BLD-Final | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | PASS |
Jim Storey
|
|
|
###-####
|
FIRE-Final Inspection | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 13:49:25. Contact: ###-####.
|
Permanent Occupancy | | 4/16/2001 | 4/16/2001 | | DONE |
|
|
|
|
BLD-Final | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | NR |
Russ Owen
|
|
|
Kelly ###-#### called contractor ,they do not have fire/life inspection ,told them to recall. 4/13/2001 4:19:31 PM
|
BLD-Final | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | NR |
Russ Owen
|
|
|
kelly ###-#### fn
|
BLD-Concrete | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PASS |
Jim Storey
|
|
|
###-#### framing ok for cover / slab on grade ok. 3/26/2001 9:22:09 AM
|
BLD-Framing/Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | PART |
Jim Storey
|
|
|
###-#### fram ok pendig plm sign off./ frame around beam for gyp. attchment. 3/14/2001 9:15:58 AM
|
BLD-Concrete | 2/14/2001 | 2/14/2001 | 2/14/2001 | A | PART |
Jim Storey
|
|
|
###-#### SLAB placed w special insp. 2/14/2001 2:56:36 PM
|
BLD-Foundation | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Jim Storey
|
|
|
###-#### Kelly G. slab ok 2/13/2001 11:05:42 AM
|
BLD-Foundation | 1/29/2001 | 1/31/2001 | 1/31/2001 | A | PART |
Russ Owen
|
|
|
###-####poured at this time,s-i required insp. 1/31/2001 11:39:35 AM
|
BLD-Footing | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Jim Storey
|
|
|
###-#### south wall line ground frozen special insp. to be on site at pm to check concrete will have resolve to freezing isue if resolved rebar ok for placement of concrete. 1/23/2001 10:01:11 AM
|
BLD-Footing | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by Inspector: 301 On 1/22/2001 9:27:45 AM refur to add insp same day. 1/23/2001 10:01:56 AM
|
BLD-Footing | 1/18/2001 | 1/22/2001 | 1/22/2001 | A | CANC |
Jim Storey
|
|
|
###-#### 1/22/2001 8:52:29 AM rescheduled for 1/23/01 1/22/2001 9:28:37 AM
|
BLD-Footing | 1/17/2001 | 1/18/2001 | 1/18/2001 | P | FAIL |
Jim Storey
|
|
|
FT DAVE- ###-#### ft soil failled at corner of wesa / south peir. archived engineered resubmital and left copy on site. 1/18/2001 3:10:34 PM
|
BLD-Footing | 1/12/2001 | 1/16/2001 | 1/16/2001 | A | NH |
Dave Hannah
|
|
|
FT DAVE ###-####
|