BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Russ Owen
|
|
|
call Pat first; Phone #: ###-####shell core ok perm oc. 7/29/2002 2:08:35 PM
|
FIRE-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. structural inspector to verify the thumbturn has been removed from the rear door 7/25/2002 10:38:42 AM
|
Code Occupancy Approval | | | 7/25/2002 | | CLOS |
|
|
|
OK SO SIGNED FINAL.
|
BLD-Conference | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | PART |
Russ Owen
|
|
|
###-#### Pat. went over final requirements 6/26/2002 4:28:33 PM
|
FIRE-Final Inspection | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | FAIL |
Troy Cobbley
|
|
|
remove thumbturns on the exterior doors, provide approved hardware for the second floor offices 6/26/2002 1:30:55 PM
|
BLD-Conference | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PART |
Russ Owen
|
|
|
PAT ###-#### OR ###-#### FOR CONF . new details for glass railings from engineer ok. 5/6/2002 12:07:13 PM
|
BLD-Conference | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PART |
Russ Owen
|
|
|
###-####went over handrails. 3/21/2002 4:33:32 PM
|
FIRE-Final Inspection | 3/19/2002 | 3/20/2002 | 3/20/2002 | P | NR |
Troy Cobbley
|
|
|
Inspection was really a conference. Went over fire extinguisher locations, permanent address location, change out of door hardware to approved type 3/20/2002 4:28:24 PM
|
BLD-Other | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/19/2002 3:40:00 PM
|
BLD-Conference | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Russ Owen
|
|
|
###-#### or ###-#### Pat call to meet
|
BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | CANC |
Russ Owen
|
|
|
JOHN ###-#### LOCK BOX # 193 This is not ready needs other required signatures. 2/28/2002 10:23:24 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Russ Owen
|
|
|
PAT ###-#### rear window at stair not resolved will need temp glass,framing c/n complete ok to insulate. 1/1/2002 2:46:51 PM
|
BLD-Framing/Rough-in | 4/24/2001 | 4/30/2001 | 4/30/2001 | A | PART |
Russ Owen
|
|
|
reinspection pat ###-#### still has c/n will recall. 11/30/2001 4:21:19 PM
|
BLD-Conference | 3/2/2001 | 3/2/2001 | 3/2/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 07:25:40. Contact: ###-####.c/n posted. 3/2/2001 11:33:49 AM
|
BLD-Framing/Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 17:13:45. Contact: ###-####.c/n posted. 3/2/2001 11:33:41 AM
|
BLD-Framing/Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | FAIL |
Russ Owen
|
|
|
###-####partial will recall. 3/1/2001 5:33:50 PM
|
BLD-Conference | 2/22/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 2/22/2001 8:17:50 AM Conf with elect contr regarding exit and emerg lights. Approved plans not on site.
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/13/2001 11:12:18 AM went over requirements with bld and mec contractor.
|
BLD-Framing/Rough-in | 11/8/2000 | 11/8/2000 | 11/8/2000 | P | PART |
Dave Hannah
|
|
|
SHEAR PANEL--PAT-- ###-####
|
BLD-Framing/Rough-in | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | NR |
Carl Dependahl
|
|
|
shear panel\\###-####
|
BLD-Framing/Rough-in | 11/3/2000 | 11/3/2000 | 11/3/2000 | P | FAIL |
Carl Dependahl
|
|
|
shear panel-- pat- ###-#### or ###-####
|
BLD-Conference | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | PASS |
Tom Arcoraci
|
|
|
Don ###-####
|
BLD-Foundation | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 13:07:41. Contact: ###-####. Wall rebar appears ok.. Still need "soils" test. Contractor stated it's been performed.
|
BLD-Conference | 1/7/2000 | 1/7/2000 | 1/7/2000 | P | PASS |
Carl Dependahl
|
|
|
Met w/builder onsite, need soils test report. Pour at own risk.
|
BLD-Footing | 12/16/1999 | 12/17/1999 | 12/17/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 17:32:53. Contact: ###-####. Need submit soils test; set-backs ok.
|
BLD-Footing | 12/16/1999 | 12/17/1999 | 12/16/1999 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 13:37:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/16/1999 at 17:31:36.
|
BLD-Footing | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:45:41. Contact: ###-####. Rained out; recall.
|
BLD-Footing | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:15:39. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/15/1999 at 10:43:56.
|