BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Jim Storey
|
|
|
###-####--dave-- found wall insp walls ok retaining. 6/9/00 11:37:28 AM
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Jim Storey
|
|
|
###-####--dave-- found wall insp
|
BLD-Footing | 6/1/2000 | 6/2/2000 | 6/2/2000 | P | PASS |
Jim Storey
|
|
|
retaining wall ###-####
|
BLD-Final | 3/9/2000 | 3/10/2000 | 3/10/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 16:00:48. Contact: ###-####.
|
BLD-Final | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### drainage, ext. steps, energy code, permit for completion of basement. 2/28/00 2:11:25 PM
|
BLD-Framing/Rough-in | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | FAIL |
Carl Dependahl
|
|
|
re-bar-- insp jack ###-####---cancel per jack Need compaction/soils; concrete "sub" has pulled off job. 1/18/00 9:12:44 AM
|
BLD-Footing | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | PART |
Carl Dependahl
|
|
|
part, south side ret. wall ftg; need further clarification of eng'g; how is excav & slope above wall to be performed? 342' s area
|
BLD-Footing | 12/23/1999 | 12/23/1999 | 12/23/1999 | P | PART |
Carl Dependahl
|
|
|
Partial ftg., South side took for Russ.
|
BLD-Footing | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | CANC |
Russ Owen
|
|
|
randy ###-#### or jack ###-####. Transfer to Carl D. 340.
|
BLD-Framing/Rough-in | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 10/27/1999 at 10:44:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | FAIL |
Wes Worcester
|
|
|
Ogata construction ###-#### #2 & #4 previous C/N not done
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
Wes Worcester
|
|
|
gib--- - ###-#### fr insp-- Nailing, Truss engineering, stair rise landing etc.
|
BLD-Framing/Rough-in | 10/6/1999 | 10/6/1999 | 10/6/1999 | P | PART |
Wes Worcester
|
|
|
sheer wall \\###-#### Gibb
|
BLD-Framing/Rough-in | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Wes Worcester
|
|
|
BRITTA-- ###-#### SHEAR WALL INSP need approved plan w/ revisions on site
|
BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | FAIL |
Wes Worcester
|
|
|
BIRTTA- ###-#### SHEAR WALL INSP Need approved plan and engineering do shear per plan and engineering
|
INSP - Concrete | 8/12/1999 | 8/13/1999 | 8/13/1999 | P | PART |
Wes Worcester
|
|
|
08/13/99 342 - BASEMENT WALL, READY AFT. 1PM. JAKE ###-####X17145
|
INSP - Foundation | 8/10/1999 | 8/10/1999 | 8/10/1999 | | PART |
Wes Worcester
|
|
|
/ / 342 - WILL CALL WHEN READY poured per eng letter
|
INSP - Foundation | 8/9/1999 | 8/10/1999 | 8/9/1999 | A | FAIL |
Wes Worcester
|
|
|
08/10/99 342 - 1ST THING PLEASE. JAKE ###-#### X17145....fw4.35 incorrec
|
INSP - Foundation | 8/6/1999 | 8/6/1999 | 8/6/1999 | P | FAIL |
Wes Worcester
|
|
|
08/06/99 342 - DAVE ###-#### READY AT 2PM. plan and eng flawed, need e
|
INSP - Foundation | 7/30/1999 | 8/2/1999 | 8/2/1999 | P | FAIL |
Wes Worcester
|
|
|
08/02/99 342 - DAVE ###-#### EARLY PM IF POSSIBLE hole is wrong
|