BLD-Other | 4/13/2000 | 4/13/2000 | 4/13/2000 | | PASS |
Jim Storey
|
|
|
archived engineers final review letter.
|
BLD-Final | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 13:22:32. Contact: ###-####. shell bld. l/c ok 4/6/00
|
FIRE-Final Inspection | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 09:32:52. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/29/2000 | 3/1/2000 | 3/1/2000 | A | FAIL |
Jim Storey
|
|
|
PAD A\\MEL ###-#### Draft stop penatration/truss repair eng. nail hangers at sheer wall rafters. 3/2/00 10:33:02 AM
|
BLD-Conference | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PART |
Jim Storey
|
|
|
###-#### service corridor of rated 1 hour or only const shell 1 hr as to exit loading-
|
BLD-Framing/Rough-in | 12/6/1999 | 12/7/1999 | 12/8/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 09:55:12. Contact: ###-####. Roof nailing ok.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
Jim Storey
|
|
|
PARTIAL FRAMING MEL ###-#### Work in progress, straps to roof in place teco nails verify plan/ TJI roof support North/East not appropriate insulation/ beam pocket.
|
BLD-Footing | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | PART |
Jim Storey
|
|
|
mel ###-#### Covered with special insp. Pending report
|