC |
|
|
|
jim ###-#### ceiling grid insp out of time 6/19/00 6:50:08 AM
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | PASS |
|
|
|
CEILING GRID--- JIM ###-#### ok to drop in the tiles 5/31/00 4:41:24 PM
|
FIRE-Conference | 5/17/2000 | 5/18/2000 | 5/18/2000 | P | PART |
Rick Jackson
|
|
|
jim ###-#### fire conf--around 1:00 Okay to occupy front lobby office area. 5/22/00 9:01:08 AM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PART |
|
|
|
ceiling grid jim ###-#### ok to dropin the tiles for the new gymnewhall ok 4/24/00 2:35:50 PM
|
FIRE-Final Inspection | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Rick Jackson
|
|
|
reinspection jim ###-#### Conference to determine criteria to use new gymnasium. 4/26/00 11:58:05 AM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PART |
|
|
|
ceiling grid---jim ###-#### c/n issued slack wires required on diffusers or attach positively to the main runner or crosstee that is supported by wires 04/21/2000 10:33:48 AM
|
BLD-Framing/Rough-in | 4/11/2000 | 4/12/2000 | 4/12/2000 | P | PART |
|
|
|
###-#### ceiling oktto drop in tiles with secure of the diffusers (no caddy clips) gym ceiling 04/12/2000
|
BLD-Conference | 3/28/2000 | 3/29/2000 | 3/29/2000 | A | PART |
|
|
|
###-#### with jim (jw) robert (hlr) and myself conf on the occupancy of the new 2nd floor gym for the temp exercise room, will be ok to use if there are two complete exits. also.discussed the use of existing doors in rated walls, if doors are moved they must be replaced; all doors are to have approved hardware aemblies; all glazing is to be in proper frames... 3/30/00 10:04:22 AM
|
FIRE-Final Inspection | 3/28/2000 | 3/29/2000 | 3/29/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### Not a final- ok to occupy west activity room. 3/30/00 11:02:29 AM
|
BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
|
|
|
ceiling grid Jim ###-#### ceiling grid at main level entry 03/22/2000 2:00:14 PM
|
FIRE-Final Inspection | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | FAIL |
Rick Jackson
|
|
|
JIM ###-#### FIRE FN Not a final inspection- conferencce. 3/20/00 10:27:52 AM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/9/2000 | 3/9/2000 | P | FAIL |
|
|
|
jim ###-#### c/n issued confirn F R of the display cabinets in wall between RR-163 and corridor158...stasir 143 ..94ubc sec 1009.3 pp 1no piping other than standpipe etc allowed. 3/9/00 10:41:08 AM
|
FIRE-Conference | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Rick Jackson
|
|
|
jim ###-#### fire conf fire extinguisher placement with architect. 3/8/00 10:09:19 AM
|
BLD-Framing/Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PART |
|
|
|
jim ###-#### fr ok to cover behind ele mech and plmg this area 3/2/00 3:48:54 PM
|
BLD-Framing/Rough-in | 2/24/2000 | 2/25/2000 | 2/25/2000 | P | PART |
|
|
|
###-####
|
FIRE-Sprinkler Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | P | PART |
Rick Jackson
|
|
|
jim ###-#### ; need 1 hour corridor to use north addition
|
BLD-Framing/Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PART |
|
|
|
jim ###-#### made ok to cover tis selected area 2/14/00 11:13:01 AM
|
FIRE-Conference | 2/3/2000 | 2/3/2000 | 2/3/2000 | | PART |
Rick Jackson
|
|
|
discussed location of annunciator panel
|
BLD-Framing/Rough-in | 1/26/2000 | 1/27/2000 | 1/27/2000 | P | PART |
|
|
|
ceiling grid \###-#### made ok to drop in tiles this area 1/27/00 6:33:47 PM
|
BLD-Conference | 1/6/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
|
|
|
###-####- jim for conf with architects and the contractor on stairrails and for combustability of cedar in saunas
|
BLD-Other | 1/6/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
|
|
|
jobsitewalkthrough with arch and contr.about handrails and fire resistive req for saunas
|
BLD-Conference | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | PASS |
|
|
|
with john larsen to set up time for walk through an tues 1/11/00 with all parties involved.
|
BLD-Framing/Rough-in | 12/21/1999 | 12/22/1999 | 12/23/1999 | P | PART |
|
|
|
jim ###-####. Ok to cover.
|
FIRE-Sprinkler Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PART |
Rick Jackson
|
|
|
special needs and janitor closet okay to cover
|
FIRE-Conference | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PART |
Rick Jackson
|
|
|
jim ###-#### conf To use new locker room- exiting requirements must be required before using.
|
BLD-Conference | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PART |
|
|
|
jim ###-#### Received plan schedule for phased occupancy.
|
BLD-Framing/Rough-in | 11/16/1999 | 11/17/1999 | 11/17/1999 | P | PART |
|
|
|
JIM ###-#### made ok for 2nd floor ceiling frame around elevator shaft.
|
BLD-Framing/Rough-in | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PART |
|
|
|
JIM-- ###-#### -CEILING GRID INSP Ok to drop in ceiling tiles basement room ok to cover outside of Ele. Shaft @ W side.
|
BLD-Foundation | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
|
|
|
grid line A 7-3 made ok w/sp insp approval.
|
BLD-Conference | 10/12/1999 | 10/14/1999 | 10/14/1999 | A | PART |
|
|
|
at 9 am Jim ###-#### Smoke conf. Post poned until 10/18/99
|
BLD-Concrete | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PART |
|
|
|
JIM-- ###-####--REBAR & CONCRETE--GRID LINE A LINE FROM 12 TO 7 Made ok with sp. Msp. Approval
|
BLD-Conference | 9/23/1999 | 9/24/1999 | 9/24/1999 | A | PART |
|
|
|
JIM-- ###-#### CONF Jim/JW Bob H/Larson stair #172 A2.15 address light box penetration
|
INSP - Conference | 9/8/1999 | 9/10/1999 | 9/10/1999 | A | PART |
|
|
|
ONSITE CONFERANCE, JIM and moke otto walked jobsite and discusses lifesafety and exiting requirements and for the protection of the building occupants during construction ###-####
|
INSP - Foundation | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PART |
|
|
|
REBAR AND CONCRETE, GRID LINE 12, D-A, JIM ###-#### sp insp made ok
|
INSP - Concrete | 8/30/1999 | 8/31/1999 | 8/31/1999 | A | PART |
|
|
|
08/31/99 338 - REBAR POUR GRID LINE 12 D TO A JIM ###-#### SP INSP APP
|
INSP - Concrete | 8/20/1999 | 8/20/1999 | 8/20/1999 | P | PART |
Jim Storey
|
|
|
08/20/99 301 - JIM ###-####. GRID LINE 2 FROM D-C. covered by special in
|
INSP - Concrete | 8/9/1999 | 8/10/1999 | 8/10/1999 | P | PART |
|
|
|
08/10/99 338 - JIM ###-####. ENTERY WALLS OF NORTH ADDITION-SHEET F2 C ON S14. r-bar placed sp insp on site
|
INSP-Conference | 8/4/1999 | 8/4/1999 | 8/4/1999 | | PART |
|
|
|
Received letter of transmittal from arch on the project for an appeal on fire protection rating of exterior columns. Per supervisor an appeal shall be taken to the appeals board. This paperwork is delivered to M. Southard.
|
INSP - Concrete | 7/28/1999 | 7/29/1999 | 7/29/1999 | P | PART |
|
|
|
07/29/99 338 - MADE OK WITH SP INSP APPROVALS
|
INSP - Foundation | 7/20/1999 | 7/21/1999 | 7/21/1999 | P | PART |
|
|
|
07/21/99 338 - BEAMS AND FOUNDATION NORTH ADDITION JIM ###-#### made ok
|
INSP-Conference | 7/21/1999 | 7/21/1999 | 7/21/1999 | | PART |
|
|
|
With Bob Howard, recieved details of the proposed tempory stairs from the natatorium when the doors at the southwest corner are made unsafe to use. Wood is allowed in this type of construction as long as it is of 2" nom thickness. All other requirements for the stairs must comply with ubc chap. 10. will relay answer on the forms submitted by fax and return by fax to arch. see file.
|
INSP-Conference | 7/21/1999 | 7/21/1999 | 7/21/1999 | P | PART |
|
|
|
bob with the Arch, firm of Hosford-Larson-Rudeen with questions on the temp stairs at the pool area near the new elevator shaft. wood framing is acceptable as long as all codes for rise run, rails and landings comply. also confirmed that two (2) exits are required for the pool area if it is in use. Covered walkway protection may be required for the main exit from the pool area.
|
INSP - Foundation | 7/7/1999 | 7/8/1999 | 7/7/1999 | P | PART |
|
|
|
REBAR JIM ###-#### COLUMN PADS 11.3 12 LINE AND N SP INSP MADE OK 338
|
INSP - Concrete | 6/28/1999 | 6/29/1999 | 6/28/1999 | P | PART |
|
|
|
06/29/99 338 - grid line N and 8 and 9 made ok with sp insp approvals
|
INSP - Foundation | 6/18/1999 | 6/21/1999 | 6/21/1999 | A | PART |
|
|
|
06/21/99 338 - Grid Line L and 6 Jim ###-#### ok with sp insp
|
INSP - Concrete | 6/9/1999 | 6/10/1999 | 6/10/1999 | A | PART |
Wes Worcester
|
|
|
06/10/99 342 - JIM ###-#### no answer, still tying bar,spec insp??? FOUN
|
INSP - Foundation | 6/3/1999 | 6/4/1999 | 6/4/1999 | A | PART |
|
|
|
06/04/99 338 - madeok to pour with sp insp approvals
|
INSP - Foundation | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | PART |
|
|
|
06/03/99 338 - ###-####//REBAR FOOTING & WALL ON GRID 6 & L sp insp made
|
INSP - Foundation | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
|
|
|
06/02/99 338 - madeok conf with sp insp eng ctr and arch on concrete sch
|
INSP - Foundation | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
|
|
|
06/02/99 338 - conf on the concrete design placement and insp with arch,
|