Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01838
StatusFinaled
Name HEIKES BERT ET UX
Site Address 2705 W SPAULDING ST
Project NameSPAULDING PARK CONDO
Customer Number 
ePlanReviewNo
Description
SPAULDING PARK CONDOMINIUM BUILDING "A" * TO CONSTRUCT A NEW 4,476 SQ.FT. TWO STORY, WOOD FRAMED FOUR UNIT CONDOMINIUM. EACH UNIT IS APPROXIMATELY 1084 SQ.FT. IN AREA AND HAVE TWO BEDROOMS AN TWO BATHROOMS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND THE 1997 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE LANDSCAPING AND PARKING LOT. ADDITIONAL PERMIT REQUIRED FOR THE INSTALLATION OF THE CARPORTS. MJP DRH99-0069 CUP99-0007 PC#488-99
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/3/20008/3/20008/3/2000PPASS
DetailsJim Storey
ted ###-####
BLD-Final8/3/20008/3/20008/3/2000PPASS
DetailsJim Storey
ted ###-####
Permanent Occupancy 8/3/20008/3/2000 DONE
Details
BLD-Final7/20/20007/20/20007/20/2000PPASS
DetailsJim Storey
allen--- ###-#### fn
BLD-Final6/14/20006/14/20006/14/2000PPART
DetailsJim Storey
Ted ###-#### need s door lables re applaied by agencie. 6/14/00 4:55:02 PM
FIRE-Final Inspection6/12/20006/13/20006/13/2000APASS
DetailsRick Jackson
ted ###-####
FIRE-Final Inspection5/8/20005/9/20005/9/2000AFAIL
DetailsRick Jackson
allan ###-#### fn fire Fire lanes not complete. 5/11/00 11:09:28 AM
BLD-Other2/10/20002/10/20002/10/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/10/2000 at 10:00:15. Contact: ###-####. 1st 5/8 gyp on ceiling nailing approved.
BLD-Energy code compliance2/4/20002/7/20002/7/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/04/2000 at 13:23:27. Contact: ###-####. Frame c/n ok insulation ok
BLD-Framing/Rough-in1/27/20001/28/20001/28/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/27/2000 at 11:57:57. Contact: ###-####. c\n posted 1/28/00 1:12:22 PM
BLD-Framing/Rough-in1/26/20001/26/20001/26/2000PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/26/2000 at 10:39:34. Contact: . plans on site do not have attached documents left c/n posted on site 1/27/00 2:39:19 PM
BLD-Framing/Rough-in1/7/20001/10/20001/10/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/07/2000 at 14:10:25. Contact: ###-####. Gyp. nail ok.
BLD-Framing/Rough-in11/24/199911/24/199911/24/1999PPART
DetailsJim Storey
shear nail ###-#### Shear ok exterior.
BLD-Framing/Rough-in11/15/199911/16/199911/16/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/15/1999 at 08:07:01. Contact: ###-####. Shear wall ok exterior walls.
BLD-Conference10/18/199910/19/199910/19/1999APASS
DetailsJim Storey
TED--- ###-#### CONF INSP Conf. On sie pre const.
BLD-Foundation9/29/19999/30/19999/30/1999APASS
DetailsJim Storey
BLD-Footing9/28/19999/29/19999/30/1999APART
DetailsJim Storey
Todd ###-#### Placed W/O inps. Set backs ok