BLD-Final | 4/11/2000 | 4/11/2000 | 4/11/2000 | A | PASS |
Carl Dependahl
|
|
|
Ok for Perm. C/O
|
BLD-Final | 4/11/2000 | 4/11/2000 | 4/11/2000 | A | PASS |
Carl Dependahl
|
|
|
Ok for perm. C/O.
|
Permanent Occupancy | | 4/11/2000 | 4/11/2000 | | DONE |
|
|
|
|
BLD-Final | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Ok for T/O; C/N other sig's, racks, etc. 3/21/00 9:28:12 AM
|
BLD-Final | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PASS |
Joe Tawney
|
|
|
Reinsp. ok for perm. occ.
|
BLD-Final | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | FAIL |
Joe Tawney
|
|
|
final fail fire extinguishers, align exit signs, fax of alarm signals.
|
BLD-Final | 3/16/2000 | 3/17/2000 | 3/17/2000 | P | FAIL |
Carl Dependahl
|
|
|
2 pm ###-#### Bryan
|
FIRE-Final Inspection | 3/6/2000 | 3/10/2000 | 3/10/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 13:25:07. Contact: ###-####. Alarm test fail reprogram 2 floor switches on dry pipe systems & tamper switches on ostey valves. 3/14/00 11:22:30 AM
|
BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/22/2000 | A | PART |
Carl Dependahl
|
|
|
Ryan Murphy ###-#### ceiling grid insp Ceiling grid @ r.rm/training rm. ok. 2/23/00 11:07:18 AM
|
BLD-Framing/Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PART |
Carl Dependahl
|
|
|
bryan ###-#### fr Canopies ok; firestop walls per plan @ int. 2/4/00 11:18:35 AM
|
BLD-Framing/Rough-in | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### WIP; complete install of LTT straps @ wall(s) for canopy per detail- Keep C/N. 1/25/00 12:14:22 PM
|
BLD-Framing/Rough-in | 1/12/2000 | 1/12/2000 | 1/12/2000 | A | PART |
Carl Dependahl
|
|
|
Lowe's- canopy's- complete sheathing WIP.
|
BLD-Framing/Rough-in | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 22:26:57. Contact: ###-####. West & North side canopy.. WIP.
|
BLD-Framing/Rough-in | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### ryan. Main canopy @ entry- framing (studs) ok- need spec. insp. For struct. Steel (pending).
|
BLD-Framing/Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | FAIL |
Carl Dependahl
|
|
|
BRIAN ###-#### FR INSP WIP & canopies, looks ok; complete per plan C/N.
|
BLD-Framing/Rough-in | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 16:42:10. Contact: ###-####. Canopy not complete, WIP walked job w/supt.
|
BLD-Conference | 12/8/1999 | 12/8/1999 | 12/8/1999 | A | PASS |
Carl Dependahl
|
|
|
reviewed spec insp's; wip...
|
BLD-Framing/Rough-in | 11/8/1999 | 11/12/1999 | 11/12/1999 | A | PART |
Jim Storey
|
|
|
mark ###-#### masonary grout insp S/I no stop.
|
FIRE-Sprinkler Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | PASS |
Joe Tawney
|
|
|
page ###-#### --sam r/i---call 1st before insp Underground ok to cover.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/10/1999 | 11/10/1999 | A | PART |
Carl Dependahl
|
|
|
mark ###-#### masonary grout insp Spec. insp. Onsite.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/9/1999 | 11/9/1999 | A | PART |
Carl Dependahl
|
|
|
mark ###-#### masonary grout insp Strata onsite.
|
BLD-Other | 10/25/1999 | 10/29/1999 | 10/29/1999 | A | PART |
Carl Dependahl
|
|
|
masonary grout mark ###-#### Spec. insp.
|
BLD-Other | 10/25/1999 | 10/28/1999 | 10/28/1999 | A | PART |
Carl Dependahl
|
|
|
masonary grout mark ###-#### Strata onsite
|
BLD-Other | 10/25/1999 | 10/27/1999 | 10/27/1999 | A | PART |
Carl Dependahl
|
|
|
marsonary grout mark ###-#### Strata onsite
|
BLD-Other | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PART |
Carl Dependahl
|
|
|
masonary grout mark ###-####; spec insp onsite
|
BLD-Other | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | PART |
Carl Dependahl
|
|
|
masonary grout mark ###-#### Ext. walls, spec. insp. Onsite
|
BLD-Framing/Rough-in | 10/11/1999 | 10/15/1999 | 10/15/1999 | A | PART |
Carl Dependahl
|
|
|
masonary ground Mark ###-#### Strata onsite
|
BLD-Framing/Rough-in | 10/11/1999 | 10/14/1999 | 10/14/1999 | A | PART |
Carl Dependahl
|
|
|
masonary ground ###-#### Poured W/O city insp. 10:40 am on site full time spec. insp.
|
BLD-Framing/Rough-in | 10/11/1999 | 10/13/1999 | 10/13/1999 | A | PART |
Carl Dependahl
|
|
|
masonary ground Mark ###-#### Masonry- strata onsite
|
BLD-Framing/Rough-in | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | PASS |
Carl Dependahl
|
|
|
masonry ground Mark ###-#### WIP masonary strata onsite.
|
BLD-Other | 10/6/1999 | 10/7/1999 | 10/7/1999 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/06/1999 at 16:27:28. Contact: . WIP masonry wall; strata onsite engr approved mortar change.
|
BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | PART |
Tom Arcoraci
|
|
|
MARK-- ###-#### MASONARY GROUT INSP Spec insp. On site
|
BLD-Foundation | 9/16/1999 | 9/17/1999 | 9/17/1999 | A | PART |
Carl Dependahl
|
|
|
|
INSP - Framing/Rough-in | 9/14/1999 | 9/15/1999 | 9/15/1999 | A | PART |
Carl Dependahl
|
|
|
1ST LIFT SO. ELEVATION; T.S. COL'S NOT IN PLACE, WILL NEED REBUILD, STRATA ONSITE
|
INSP - Foundation | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | PART |
Carl Dependahl
|
|
|
PENDING SPECIAL INSPCTN REPORT
|
INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PART |
Carl Dependahl
|
|
|
strata onsite - fnd. wall
|
INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PART |
Carl Dependahl
|
|
|
ftg....
|
INSP - Foundation | 9/8/1999 | 9/8/1999 | 9/8/1999 | P | PART |
Carl Dependahl
|
|
|
footing brian ###-####; MET W/ CHARLES, STRATA'S SPEC INSPECTOR. REVIEWED MASONRY CONST...WATCH FOR MORTAR PROBLEMS. AUTHORIZED STRATA TO STOP CONSTRUCTION IF SERIOUS NONCOMPLIANCE ISSUES ARISE.
|
INSP - Foundation | 9/3/1999 | 9/3/1999 | 9/3/1999 | P | PART |
Carl Dependahl
|
|
|
09/03/99 340 - brian ###-#### cell ft insp
|
INSP - Foundation | 9/1/1999 | 9/2/1999 | 9/2/1999 | P | PART |
Carl Dependahl
|
|
|
09/02/99 340 - RYAN ###-####; MTI ONSITE
|
INSP - Foundation | 8/30/1999 | 8/31/1999 | 8/31/1999 | A | PART |
Carl Dependahl
|
|
|
08/31/99 340 - BRYAN ###-#### FOOTING
|
INSP - Foundation | 8/30/1999 | 8/30/1999 | 8/30/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/30/99 340 - conf w/ Brian Murphy, Mcalvain Const; keep c/n
|
INSP - Foundation | 8/26/1999 | 8/27/1999 | 8/27/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/27/99 340 - READY AROUND 12NOON. BRIAN ###-#### c/n, need plans
|