INSP - Final | 7/27/1999 | 7/28/1999 | 7/28/1999 | A | PASS |
|
|
|
07/28/99 338 - signed the perm col of the occ req card
|
Permanent Occupancy | | 7/27/1999 | 7/27/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 7/23/1999 | 7/23/1999 | 7/23/1999 | A | PASS |
Rick Jackson
|
|
|
alarms tested okay - occ approved
|
INSP - Framing/Rough-in | 4/20/1999 | 4/20/1999 | 4/21/1999 | P | PART |
|
|
|
04/20/99 338 - made ok r-bar placed
|
INSP - Framing/Rough-in | 4/13/1999 | 4/15/1999 | 4/15/1999 | P | PART |
|
|
|
04/15/99 338 - made ok for seizmic
|
INSP-Supply line flush | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | PASS |
Rick Jackson
|
|
|
Eric ###-#### retest of flow with Bill from united Water
|
INSP-Supply line flush | 4/13/1999 | 4/13/1999 | 4/13/1999 | A | FAIL |
Rick Jackson
|
|
|
iron deposits/red water from flow
|
INSP - Framing/Rough-in | 4/8/1999 | 4/8/1999 | 4/8/1999 | | PART |
|
|
|
04/07/99 338 - made ok to cover behind othr insp
|