FIRE-Final Inspection | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | PASS |
Joe Tawney
|
|
|
Buck ###-#### Reinsp. Ok for pemanent occupancy
|
BLD-Final | 9/20/1999 | 9/21/1999 | 9/21/1999 | A | CANC |
Jim Storey
|
|
|
buck ###-#### fn occ insp Done by 408
|
BLD-Final | 9/21/1999 | 9/21/1999 | 9/21/1999 | P | PART |
Tom Arcoraci
|
|
|
final occ buck ###-#### ok for temp occ
|
FIRE-Final Inspection | 9/20/1999 | 9/20/1999 | 9/20/1999 | P | PART |
Joe Tawney
|
|
|
buck-- ###-#### fn fire ok for temp. occ. C/N issued
|
FIRE-Final Inspection | 9/13/1999 | 9/15/1999 | 9/15/1999 | A | FAIL |
Joe Tawney
|
|
|
FINAL CONSTRUCTION NOT COMPLETE, TESTED SPRINKLER SYSTEM-C/N ISSUED, OK ON ABOVE GROUND HYDRO TEST
|
INSP-Final Inspection | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | CANC |
Joe Tawney
|
|
|
vicki ###-####
|
INSP - Framing/Rough-in | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PART |
Jim Sly
|
|
|
CEILING grid appears ok
|
INSP-Supply line flush | 9/1/1999 | 9/1/1999 | 9/1/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 6/21/1999 | 6/21/1999 | 6/21/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN 2 CORR ITEMS
|
INSP - Framing/Rough-in | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | PART |
Jim Sly
|
|
|
06/03/99 316 - OK to cover interior of exterior walls...and (1) side of
|
INSP - Framing/Rough-in | 6/3/1999 | 6/3/1999 | 6/3/1999 | | PART |
Jim Sly
|
|
|
06/03/99 316 - OK to cover interior of exterior walls....1side of some w
|
INSP - Framing/Rough-in | 5/6/1999 | 5/7/1999 | 5/7/1999 | A | PART |
Jim Sly
|
|
|
05/07/99 316 - Verified draftstops (columns) and Ext. Shear wall attachm
|
INSP - Framing/Rough-in | 4/20/1999 | 4/21/1999 | 4/21/1999 | A | PART |
Jim Sly
|
|
|
04/21/99 316 - Met with Buck...conf. shear wall, draft stops, interior w
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1999 | 3/19/1999 | 3/19/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON BEDDING OF SUPPLY LINE
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1999 | 3/19/1999 | 3/19/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON BEDDING OF SUPPLY LINE
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1999 | 3/19/1999 | 3/19/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON BEDDING OF SUPPLY LINE
|
INSP-Sprinkler Rough-in/Hydro | 3/18/1999 | 3/18/1999 | 3/18/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND RI WILL NEED TO SEE BACKFILL
|
INSP - Foundation | 3/8/1999 | 3/9/1999 | 3/9/1999 | P | PART |
Tom Arcoraci
|
|
|
03/09/99 408 - BUCK ###-#### EARLY PM
|
INSP - Foundation | 3/5/1999 | 3/5/1999 | 3/5/1999 | | PART |
Tom Arcoraci
|
|
|
03/05/99 408 - ###-#### Buck
|
INSP - Foundation | 3/2/1999 | 3/3/1999 | 3/3/1999 | A | PART |
Tom Arcoraci
|
|
|
03/03/99 408 - ###-#### Buck PART OK ON FOOTING
|
INSP - Concrete | 3/1/1999 | 3/2/1999 | 3/2/1999 | P | PART |
Jim Sly
|
|
|
03/02/99 316 - Footing......Pending special insp approval.
|
INSP - Foundation | 2/25/1999 | 2/26/1999 | 2/26/1999 | A | PART |
Tom Arcoraci
|
|
|
02/26/99 408 - special insp on site
|