BLD-Final | 2/4/2000 | 2/7/2000 | 2/7/2000 | A | PASS |
|
|
|
Church - done hardware installed and elec signed off 2/10/00 10:11:07 AM
|
BLD-Conference | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | PASS |
|
|
|
with arch about temp 45 day call made I explained required signoffs and proceedures.
|
BLD-Final | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PART |
|
|
|
dwayne ###-#### Ok for temp occ. Ele. C/N in force.
|
BLD-Final | 11/2/1999 | 11/3/1999 | 11/4/1999 | P | FAIL |
|
|
|
dwaine ###-#### temp occ Exit doors do not operate correctly.
|
FIRE-Final Inspection | 10/29/1999 | 11/1/1999 | 11/1/1999 | P | PASS |
Rick Jackson
|
|
|
RE-INSP FN-- ###-####--DWAYNE Occupancy approved
|
BLD-Framing/Rough-in | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | FAIL |
|
|
|
Dwayne ###-#### C/N issued seizmic slack wires missing and diffuser to grid connection
|
FIRE-Alarm Testing | 10/25/1999 | 10/26/1999 | 10/26/1999 | P | FAIL |
Rick Jackson
|
|
|
ALARMCO ###-#### Duct detectors for AHU's not installed
|
FIRE-Final Inspection | 10/20/1999 | 10/25/1999 | 10/25/1999 | A | FAIL |
Rick Jackson
|
|
|
FN FIRE ALARMCO-- ###-#### Exit light; emergency lights; alarm plans; sprinkler room 103; occupant load sign.
|
INSP - Framing/Rough-in | 8/26/1999 | 8/26/1999 | 8/26/1999 | P | PART |
|
|
|
08/26/99 338 - need to write correction for new contractor
|
INSP-Conference | 8/27/1999 | | 8/26/1999 | | PART |
|
|
|
conf on the un-completed parts of the prior permit bld97-1561 c/n to be issued on the corrections to be made
|