Permit Information
Permit NumberBLD98-03726
StatusExpired
Name URBAN RENEWAL AGENCY OF BOISE
Site Address 1249 GRAND AVE
Project NameRIVER PLAZA APT
Customer Number 
ePlanReviewNo
Description
RIVER PLAZA APARTMENTS FOUNDATION AND CLUB HOUSE SHELL ONLY * A FOUR-HOUR AREA SEPARATION WALL IS BEING CONSTRUCTED TO DIVIDE THIS BUILDING INTO TWO BUILDINGS. TO CONSTRUCT A NEW CONCRETE FOUNDATION AND CLUB HOUSE STRUCTURAL SLAB AS A THREE-HOUR OCCUPANCY SEPARATION PER UBC SECTION 311.2.2.1. THE CLUB HOUSE AREA IS APPROXIMATELY 4000 SQ.FT. THIS UNFINISHED AREA WILL INCLUDE THE LAUNDRY FACILITIES FOR THE APARTMENT COMPLEX. THIS PORTION OF THE BUILDING WILL BE FIRE SPRINKLERED THROUGHOUT TO ALLOW THIS OCCUPANCY TO BE LOCATED BELOW THE THREE-HOUR OCCUPANCY SEPARATION. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. THERE WILL NOT BE A CERTIFICATE OF OCCUPANCY ISSUED FOR THIS PORTION OF THE BUILDING. SEPARATE PERMITS AND AND CERTIFICATE OF OCCUPANCY WILL BE REQUIRED FOR THE COMPLETION OF THIS PORTION OF THE BUILDING. MJP DR98-0131 PC#817-98 REFER TO BLD98-3749 FOR ADDITIONAL COMMENTS. Post tension slab modified per structural plans approved on 5/19/99. mjp
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover9/21/199910/9/199910/9/1999APART
Details
ok on the 4-hour walls
BLD-Wall cover9/30/199910/8/199910/8/1999APART
Details
4hr wall and attachments resubmittal on handicapped
BLD-Wall cover9/30/199910/6/199910/6/1999PPART
Details
4-hr wall need submittal for 3 and 4 wall assys installing mech aelec and plmg
BLD-Wall cover9/30/199910/4/199910/4/1999APART
Details
4-hr wall framing and cover discussion of 4 hr wall at top plate at sliding assy
BLD-Wall cover9/21/19999/29/19999/28/1999APART
Details
Review with super penetrations/obstructions of time 4-hour wall
BLD-Wall cover9/21/19999/27/19999/27/1999APART
Details
Conf on 4hr walls & resubmittal to be issued
BLD-Wall cover9/21/19999/24/19999/24/1999APART
Details
Review of wall finish 4-hr walls
BLD-Wall cover9/21/19999/22/19999/22/1999APART
Details
dampers/ 4" to 8" = received sp. Insp. Reports for concrete
BLD-Wall cover9/21/19999/21/19999/21/1999 PART
Details
INSP - Concrete8/6/19998/6/19998/6/1999APART
Details
for r-bare p[lacement and concrete pour 2" slump at 80 degrees arrival to jobsite, plastisizer added to make 7" slump air at the schute is 7.5 and at the slab is 3.5 to 4 and 80 degrees.
INSP - Foundation8/5/19998/5/19998/5/1999PPART
Details
re bar insp and conf with ele cont and proset mfg on the applications of the sleeve for multiple ele wires in same. need more info from w/h or ul for the proposed change in install.
INSP - Foundation7/30/19998/2/19998/2/1999PPART
Details
pt deck (rick fine engineer showing up Wed.) lloyd ###-#### (darrell will be back on mon) conf with darrell
INSP - Foundation7/26/19997/26/19997/26/1999PPART
Details
07/26/99 338 - MADE OK TO POUR COLUMS
INSP - Foundation5/21/19995/21/19995/21/1999PPART
Details
05/21/99 338 - made ok for the east most cornes
INSP-Supply line flush5/19/19995/19/19995/19/1999PPASS
DetailsRick Jackson
underground flush okay
INSP - Foundation5/17/19995/17/19995/17/1999PPART
Details
###-#### DARRYL//FOUNDATION WALL GRIDLINE 1 & GRIDLINE A made ok to pour the remaining of the tall ext walls also ok to start forming of the interior footing in wait for the approved plans to arrive on site approved by mjp per conv with same.
INSP - Foundation5/7/19995/7/19995/7/1999PPART
Details
05/07/99 338 - madeok to pour with sp insp approvals