BLD-Final | 3/6/2000 | 3/8/2000 | 3/8/2000 | P | PASS |
|
|
|
signed the occ req card perm
|
Permanent Occupancy | | 3/8/2000 | 3/8/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/3/2000 | 3/6/2000 | 3/6/2000 | P | PASS |
Rick Jackson
|
|
|
Jim ###-####
|
BLD-Other | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | PART |
|
|
|
BOND BEAM JIM ###-#### (11/26/99 eng. Shear SFNDS).
|
BLD-Footing | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | PART |
|
|
|
jim--- ###-#### ft insp Ok w/sp insp. Approval
|
BLD-Footing | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PART |
|
|
|
jim-- ###-#### ft insp R-bar placed/ sp insp. Ok
|
BLD-Footing | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PART |
|
|
|
JIM-- ###-#### FT INSP East to West spread footing for shear wall
|
BLD-Footing | 10/18/1999 | 10/19/1999 | 10/19/1999 | A | PART |
|
|
|
JIM ###-#### Made ok w/sp. Insp approvals
|
BLD-Concrete | 10/1/1999 | 10/4/1999 | 10/4/1999 | P | PART |
|
|
|
AROUND 1:30 IF POSSIBLE JIM ###-#### made ok w/ sp insp approval drill dowels into exist footing
|