BLD-Final | 12/23/1999 | 12/27/1999 | 12/27/1999 | A | PASS |
Jim Sly
|
|
|
Final reinspect- Younce Dental :) this is the one we talked about. Ok for perm. occ. providing all required signatures obtained.
|
Permanent Occupancy | | 12/27/1999 | 12/27/1999 | | DONE |
|
|
|
|
BLD-Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | CANC |
Tom Arcoraci
|
|
|
###-#### Not ready
|
BLD-Final | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PART |
Jim Sly
|
|
|
TY--- ###-#### FN OCC C/N.. Obtain perm. Occ. Staus within 90 days.
|
FIRE-Final Inspection | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PART |
Joe Tawney
|
|
|
###-#### Ty Reinsp. Ok for perm. Occ.
|
BLD-Final | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | FAIL |
Alan Hauser
|
|
|
Ty ###-#### C/N firestop 1hr ceiling.
|
FIRE-Final Inspection | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | FAIL |
Joe Tawney
|
|
|
Ty ###-#### Reinsp. Fail smoke seals, paperwork
|
FIRE-Final Inspection | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | FAIL |
Joe Tawney
|
|
|
tye ###-#### Final fail C/N issued
|
BLD-Framing/Rough-in | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PART |
Jim Sly
|
|
|
tye ###-#### grid Ceiling grid ok
|
BLD-Framing/Rough-in | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | FAIL |
Jim Sly
|
|
|
grid ceiling tye ###-#### Ceiling grid not ready
|
INSP - Framing/Rough-in | 9/15/1999 | 9/15/1999 | 9/15/1999 | P | PASS |
Jim Sly
|
|
|
|
INSP - Framing/Rough-in | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | FAIL |
Jim Sly
|
|
|
COMPLETE DRAFTSTOP DOOR LATCHES AND HOLES
|
INSP - Framing/Rough-in | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | FAIL |
Jim Sly
|
|
|
09/02/99 316 - Complete prev corr
|
INSP - Framing/Rough-in | 8/26/1999 | 8/27/1999 | 8/27/1999 | P | PART |
Jim Sly
|
|
|
08/27/99 316 - Conversation/Tye allowed to rock Bsmnt walls and 1 side M
|
INSP - Framing/Rough-in | 8/24/1999 | 8/25/1999 | 8/25/1999 | A | FAIL |
Jim Sly
|
|
|
08/25/99 316 - Cancelled by Wright Bros
|
INSP - Framing/Rough-in | 8/23/1999 | 8/23/1999 | 8/23/1999 | P | FAIL |
Jim Sly
|
|
|
08/23/99 316 - C/N...Truss bracing, fix draftstops, .....
|
INSP - Framing/Rough-in | 8/18/1999 | 8/18/1999 | 8/18/1999 | P | PART |
Jim Sly
|
|
|
08/18/99 316 - Shear wall (int)....OK
|
INSP - Framing/Rough-in | 8/10/1999 | 8/10/1999 | 8/10/1999 | P | PART |
Jim Sly
|
|
|
08/10/99 316 - Shear wall...OK
|
INSP - Framing/Rough-in | 8/4/1999 | 8/4/1999 | 8/4/1999 | P | FAIL |
Jim Sly
|
|
|
08/04/99 316 - C/N...Engineer to OK HPAHD 22 strap locations...complete
|
INSP - Foundation | 6/7/1999 | 6/7/1999 | 7/6/1999 | P | FAIL |
Jim Sly
|
|
|
06/07/99 316 - Cancelled by contr
|
INSP - Foundation | 6/25/1999 | 6/28/1999 | 6/28/1999 | A | PART |
Jim Sly
|
|
|
06/28/99 316 - Remainder of footings and rebar appear OK
|
INSP - Foundation | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PART |
Alan Hauser
|
|
|
06/16/99 350 - talked to ty, had special inspector on site
|
INSP - Foundation | 6/7/1999 | 6/8/1999 | 6/8/1999 | A | FAIL |
Alan Hauser
|
|
|
06/08/99 350 - done by #316
|
INSP - Foundation | 6/8/1999 | 6/8/1999 | 6/8/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - FOOTING FOR BSMNT ONLY...OK (2500PSI)
|