Permanent Occupancy | | 3/7/2000 | 3/7/2000 | | DONE |
|
|
|
|
BLD-Final | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | PART |
|
|
|
SIGNED THE OCC REQ CARD TEMP COL bill --###-#### fn occ
|
BLD-Conference | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | FAIL |
|
|
|
met with bill and tony on the acessability requirements for door hardware and restrooms low level xit sign req,s
|
BLD-Conference | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 11:05:54. Contact: ###-####.
|
BLD-Final | 12/28/1999 | 12/29/1999 | 12/29/1999 | A | FAIL |
|
|
|
C/N ISSUED DOOR HARDWARE ANDEXIT SIGNS NOT INSTALLEDBILL ###-####
|
FIRE-Final Inspection | 12/27/1999 | 12/28/1999 | 12/28/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 16:14:15. Contact: ###-####. Occ. approved.
|
FIRE-Final Inspection | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 08:55:37. Contact: ###-####. C/N issued- too many items to list.
|
FIRE-Sprinkler Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
Rick Jackson
|
|
|
###-#### Sidewall in corridor.
|
FIRE-Supply Line Flush | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PASS |
Rick Jackson
|
|
|
###-#### Flush ok.
|
FIRE-Alarm Testing | 9/27/1999 | 9/30/1999 | 9/30/1999 | | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 15:18:59. Contact: ###-####. Alarms not complete; reviewed plans and installation
|
BLD-Conference | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | PART |
|
|
|
Conf. On drywall behind tubs
|
BLD-Conference | 9/22/1999 | 9/22/1999 | 9/22/1999 | A | PART |
|
|
|
with bill needs to have drywall behind the tubs, will look at solutions
|
INSP - Framing/Rough-in | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | FAIL |
|
|
|
08/30/99 338 - ele box protectionn required
|
INSP - Wall cover | 8/20/1999 | 8/20/1999 | 8/20/1999 | | FAIL |
|
|
|
CN issued for walk-in cooler location. Rated wall and door jamb must be maintained.
|
INSP - Framing/Rough-in | 8/3/1999 | 8/3/1999 | 8/3/1999 | P | PART |
|
|
|
08/03/99 338 - made ok to cover upper ceilings and walls w/o plmg.
|
INSP - Wall cover | 7/14/1999 | 7/14/1999 | 7/14/1999 | | FAIL |
|
|
|
/ / 338 - WITH SUPERVISOR NOT READY FOR INSP OTHER AGENCIES NOT APPROV
|
INSP - Wall cover | 7/14/1999 | 7/14/1999 | 7/14/1999 | | FAIL |
|
|
|
/ / 338 - WITH SUPERVISOR NOT READY FOR INSP OTHER AGENCIES NOT APPROV
|
INSP - Framing/Rough-in | 7/12/1999 | 7/13/1999 | 7/13/1999 | A | FAIL |
|
|
|
07/13/99 338 - not ready for any inspections super not on the jobsite wi
|
INSP - Framing/Rough-in | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
|
|
|
06/02/99 338 - conf with owner,arch drywaller and the contr on the rated
|
INSP - Foundation | 5/27/1999 | 5/27/1999 | 6/1/1999 | P | CANC |
Jim Storey
|
|
|
05/27/99 301 - p paine
|
INSP - Foundation | 5/25/1999 | 5/25/1999 | 5/25/1999 | P | PART |
|
|
|
05/25/99 338 - ok for form completed areas
|
INSP - Foundation | 5/19/1999 | 5/21/1999 | 5/21/1999 | P | PART |
|
|
|
05/21/99 338 - madeok to pour the ele, and to grade walls
|
INSP - Foundation | 5/19/1999 | 5/20/1999 | 5/20/1999 | P | PART |
|
|
|
05/20/99 338 - ok to pour walls at the ele/stairwell
|
INSP - Foundation | 5/12/1999 | 5/13/1999 | 5/13/1999 | P | PART |
|
|
|
05/13/99 338 - ok to complete the footing pours
|
INSP - Foundation | 5/11/1999 | 5/12/1999 | 5/12/1999 | P | PART |
|
|
|
05/12/99 338 - madeok to pour the footings of north addition only
|
INSP - Foundation | 5/10/1999 | 5/11/1999 | 5/11/1999 | A | PART |
|
|
|
05/11/99 338 - madeok for the elevator pit walls only
|
INSP - Foundation | 5/11/1999 | 5/11/1999 | 5/11/1999 | P | |
|
|
|
pooring at 3:30 Randy ###-####
|
INSP - Framing/Rough-in | 5/6/1999 | 5/7/1999 | 5/7/1999 | A | FAIL |
|
|
|
05/07/99 338 - need more conf been working on the project w/o permits
|