BLD-Final | 7/24/2000 | 7/26/2000 | 7/26/2000 | P | PASS |
Jim Storey
|
|
|
###-#### fn occ
|
FIRE-Final Inspection | 7/24/2000 | 7/26/2000 | 7/26/2000 | A | PASS |
Rick Jackson
|
|
|
###-#### fire fn
|
Permanent Occupancy | | 7/26/2000 | 7/26/2000 | | DONE |
|
|
|
|
BLD-Final | 4/18/2000 | 4/18/2000 | 4/18/2000 | P | PART |
Jim Storey
|
|
|
###-#### temp occ. only. 4/18/00
|
BLD-Final | 4/14/2000 | 4/17/2000 | 4/17/2000 | P | FAIL |
|
|
|
###-#### need to recall 04/17/2000
|
FIRE-Final Inspection | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PART |
Rick Jackson
|
|
|
###-#### Temp. occ. approved per Dave Miller; awaiting smoke vents 4/17/00 1:48:57 PM
|
BLD-Other | 3/31/2000 | 3/31/2000 | 3/31/2000 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 3/31/00 RESUBMATIAL FOR DELEATING RATED CHEM-STORAGE ROOM APPROVED. OVER EXEMPT AMOUNTS PER THE 97 UBC 3-D.
|
BLD-Other | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by Inspector: 301 On 3/31/00 resubmital droped off at site. 4/4/00
|
BLD-Framing/Rough-in | 3/9/2000 | 3/9/2000 | 3/9/2000 | P | PART |
Jim Storey
|
|
|
###-#### 1hr wall frame ok also boxed out ele. panel. 3/14/00 10:38:30 AM
|
FIRE-Supply Line Cover | 1/20/2000 | 1/20/2000 | 1/20/2000 | A | PART |
Rick Jackson
|
|
|
not connected to UW; 10 feet remaining to complete to street
|