Permit Information
Permit NumberBLD99-01126
StatusFinaled
Name TRUS JOIST
Site Address 2910 E AMITY RD
Project NameTRUS JOIST-PHASE IIB
Customer Number 
ePlanReviewNo
Description
TRUS JOIST MACMILLAN (PHASE IIB OF TECHNOLOGY CENTER PROJECT)* TO CONSTRUCT A 27,295 SQUARE FOOT, 2 STORY, WOOD FRAME OFFICE ADDITION AT THE NORTH END OF THE TECHNOLOGY CENTER PLANT FACILITY PRESENTLY UNDER CONSTRUCTION UNDER AN ADA COUNTY BUILDING PERMIT. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR UNLIMITED AREA WITH MINIMUM 60 FOOT ADJOINING YARDS ENTIRELY SURROUNDING THE TECHNOLOGY CENTER. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS.PC#297-99/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/13/200010/16/200010/16/2000APASS
DetailsRuss Owen
Marv Meyer, ###-#### - I have the card on my desk - Cathy
Permanent Occupancy 10/16/200010/16/2000 DONE
Details
BLD-Final7/7/20007/7/20007/7/2000PPART
DetailsRuss Owen
Marv, ###-#### - Russ, I have the bond for this (1) stair run, top step. 7/10/00 10:31:13 AM
BLD-Final7/3/20007/3/20006/30/2000PFAIL
DetailsRuss Owen
C/n stair, zonning, code enforcement required for temp.
FIRE-Final Inspection6/29/20006/30/20006/30/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/29/2000 at 13:15:24. Contact: .
FIRE-Final Inspection6/15/20006/20/20006/20/2000PFAIL
DetailsRick Jackson
bob--###-#### fn fire C/N issued 6/27/00 2:55:31 PM
BLD-Framing/Rough-in5/22/20005/23/20005/23/2000AFAIL
DetailsRuss Owen
ceiling ted ###-#### Fail C/N posted 5/24/00 11:09:52 AM
BLD-Framing/Rough-in4/17/20004/18/20004/18/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/17/2000 at 18:16:57. Contact: ###-####. Ok to sheetrock upper floor, need top of office wall restraints. 4/18/00 2:00:21 PM
BLD-Framing/Rough-in4/14/20004/17/20004/17/2000ACANC
DetailsRuss Owen
###-#### 2nd floor framing Unable to do to many others inspections, people off. 4/18/00 10:51:42 AM
BLD-Framing/Rough-in4/5/20004/6/20004/6/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/05/2000 at 18:24:13. Contact: ###-####. 1st level , need plumbing, engineers letter of inspection. 4/6/00 2:57:51 PM
BLD-Framing/Rough-in4/4/20004/5/20004/5/2000PCANC
DetailsRuss Owen
Ted ###-#### To many other inspections, unable to do 4/6/00 8:56:32 AM
FIRE-Supply Line Cover1/20/20001/21/20001/21/2000APASS
DetailsRick Jackson
Brad ###-#### set up an appointment at 8:30 Ok to cover. 1/21/00 1:54:10 PM
BLD-Footing11/4/199911/5/199911/5/1999PPART
DetailsRuss Owen
TED ###-#### Special inspector approval required.
BLD-Footing11/3/199911/4/199911/3/1999ACANC
DetailsRuss Owen
10 -12 YARDS TED ###-#### CANCELLED BY TED
BLD-Footing11/1/199911/2/199911/2/1999APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/01/1999 at 09:17:28. Contact: . Subject to special insp. Onsite at time.
BLD-Footing10/19/199910/20/199910/20/1999PPASS
DetailsJim Storey
before 2:30 pouring at that time-pads for columns steel steamwall ted ###-#### Center pads and south wall ok
BLD-Footing10/6/199910/7/199910/7/1999PPART
Details
Ted ###-#### Need spec insp letter not on site need log & proper signoffs.
BLD-Foundation10/5/199910/5/199910/5/1999PPART
DetailsRuss Owen
Ted Parrott ###-#### subject to strata special insp report