BLD-Conference | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Carl Dependahl
|
|
|
done deal 10/4/2002 2:56:43 PM
|
DOC - Permit Finaled | | | 10/4/2002 | | DONE |
|
|
|
|
BLD-Final | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | NR |
Carl Dependahl
|
|
|
here is the other part--it has a final but not doc final...unable to verify 10/3/2002 8:23:53 PM
|
BLD-Final | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | PASS |
|
|
|
Menyharth shell bldg. Signed perm col. Occ. Req. card ok for L/C
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
|
|
|
menyharth---###-#### --- Need P/Z signoff handrail corrections.
|
FIRE-Final Inspection | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PASS |
Rick Jackson
|
|
|
KEITH ###-#### Occupancy approved
|
FIRE-Final Inspection | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | NR |
Rick Jackson
|
|
|
Keith ###-#### Not ready
|
FIRE-Final Inspection | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | FAIL |
Rick Jackson
|
|
|
KEITH-- ###-#### FN FIRE Elevator Recall system needs test; elevator lobby door not installed
|
INSP - Final | 7/16/1999 | 7/19/1999 | 7/19/1999 | P | FAIL |
|
|
|
07/19/99 338 - need other agencies signoffs c/n issued address, flame sp
|
INSP-Final Inspection | 7/16/1999 | 7/19/1999 | 7/19/1999 | A | FAIL |
Rick Jackson
|
|
|
KEITH ###-#### LIFE SAFETY mechanical resubmittal needed; address; stair completed
|
INSP - Framing/Rough-in | 6/18/1999 | 6/18/1999 | 6/18/1999 | P | |
Jim Storey
|
|
|
framing
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/9/1999 | P | PART |
Jim Storey
|
|
|
06/09/99 301 - truss repair ok
|
INSP - Framing/Rough-in | 6/7/1999 | 6/8/1999 | 6/8/1999 | A | NR |
Jim Storey
|
|
|
06/08/99 301 - roof framing Keith ###-####
|
INSP - Framing/Rough-in | 6/8/1999 | 6/8/1999 | 6/8/1999 | P | CANC |
Jim Storey
|
|
|
06/08/99 301 - Keith ###-####
|
INSP-Conference | 6/7/1999 | 6/7/1999 | 6/7/1999 | P | PASS |
|
|
|
|
INSP - Foundation | 4/9/1999 | 4/9/1999 | 4/9/1999 | P | PART |
|
|
|
made ok with sp insp approvals r-bar is placed
|
INSP - Foundation | 4/7/1999 | 4/7/1999 | 4/7/1999 | | PART |
|
|
|
04/07/99 338 - made ok with sp insp for the s.w. corner to install power
|
INSP - Foundation | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | PART |
|
|
|
04/05/99 338 - made ok for pour with sp insp approval
|
INSP - Foundation | 4/1/1999 | 4/2/1999 | 4/2/1999 | P | CANC |
|
|
|
04/02/99 338 - cancelled by the conc ctr. not per approved plans
|
INSP - Foundation | 3/29/1999 | 3/30/1999 | 3/30/1999 | P | CANC |
|
|
|
03/30/99 338 - ###-#### KEITH//FOOTING//LATE PM cancelled by the cont pe
|
INSP - Framing/Rough-in | 6/17/1999 | 6/18/1999 | 6/11/1989 | P | FAIL |
Jim Storey
|
|
|
06/18/99 301 - trans to ppaine
|