BLD-Final | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
Carl Dependahl
|
|
|
8888018 9/7/2000 11:48:08 AM card to contractor 9/7/2000 4:06:47 PM
|
Permanent Occupancy | | 9/7/2000 | 9/7/2000 | | DONE |
|
|
|
|
BLD-Final | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 11:11:33. Contact: .c/n, firestops, ADA at restrms (boots) S label at corr. doors, etc. ok for t/o 7/31/2000 12:02:51 PM
|
FIRE-Final Inspection | 7/27/2000 | 7/27/2000 | 7/27/2000 | P | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 10:48:57. Contact: . Reinsp. ok for perm. occ. 7/28/00 10:04:40 AM
|
FIRE-Final Inspection | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | FAIL |
Joe Tawney
|
|
|
Jim ###-#### Scheduled for 7/27/00 pm 7/27/00 10:41:55 AM
|
FIRE-Final Inspection | 7/20/2000 | 7/21/2000 | 7/21/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 11:57:32. Contact: . Reinsp. fail not ready to be rescheduled 7/24/00 1:04:57 PM
|
BLD-Conference | 7/3/2000 | 7/3/2000 | 6/30/2000 | A | PASS |
Carl Dependahl
|
|
|
B.K. Gym: conf w/ bldr re: final req's
|
FIRE-Final Inspection | 6/12/2000 | 6/16/2000 | 6/16/2000 | A | FAIL |
Joe Tawney
|
|
|
kate ###-#### Final fail C/N issued. 6/16/00 2:14:34 PM
|
FIRE-Final Inspection | 5/12/2000 | 5/17/2000 | 5/17/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 12:46:15. Contact: . Final fail alarm submittal not on site corrections required. 5/17/00 2:05:24 PM
|
FIRE-Sprinkler Rough-in | 3/16/2000 | 3/16/2000 | 3/16/2000 | P | PART |
Joe Tawney
|
|
|
###-#### 2hr 200lb test Ok on underground and above ground hydro tests. 3/17/00 10:36:28 AM
|
BLD-Framing/Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PART |
Carl Dependahl
|
|
|
jim ###-#### ceiling grid insp Grid @ stairs & lobby areas ok; firestop rated walls as noted at corridors & concession. 3/3/00 8:50:33 AM
|
BLD-Conference | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | PASS |
Carl Dependahl
|
|
|
W/supt. re: corrections.
|
BLD-Framing/Rough-in | 2/17/2000 | 2/17/2000 | 2/17/2000 | P | PART |
Carl Dependahl
|
|
|
jim ###-#### fr Grid. 2/18/00 9:40:43 AM
|
BLD-Framing/Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Carl Dependahl
|
|
|
CEILING GRID\\###-####
|
BLD-Framing/Rough-in | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | PART |
Russ Owen
|
|
|
###-#### Partial inspection of ceiling framing. 2/7/00 1:34:54 PM
|
BLD-Framing/Rough-in | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PART |
Carl Dependahl
|
|
|
JIM ###-#### SHEETROCK & FR; stairs and portion 1st fl corr at south side
|
BLD-Framing/Rough-in | 2/1/2000 | 2/1/2000 | 2/1/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### 1 hr lid at stairs 1st layer ok 2/3/00 7:28:01 AM
|
BLD-Framing/Rough-in | 1/27/2000 | 1/28/2000 | 1/28/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 13:00:12. Contact: . ceiling ok at south stairway only thing insp. 1/28/00 11:24:16 AM
|
BLD-Framing/Rough-in | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | PART |
Tom Arcoraci
|
|
|
658jim ###-#### stairway l d ok for cover 1/31/00 8:32:25 AM
|
BLD-Framing/Rough-in | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Hard lids @ rooms off 1st floor corridor- keep C/N, need firestops @ "Gym side". 1/25/00 12:13:46 PM
|
BLD-Conference | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | PASS |
Carl Dependahl
|
|
|
BKH's; Rec'd submittal for ceiling (rated) extension @ corridor. ok.
|
BLD-Framing/Rough-in | 1/14/2000 | 1/18/2000 | 1/18/2000 | A | FAIL |
Carl Dependahl
|
|
|
658--9163 C/N: need 1hr. lid detail @ south exit & corridor. 1/18/00 3:50:13 PM
|
BLD-Conference | 1/12/2000 | 1/13/2000 | 1/13/2000 | A | PASS |
Carl Dependahl
|
|
|
Jim ###-####. Met w/supt. Onsite re HVAC @ corridor & lobby Alan Hauser present.
|
BLD-Framing/Rough-in | 1/7/2000 | 1/10/2000 | 1/10/2000 | P | PART |
Carl Dependahl
|
|
|
Sean ###-####. 1st layer lid @ lobby ok; install "shaft" at vestible.
|
BLD-Conference | 1/7/2000 | 1/7/2000 | 1/7/2000 | P | PASS |
Carl Dependahl
|
|
|
w/Mike Otto & project mngr. keep C/N re: dampers @ corridor.
|
BLD-Framing/Rough-in | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####. Need resub. for HVAC @ corridor; ceilings @ foyer & shower rms. ok to cover.
|
BLD-Framing/Rough-in | 1/4/2000 | 1/5/2000 | 1/6/2000 | P | PART |
Jim Storey
|
|
|
SHAWN-- ###-#### CEILING COVER. Conf. w/Arch.
|
FIRE-Supply Line Cover | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PART |
Joe Tawney
|
|
|
sean ###-####. Ok to cover boys & girls locker rooms hard lid areas add two braces & one sprinkler head.
|
BLD-Framing/Rough-in | 12/23/1999 | 12/23/1999 | 12/23/1999 | P | FAIL |
Carl Dependahl
|
|
|
Need arch's resubmittal for smoke/fire dampers...complete.
|
BLD-Conference | 12/8/1999 | 12/8/1999 | 12/8/1999 | A | PART |
Carl Dependahl
|
|
|
reviewed eng's reports of wip...
|
BLD-Conference | 10/26/1999 | 10/28/1999 | 10/28/1999 | A | PART |
Carl Dependahl
|
|
|
conference Jim ###-#### Need test results for ASTM E735-spray applied fire proofing. Preliminary work to begin.
|
INSP - Final | 8/20/1999 | 8/23/1999 | 8/23/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/23/99 340 - TIM ###-#### need fire, p.u relocatable permits, etc.
|
INSP-Final Inspection | 8/20/1999 | 8/23/1999 | 8/23/1999 | P | PART |
Joe Tawney
|
|
|
09/01/99 406 - FINAL OK FOR TEMP OCC
|
INSP - Framing/ Rough-in | 7/22/1999 | 7/22/1999 | 7/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED ADD'L PERMIT FOR RELOC. CLASSRMS PER MIKE O.
|
INSP - Framing/Rough-in | 7/21/1999 | 7/21/1999 | 7/21/1999 | P | PART |
Carl Dependahl
|
|
|
07/21/99 340 - Jim; ok to place 1st layer at alcove at corr. lid (classr
|
INSP - Framing/Rough-in | 7/20/1999 | 7/20/1999 | 7/20/1999 | P | FAIL |
Carl Dependahl
|
|
|
07/20/99 340 - WALL INSPECTION HALL JIM ###-####; wall, need clg detail
|
INSP-Sprinkler Rough-in/Hydro | 7/20/1999 | 7/20/1999 | 7/20/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ALL UNDERGROUND PIPING
|
INSP - Framing/Rough-in | 7/16/1999 | 7/19/1999 | 7/19/1999 | A | PART |
Carl Dependahl
|
|
|
07/19/99 340 - sheetrock inspection classroom hallway Jim ###-#### anchor inspection on portables
|
INSP - Foundation | 7/16/1999 | 7/16/1999 | 7/16/1999 | | PART |
Carl Dependahl
|
|
|
07/16/99 340 - gym fnd; spec insp onsite, need eng's review of all discr
|
INSP - Foundation | 6/23/1999 | 6/24/1999 | 6/24/1999 | P | PART |
Carl Dependahl
|
|
|
06/24/99 340 - ###-####//FOOTINGS GYMNASIUM mti onsite. conf w/ Jim, CM
|