Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-00711
StatusFinaled
Name EVERETT DAVIS III TRUST
Site Address 1051 BOEING ST
Project NameBOEING WAREHOUSE #7
Customer Number 
ePlanReviewNo
Description
*PAM OIL, INC.* To remodel a 22,440 sq.ft. main floor with 3 mezzanines as follows: 1) - a 2,240 s.f. mezzanine, "S1", light storage occupancy use, over the office area, based on 1980 permit, for 100 psf -floor load (load to be posted); 2) - a new 1,860 s.f. rack system mezzanine area for storage, "S-1" occupancy use; and a new 1,386 s.f. rack system mezzanine, "S-1" occupancy use, both part of a pre-engineered combination two tier W/ mezzanine steel rack system, manufactured by "EZ Rack" & "Rivetrite" , respectively for a TOTAL floor area of 27,926 sq. ft. (includes mezzanine areas). *NOTICE TO ALL* - WITHIN 30 DAYS FROM THE ISSUANCE OF THIS PERMIT, AS A CONDITION OF CONTINUED OCCUPANCY, PAM OIL SHALL REDUCE & MAINTAIN QUANTITIES OF HAZARDOUS MATERIALS TO COMPLY WITH ALLOWABLE LIMITS OF TBLS. 3-D & 3-E 1997UBC, TO SATISFY THE OCCUPANCY USE DECLARED IN THE APPLICATION FOR PERMIT; 13 POINT PROPOSAL FROM JIM CALL, FPE, 3/13/2000; AND PER LETTER ON FILE FROM JOEL FASNACHT, PAM CO., 11/3/2000, TO MEET REQUIREMENTS FOR AN "S1 / B" OCCUPANCY GROUPS. All per approved plans, notes & attachments on file. The use of the space is declared by tenant as WHOLESALE WAREHOUSE of HIGH PILE STORAGE, W/ RACKS & FLOOR STORAGE OF ALLOWABLE LIMIT HAZARDOUS MATERIALS & OTHER PRODUCTS, with accessory use as administration office's. NOTE: This building is fully fire sprinklered per specific guidelines & qualifications of sprinkler permit FIR00-00201. SEPARATE APPLICATION, ENGINEERING AND PLANS FOR A PERMIT ARE REQUIRED FOR ALL STEEL STORAGE RACKS. (P.C.#191-99)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 9/5/20019/5/2001 DONE
Details
BLD-Other8/30/20018/30/20018/30/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/30/2001 at 09:11:18. Contact: ###-####. final ok 8/30/2001 3:51:20 PM
FIRE-Final Inspection8/30/20018/30/20018/30/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/30/2001 at 09:10:33. Contact: ###-####.
BLD-Aging Inspection8/22/20018/22/20018/22/2001 PASS
DetailsJim Storey
wip. 8/23/2001 2:07:52 PM
BLD-Framing/Rough-in6/21/20016/22/20016/22/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/21/2001 at 15:16:19. Contact: ###-####. c/n must meet ada 18 inches at latch side door to office / ok to cover framing on restrooms. 6/22/2001 9:52:21 AM