INSP - Final | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | PASS |
Carl Dependahl
|
|
|
09/03/99 340 - JOSH ###-####
|
INSP-Final Inspection | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | PASS |
Rick Jackson
|
|
|
tested AHU shutdown - occ approved
|
Permanent Occupancy | | 9/3/1999 | 9/3/1999 | | DONE |
|
|
|
|
INSP - Final | 9/1/1999 | 9/2/1999 | 9/2/1999 | P | FAIL |
Carl Dependahl
|
|
|
JOSH ###-####; CALLED, KEEP C/N. NEED FIRE
|
INSP-Final Inspection | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - REINSP FAIL AHU DUCT DETECTORS
|
INSP - Final | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/27/99 340 - josh ###-####; c/n, fire code, etc; ok for t/o
|
INSP-Final Inspection | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - REINSP FAIL S/F DAMPER DETECTION
|
INSP - Final | 8/26/1999 | 8/26/1999 | 8/26/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/26/99 340 - JOSH ###-####.; need fire, etc
|
INSP-Final Inspection | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - FINAL FAIL
|
INSP-Final Inspection | 8/24/1999 | 8/25/1999 | 8/25/1999 | P | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - FINAL FAIL
|
INSP - Framing/Rough-in | 8/4/1999 | 8/5/1999 | 8/5/1999 | A | PART |
Carl Dependahl
|
|
|
08/05/99 340 - part grid ok; verbal to seal draft stops prior to tile, r
|
INSP - Framing/ Rough-in | 6/29/1999 | 6/29/1999 | 6/29/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - DRAFT STOPS INSTALLED, SEAL AS NEEDED
|
INSP - Framing/ Rough-in | 6/22/1999 | 6/22/1999 | 6/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - TRUSS FIX MADE OK
|
INSP - Framing/Rough-in | 6/14/1999 | 6/14/1999 | 6/14/1999 | | PART |
Carl Dependahl
|
|
|
06/14/99 340 - ###-#### JOSH//FRAMING trusses ok, ok to cover corr. c/n
|
INSP - Framing/Rough-in | 5/25/1999 | 5/26/1999 | 5/26/1999 | A | FAIL |
Carl Dependahl
|
|
|
05/26/99 340 - ###-#### JOSH//FRAMING, c/n draft stops,trusses, shear, e
|
INSP - Framing/Rough-in | 5/25/1999 | 5/25/1999 | 5/25/1999 | P | PART |
Carl Dependahl
|
|
|
05/25/99 340 - Josh ###-####, COMPLETE 1HR WALL, ADD FASTENERS
|
INSP - Framing/Rough-in | 5/20/1999 | 5/21/1999 | 5/21/1999 | A | PART |
Carl Dependahl
|
|
|
###-#### josh//framing; soffit at east 1hr wall ok, need nail off gyp 7" oc at wall both sides. ok to continue.
|
INSP - Framing/Rough-in | 5/13/1999 | 5/13/1999 | 5/13/1999 | P | PART |
Carl Dependahl
|
|
|
05/13/99 340 - initial insp for shear, complete nailing; fasten all memb
|
INSP - Framing/Rough-in | 5/10/1999 | 5/10/1999 | 5/10/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ BLDR; PENDING STEEL SPEC. INSP
|
INSP - Framing/Rough-in | 4/21/1999 | 4/22/1999 | 4/23/1999 | A | NR |
Carl Dependahl
|
|
|
04/22/99 340 - josh ###-####; structural framing; mst straps in at trimm
|
INSP - Foundation | 4/19/1999 | 4/19/1999 | 4/19/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - SLAB, SPEC INSP ONSITE; KEEP C/N FOR REPORTS, ETC
|
INSP - Foundation | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | PART |
Carl Dependahl
|
|
|
03/30/99 340 - ###-#### JOSH//FOOTING mti onsite, keep cn pending reports
|
INSP - Foundation | 3/26/1999 | 3/26/1999 | 3/26/1999 | | PART |
Carl Dependahl
|
|
|
03/26/99 340 - josh ###-#### footing/foundation per cont, has mti onsite; pending reports...keep c/n
|
INSP - Foundation | 3/26/1999 | 3/26/1999 | 3/26/1999 | P | PART |
Carl Dependahl
|
|
|
mti onsite, keep c/n. pend spec insp report
|
INSP - Foundation | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | PART |
Carl Dependahl
|
|
|
03/25/99 340 - ###-#### JOSH//FOOTING mti onsite, keep c/n of 3-22
|
INSP - Foundation | 3/24/1999 | 3/24/1999 | 3/24/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FTGS, HAS SPEC INSP...KEEP CN OF 3-23-99; PENDING REPORT& EN
|
INSP - Foundation | 3/23/1999 | 3/24/1999 | 3/24/1999 | A | FAIL |
Wes Worcester
|
|
|
03/24/99 342 - josh ###-#### will have special inspection
|