Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03910
StatusFinaled
Name JEFF IVERSON
Site Address 590 S BROADWAY AVE
Project NameRAM PLAZA BLDG. #300
Customer Number 
ePlanReviewNo
Description
THE RAM PLAZA, BUILDING #300 (SHELL ONLY PERMIT) * TO CONSTRUCT A NEW 8,190 SQ. FT., ONE STORY, RETAIL SHELL BUILDING AND RELATED SITE IMPROVEMENTS. CONSTRUCTED OF A CONCRETE SLAB FLOOR, STRUCTURAL MASONRY AND METAL STUD EXTERIOR WALLS, STEEL INTERIOR COLUMN, STEEL PREMANUFACTURED ROOF JOISTS AND GIRDERS AND METAL ROOF DECK WITH SINGLE-PLY ROOFING SYSTEM AND SOME WOOD FRAME OVERBUILDS AT THE ENTRY AREAS. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. THIS BUILDING IS ONE OF THREE, ALL THREE HAVE BEEN REVIEWED AS ONE FOR ALLOWABLE AREA AND EXTERIOR WALL AND OPENING PROTECTION REQUIREMENTS. THIS IS A SHELL PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH EACH SEPARATE TENANT SPACE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH98-0113/CVA98-0009/PC#880-98/JCM PERMIT SUBMITTED ON ONE SET OF PLANS ALONG WITH BUILDINGS #100, AND #200
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/10/20001/10/20001/10/2000PPART
DetailsRuss Owen
Pending engineers approval of special inspection report.
FIRE-Final Inspection12/9/199912/10/199912/10/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/09/1999 at 09:45:53. Contact: ###-####. Occupancy approved.
FIRE-Sprinkler Rough-in12/2/199912/2/199912/2/1999PFAIL
DetailsRick Jackson
unit 300 alan ###-#### hydro stat test Hydro fail; sway bracing; ball drip for FDC.
FIRE-Conference11/3/199911/3/199911/3/1999APART
DetailsRick Jackson
Addressing problems; sprinkler issues.
BLD-Framing/Rough-in10/29/199911/1/199911/1/1999APASS
DetailsRuss Owen
MIKE ###-####
BLD-Framing/Rough-in10/26/199910/27/199910/27/1999AFAIL
DetailsTom Arcoraci
###-#### No super. On site
BLD-Framing/Rough-in10/15/199910/15/199910/15/1999PFAIL
DetailsRuss Owen
mike-- ###-#### fr insp left correction on job trailer window
INSP - Framing/Rough-in9/14/19999/15/19999/15/1999APASS
DetailsRuss Owen
BLDG 300 OK TO COVER UPPER PARAPET
INSP - Framing/Rough-in9/13/19999/14/19999/14/1999AFAIL
DetailsRuss Owen
SAME CORRECTIONS, MORE SCREWS ETC.
INSP - Framing/Rough-in9/13/19999/13/19999/13/1999PFAIL
DetailsRuss Owen
NEEDS MORE SCREWS AND FASTENERS ON EXT UPPER PARAPETS. ALSO TALKED W STEED ABOUT JOB CONSTRUCTION TYPE AND TOLD THEM TO CONTACT ARCHITECT ABOUT REVISIONS
INSP - Framing/Rough-in9/8/19999/8/19999/8/1999PPART
DetailsRuss Owen
MIKE ###-####; 9/8 Talked w architect about requirements for Type IIN construction, roof over framing on plan doesn't comply, as told at plan check. jrb
INSP - Framing/Rough-in9/7/19999/7/19999/7/1999 FAIL
DetailsRuss Owen
9-7 Need change from architect for ext parapet walls. JRB;
INSP - Framing/Rough-in8/23/19998/24/19998/24/1999APART
DetailsRuss Owen
08/24/99 407 - ok per special inspection.
INSP - Concrete8/3/19998/3/19998/3/1999PPART
DetailsRuss Owen
08/03/99 407 - subject to special inspection.
INSP - Framing/Rough-in7/27/19997/27/19997/27/1999PPART
DetailsRuss Owen
07/27/99 407 - subjects to a special inspection.
INSP - Foundation7/21/19997/22/19997/22/1999APART
DetailsRuss Owen
07/22/99 407 - subject to special inspection.
INSP - Concrete7/8/19997/8/19997/8/1999PPASS
DetailsRuss Owen
07/08/99 407 - special inspector will approve.
INSP - Concrete7/6/19997/7/19997/7/1999APART
DetailsRuss Owen
07/07/99 407 - subject to special inspector.
INSP - Concrete7/1/19997/2/19997/2/1999APART
DetailsRuss Owen
07/02/99 407 - ok mti on site,has approvred pouring grout.
INSP - Framing/Rough-in6/30/19996/30/19996/30/1999PPART
DetailsRuss Owen
06/30/99 407 - special inspection letter to folow.
INSP - Foundation6/25/19996/28/19996/28/1999APART
DetailsRuss Owen
06/28/99 407 - masonary rebar grout at 1pm Mike ###-####,subject to spec
INSP - Concrete6/23/19996/24/19996/25/1999PPART
DetailsRuss Owen
06/24/99 407 - ok special inspector ,has approved,meet with at site.
INSP - Concrete6/16/19996/16/19996/16/1999PPART
DetailsRuss Owen
06/16/99 407 - subject to special inspection.
INSP - Concrete6/10/19996/11/19996/11/1999APART
DetailsRuss Owen
06/11/99 407 - special inspection.
INSP - Foundation6/10/19996/10/19996/10/1999PPART
DetailsRuss Owen
06/10/99 407 - Mike ###-####
INSP - Foundation6/3/19996/4/19996/4/1999PPART
DetailsRuss Owen
06/04/99 407 - ok per special inspection.
INSP - Foundation5/27/19995/28/19995/28/1999APART
Details
05/28/99 338 - MADE OK TO POUR FOUND WITH SP INSP APPROVAL
INSP - Foundation5/24/19995/24/19995/24/1999PPART
DetailsRuss Owen
05/24/99 407 - pour subjects to special inspection.
INSP - Foundation5/20/19995/21/19995/21/1999PPART
DetailsRuss Owen
05/21/99 407 - ok per special inspector.