BLD-Final | 10/26/1999 | 10/26/1999 | 10/26/1999 | P | PASS |
Alan Hauser
|
|
|
Karen ###-#### C/C #18228
|
BLD-Final | 10/21/1999 | 10/22/1999 | 10/22/1999 | P | FAIL |
Tom Arcoraci
|
|
|
KAREN ###-#### REINSPECT Last C/N not complete 42 re/insp.
|
BLD-Final | 10/18/1999 | 10/19/1999 | 10/19/1999 | P | FAIL |
Jim Sly
|
|
|
BRAD--- ###-#### FN OCC--COM LOCK BOX ON BACK TO GAR--#H 3 TIMES TO H THEN 2 COUNTER TO A ONCE CLOCKWISE TO N C/N need elect. Final and misc. corr.
|
INSP - Energy code compliance | 6/14/1999 | 6/15/1999 | 6/15/1999 | P | PASS |
Tom Arcoraci
|
|
|
06/15/99 408 - ###-#### DAVE//INSULATION
|
INSP - Framing/Rough-in | 6/14/1999 | 6/14/1999 | 6/14/1999 | P | PASS |
Tom Arcoraci
|
|
|
06/14/99 408 - Dave ###-####
|
INSP - Framing/Rough-in | 6/11/1999 | 6/11/1999 | 6/11/1999 | P | FAIL |
Jim Sly
|
|
|
06/11/99 316 - Not ready...Complete prev corr......
|
INSP - Framing/Rough-in | 6/10/1999 | 6/10/1999 | 6/10/1999 | P | FAIL |
Jim Sly
|
|
|
06/10/99 316 - C/N.....Too many corr to list.....
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/8/1999 | A | FAIL |
Jim Sly
|
|
|
06/09/99 316 - C/N...Need Mech, air infiltr......
|
INSP - Framing/Rough-in | 6/3/1999 | 6/4/1999 | 6/4/1999 | P | PART |
Jim Sly
|
|
|
06/04/99 316 - Shear wall OK
|
INSP - Framing/Rough-in | 6/1/1999 | 6/2/1999 | 6/2/1999 | A | FAIL |
Jim Sly
|
|
|
06/02/99 316 - Need plans for shear.
|
INSP - Framing/Rough-in | 5/10/1999 | 5/10/1999 | 5/10/1999 | P | FAIL |
Jim Sly
|
|
|
05/10/99 316 - C/N...Need appr plans
|
INSP - Foundation | 4/14/1999 | 4/14/1999 | 4/14/1999 | P | PASS |
Jim Sly
|
|
|
04/14/99 316 - Foot, wall and rebar for (2) story condition....OK
|
INSP - Foundation | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | PART |
Jim Sly
|
|
|
04/13/99 316 - Foot and 2bars OK...Setbks appear OK
|