INSP - Final | 4/1/1999 | 4/1/1999 | 4/1/1999 | P | PASS |
Russ Owen
|
|
|
04/01/99 407 - window with board,glass company will chnge out,next to ba
|
INSP - Final | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | FAIL |
Russ Owen
|
|
|
03/31/99 407 - left corrections.
|
INSP - Final | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | FAIL |
Russ Owen
|
|
|
03/30/99 407 - LOCKED OUT.
|
INSP - Energy code compliance | 1/27/1999 | 1/28/1999 | 1/28/1999 | A | PASS |
Wes Worcester
|
|
|
01/27/99 342 - BRIAN ###-####
|
INSP - Framing/Rough-in | 1/26/1999 | 1/26/1999 | 1/26/1999 | P | PART |
Wes Worcester
|
|
|
01/26/99 342 - brian- ###-#### fr insp
|
INSP - Framing/Rough-in | 1/21/1999 | 1/22/1999 | 1/22/1999 | A | PASS |
Wes Worcester
|
|
|
01/22/99 342 - briggs signed off
|
INSP - Framing/Rough-in | 1/13/1999 | 1/13/1999 | 1/13/1999 | P | FAIL |
Wes Worcester
|
|
|
01/13/99 342 - shear wall/###-####
|
INSP - Framing/Rough-in | 1/12/1999 | 1/12/1999 | 1/12/1999 | P | FAIL |
Wes Worcester
|
|
|
01/12/99 342 - BRIAN- ###-#### SHEAR missing hold downs, need eng'd fix INCORRECT ENGINEERING, FRAMING ON EARLY START.
|
INSP - Foundation | 12/10/1998 | 12/11/1998 | 12/11/1998 | A | FAIL |
Wes Worcester
|
|
|
changed by 342 as it is an early start, at site 342 was told it was not an early start and plan on site did not address
|