BLD-Wall cover | 9/21/1999 | 10/9/1999 | 10/9/1999 | A | PART |
|
|
|
ok on the 4-hour walls
|
BLD-Wall cover | 9/30/1999 | 10/8/1999 | 10/8/1999 | A | PART |
|
|
|
4hr wall and attachments resubmittal on handicapped
|
BLD-Wall cover | 9/30/1999 | 10/6/1999 | 10/6/1999 | P | PART |
|
|
|
4-hr wall need submittal for 3 and 4 wall assys installing mech aelec and plmg
|
BLD-Wall cover | 9/30/1999 | 10/4/1999 | 10/4/1999 | A | PART |
|
|
|
4-hr wall framing and cover discussion of 4 hr wall at top plate at sliding assy
|
BLD-Wall cover | 9/21/1999 | 9/29/1999 | 9/28/1999 | A | PART |
|
|
|
Review with super penetrations/obstructions of time 4-hour wall
|
BLD-Wall cover | 9/21/1999 | 9/27/1999 | 9/27/1999 | A | PART |
|
|
|
Conf on 4hr walls & resubmittal to be issued
|
BLD-Wall cover | 9/21/1999 | 9/24/1999 | 9/24/1999 | A | PART |
|
|
|
Review of wall finish 4-hr walls
|
BLD-Wall cover | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PART |
|
|
|
dampers/ 4" to 8" = received sp. Insp. Reports for concrete
|
BLD-Wall cover | 9/21/1999 | 9/21/1999 | 9/21/1999 | | PART |
|
|
|
|
INSP - Concrete | 8/6/1999 | 8/6/1999 | 8/6/1999 | A | PART |
|
|
|
for r-bare p[lacement and concrete pour 2" slump at 80 degrees arrival to jobsite, plastisizer added to make 7" slump air at the schute is 7.5 and at the slab is 3.5 to 4 and 80 degrees.
|
INSP - Foundation | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
|
|
|
re bar insp and conf with ele cont and proset mfg on the applications of the sleeve for multiple ele wires in same. need more info from w/h or ul for the proposed change in install.
|
INSP - Foundation | 7/30/1999 | 8/2/1999 | 8/2/1999 | P | PART |
|
|
|
pt deck (rick fine engineer showing up Wed.) lloyd ###-#### (darrell will be back on mon) conf with darrell
|
INSP - Foundation | 7/26/1999 | 7/26/1999 | 7/26/1999 | P | PART |
|
|
|
07/26/99 338 - MADE OK TO POUR COLUMS
|
INSP - Foundation | 5/21/1999 | 5/21/1999 | 5/21/1999 | P | PART |
|
|
|
05/21/99 338 - made ok for the east most cornes
|
INSP-Supply line flush | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | PASS |
Rick Jackson
|
|
|
underground flush okay
|
INSP - Foundation | 5/17/1999 | 5/17/1999 | 5/17/1999 | P | PART |
|
|
|
###-#### DARRYL//FOUNDATION WALL GRIDLINE 1 & GRIDLINE A made ok to pour the remaining of the tall ext walls also ok to start forming of the interior footing in wait for the approved plans to arrive on site approved by mjp per conv with same.
|
INSP - Foundation | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | PART |
|
|
|
05/07/99 338 - madeok to pour with sp insp approvals
|