BLD-Final | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PASS |
Carl Dependahl
|
|
|
Final reinspect... 5/11/2001 2:58:07 PM
|
BLD-Final | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | FAIL |
Carl Dependahl
|
|
|
Final reinspect - Cathy has the card - Dave, ###-####- call 1st so he can meet you; need elec permits for elevator & sensors finalled...spoke w/ bldr...recall. 4/27/2001 12:28:30 PM
|
BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Jim Storey
|
|
|
tom ###-#### tenp occ ok c/n posted for other isues to be completed. 11/9/2000 4:15:58 PM
|
BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Jim Storey
|
|
|
tom ###-#### tenp occ ok c/n posted for other isues to be completed. 11/9/2000 4:15:58 PM
|
BLD-Conference | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/7/2000 3:38:48 PM w/ 301 re final insp c/n issued.
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Jim Storey
|
|
|
FN TOM ###-#### c/n isued 4 hr p/l protection not complet. ok for temp upon completion of this isue. other isues can be completed on temp occ time frame. 11/7/2000 3:16:07 PM
|
FIRE-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Rick Jackson
|
|
|
TOM ###-#### FIRE FN
|
BLD-Final | 10/26/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Jim Storey
|
|
|
FN -TOM ###-#### fire stopping in progess ok for four hr assemblie. 10/31/2000 11:42:40 AM
|
FIRE-Final Inspection | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 10/30/2000 need all rated glazing installed and door hardware; extinguishers; generator load test; bumper block at gas meter; c/n issued 10/30/2000 2:08:47 PM
|
BLD-Final | 10/20/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Storey
|
|
|
fn --tom-- ###-####
|
BLD-Final | 10/24/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Storey
|
|
|
FN OCC- DAVE- ###-####
|
BLD-Framing/Rough-in | 10/6/2000 | 10/12/2000 | 10/12/2000 | P | FAIL |
Jim Storey
|
|
|
fr insp tom ###-#### 4 hr wall not complet/need all special insp. and pt log./ exit signage 100 ft visablity isue/3/4 1 hr at stairs infill./ duct from tennent space to storage qustion of occ. sepration horisontal. engineering and arch. changes to be submited. 10/13/2000 5:24:41 PM
|
BLD-Other | 9/13/2000 | 9/13/2000 | 9/13/2000 | | PASS |
|
|
|
Dave Hattrick and 305 reviewd existing cable rails on 9-12-2000 we found that as currently constucted they will not meet the criteria that was outlined to myself, perry paine and jim storey and as on file with the inspector which stated they met national application and a 4" wedge could not be plulled through the spaces between the guard rails at 30 pounds of pull. I will notify contractor of our findings, rails shall be in compliance with UBC as they were directed.
|
BLD-Framing/Rough-in | 8/25/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
Jim Storey
|
|
|
WEST EQUIP ROOM ROOF---TOM ###-#### -- no ancer on phone or person on site to contact. 8/30/2000 3:46:29 PM
|
BLD-Framing/Rough-in | 8/25/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
|
|
|
WEST EQUIP ROOM ROOF---TOM ###-#### -- no one on site by 301 9/1/2000 10:46:37 AM
|
BLD-Framing/Rough-in | 8/25/2000 | 8/28/2000 | 8/28/2000 | A | PART |
|
|
|
REBAR INSP--###-#### -TOM--WEST EQUIP ROOM WALLS pending sp insp approvals 8/29/2000 10:12:49 AM
|
BLD-Concrete | 8/21/2000 | 8/23/2000 | 8/23/2000 | P | PART |
|
|
|
east stair tower beams and columns 7th and 8th floor ###-#### pending sp insp aprovals 8/24/2000 9:45:50 AM
|
BLD-Concrete | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | PART |
|
|
|
west stair tower beams and columns 7th to 8th floor ###-#### pending sp insp approvals 8/22/00 10:02:37 AM
|
BLD-Concrete | 8/18/2000 | 8/21/2000 | 8/21/2000 | A | PART |
|
|
|
level 6 and 7\\###-#### Tom pending sp insp approvals 8/21/00 11:15:20 AM
|
BLD-Foundation | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PART |
|
|
|
rebar Tom ###-#### west stair tower level 6,beams pending sp insp approvals 8/17/2000 3:26:59 PM
|
BLD-Concrete | 8/16/2000 | 8/16/2000 | 8/16/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 07:01:53. Contact: ###-####. pending sp insp approvals 8/16/2000 3:31:52 PM
|
BLD-Concrete | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | PART |
|
|
|
west colum and beams 3rd to 4th floors\\rebar pending sp insp approvals 7/31/2000 3:22:55 PM
|
BLD-Concrete | 7/24/2000 | 7/26/2000 | 7/26/2000 | A | PART |
|
|
|
east pent house floor ###-#### pending sp insp approvals 7/25/2000 2:30:59 PM
|
BLD-Concrete | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PART |
|
|
|
location 2nd to 3rd level west beams ###-#### with sp insp approval 7/25/2000 11:32:56 AM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PART |
|
|
|
beams & columns for 2nd to 3rd level--east core-- tom ###-#### pending sp insp approvals 7/21/2000 3:00:42 PM
|
BLD-Foundation | 7/18/2000 | 7/19/2000 | 7/19/2000 | P | PART |
|
|
|
pouring around noon tom for re-bar east eigth floor walls Tom ###-#### pending sp insp approals 7/19/2000 10:27:29 PM
|
BLD-Concrete | 7/12/2000 | 7/17/2000 | 7/17/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 16:08:31. Contact: ###-####. pending s/i report 7/17/2000 11:30:26 AM
|
BLD-Concrete | 7/12/2000 | 7/14/2000 | 7/14/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 16:07:54. Contact: ###-####. pend sp nsp report 7/14/2000 10:02:32 AM
|
BLD-Concrete | 7/12/2000 | 7/12/2000 | 7/12/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 06:43:46. Contact: ###-####. pending sp insp approval 7/12/00 3:27:20 PM
|
BLD-Concrete | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 13:09:57. Contact: ###-####. for the sides and back found only 7/10/00 1:16:17 PM for the sides and back only 7/10/00 1:16:37 PM
|
BLD-Foundation | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PART |
|
|
|
rebar location 6th floor east and west elevated decks-tom ###-#### with sp insp approvals 6/30/00 1:46:33 PM
|
BLD-Concrete | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 14:43:23. Contact: ###-####. pending sp insp approvals 6/26/00 4:59:20 PM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/21/2000 | 6/21/2000 | A | PART |
|
|
|
fourth level west deck re-bar Tom ###-#### with sp insp pending 6/21/00 10:24:39 AM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PART |
|
|
|
re-bar fourth level East deck Tom ###-#### madeok with sp insp approvals 6/21/00 10:08:05 AM
|
BLD-Other | 6/16/2000 | 6/19/2000 | 6/19/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 15:29:58. Contact: ###-####. r-bar in the stair tower 6/19/00 2:46:01 PM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | PART |
Jim Storey
|
|
|
re-bar 8th level west elevator core Tom ###-#### work in progess covered by special insp. 6/13/00 1:44:38 PM
|
BLD-Other | 6/7/2000 | 6/8/2000 | 6/8/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/07/2000 at 12:54:06. Contact: ###-####. with sp insp approvals 6/8/00 5:15:06 PM
|
BLD-Concrete | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 12:51:19. Contact: ###-####. made ok with sp insp approvals 6/1/00 9:15:36 AM
|
BLD-Concrete | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | PART |
|
|
|
rebar 2nd floor elevator deck on the east elevator ###-#### pend sp insp approvals 5/24/00 10:56:25 AM
|
BLD-Concrete | 5/22/2000 | 5/23/2000 | 5/23/2000 | A | PART |
|
|
|
###-#### east elevator core, the 6th through 8th floor pendingsp insp aprovals 5/24/00 11:23:50 AM
|
BLD-Concrete | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 15:35:26. Contact: ###-####. PENDING SP INSP APPROVALS 5/15/00 11:04:26 AM
|
BLD-Concrete | 5/15/2000 | 5/15/2000 | 5/15/2000 | P | PART |
|
|
|
Tom ###-#### east core wall 4th thru 6th floor with spinsp approvals 5/15/00 4:14:07 PM
|
BLD-Concrete | 5/5/2000 | 5/5/2000 | 5/5/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 06:48:53. Contact: ###-####. pending report from special insp. 5/5/00 11:17:56 AM
|
BLD-Concrete | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
|
|
|
###-#### East tower footers with sp insp approvals 5/2/00 4:03:58 PM
|
BLD-Conference | 5/1/2000 | 5/1/2000 | 5/1/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 5/1/00 WITH dAVE ON THE GUARDRAIL INTERMEDIATE ISSUE WITH DAVE REEDER AND DAVE A WITH ARCH. GUARD RAIL IS OK FOR DEFLECTION AND HEIGHT, VEHICLE BARRIER IS OK FOR DEF PER TABLE 16...INTERMEDIATE RAILS MUST BE THAT A 4" SPHERE CANNOT PENETRATE, PERIOD. 5/1/00 11:31:11 AM
|
BLD-Concrete | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
LOCATION EAST CORE ELEVATORS 2ND AND 3RD LEVEL\\###-#### pending sp inspapprovals 04/21/2000 8:11:47 AM
|
BLD-Conference | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
conference on the guardrail req for people vehicle restraint is ok 04/21/2000 8:12:17 AM
|
BLD-Concrete | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PART |
|
|
|
west 8th floor upstand beam ###-#### ok with sp insp approvals 04/13/2000
|
BLD-Concrete | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | PART |
|
|
|
8th floor\\###-#### pending sp insp approvals 04/11/2000
|
BLD-Concrete | 4/11/2000 | 4/11/2000 | 4/11/2000 | P | PART |
|
|
|
west side deck #15 and columns grid 1 A B C D E made ok with sp insp approvals 04/11/2000
|
BLD-Concrete | 4/7/2000 | 4/10/2000 | 4/10/2000 | P | PART |
|
|
|
east upstand beam level 8, colum grid 6 ghjklm\\###-####. rescheduled by 325. madeok with sp insp approvals 04/10/2000
|
BLD-Concrete | 4/7/2000 | 4/10/2000 | 4/10/2000 | P | CANC |
|
|
|
east upstand beam level 8, colum grid 6 ghjklm\\###-####. rescheduled by 325.
|
BLD-Concrete | 4/6/2000 | 4/6/2000 | 4/6/2000 | P | PART |
Jim Storey
|
|
|
EAST 8TH FLOOR ELVATED STAB\\###-#### covered by special insp.pending report. 4/6/00
|
BLD-Concrete | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PART |
|
|
|
grid 6 G H J K L M level 8 426*8984 pending sp insp reports 04/10/2000
|
BLD-Concrete | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PART |
|
|
|
7th floor grid 12456 abcdef\\###-#### pending sp insp approvals 04/03/2000
|
BLD-Concrete | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | PART |
|
|
|
upstand beam at grid A 7th level , columns on Grid 1 A,B, C, D ###-#### ok with sp insp approvals 03/31/2000
|
BLD-Concrete | 3/29/2000 | 3/30/2000 | 3/30/2000 | A | PART |
|
|
|
west 7th floor floor slab ###-#### pending sp insp approvals 3/30/00 10:12:34 AM
|
BLD-Concrete | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | PART |
|
|
|
grid lines 1, 1.1, 2, 6, on M and N ###-#### Dave with pending sp insp approvals 03/28/2000
|
BLD-Concrete | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/24/2000 at 12:25:59. Contact: ###-####. made ok pend sp insp approvals 03/27/2000 3:47:15 PM
|
BLD-Concrete | 3/27/2000 | 3/27/2000 | 3/27/2000 | | PART |
|
|
|
7th level g h j k l m 6\\###-#### with sp insp pending 03/28/2000
|
BLD-Concrete | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PART |
|
|
|
LEVEL SEVEN WEST\\###-#### ok pending sp insp approvals 03/22/2000 2:03:53 PM
|
BLD-Concrete | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | PART |
|
|
|
location level seven 1a b, 2a,b 3a, 4 5 6 bcdefg \\###-#### made ok with sp insp approvals 03/22/2000 7:01:44 AM
|
BLD-Concrete | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PART |
|
|
|
upstand beam west 6th level columns on grid 1 B,C,D,E,F,G Tom ###-#### made ok with sp insp approvals 03/17/2000 9:13:42 AM
|
BLD-Concrete | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PART |
|
|
|
pour 11 west deck N columns of grid 2 B,C,D,E,F,G ###-#### 7th floor ok with sp insp approval 03/16/2000 10:33:59 AM
|
BLD-Concrete | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PART |
|
|
|
west elevator core walls ###-#### Tom made ok with sp insp approval 03/16/2000 10:34:14 AM
|
BLD-Concrete | 3/15/2000 | 3/15/2000 | 3/15/2000 | P | PART |
|
|
|
###-#### columns grid 1 through 1.1 M,N,L,K,J on 6th level made ok pending sp insp approvals 03/16/2000 7:55:08 AM
|
BLD-Concrete | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 08:10:01. Contact: ###-####. made ok pending sp insp approvals 3/14/00 5:06:29 PM
|
BLD-Concrete | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 12:54:31. Contact: ###-####. pending sp insp approvals 3/9/00 10:21:26 AM
|
BLD-Concrete | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
|
|
|
columns on level 5 4b 5c 6d Tom ###-#### made ok to pour with sp insp approvals 3/8/00 8:55:13 AM
|
BLD-Concrete | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PART |
|
|
|
elevator east core from foundation to 2nd floor Tom ###-#### made ok with sp insp spprovels 3/6/00 5:49:28 PM
|
BLD-Concrete | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | PART |
|
|
|
5th floor upstand beam and columns on Grid 1b, c ,d, e and f Tom ###-#### made ok only with sp insp approvals 3/6/00 10:34:10 AM
|
BLD-Concrete | 3/1/2000 | 3/2/2000 | 3/2/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 13:18:50. Contact: ###-####. made ok to pour pending sp insp approvals 3/2/00 3:45:55 PM
|
BLD-Concrete | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 12:17:38. Contact: ###-####. made ok pending sp insp approvals 2/28/00 3:14:38 PM
|
BLD-Foundation | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | PART |
Jim Storey
|
|
|
LMN grid 6 level 5 and N1 and M1 columns on level 5 Tom ###-#### LMW grid level 5, N1 M1 columns level 5 pending spec. insp. report. 3/1/00 11:13:03 AM
|
BLD-Concrete | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | PART |
|
|
|
5th floor grid 1 G, H, J, K, L, columns 5th floor grid N upstand beam ###-#### made ok pending sp insp report 2/25/00 11:44:54 AM
|
BLD-Concrete | 2/24/2000 | 2/24/2000 | 2/24/2000 | P | PART |
|
|
|
5th floor slab east Tom ###-#### made ok with sp insp approvals 2/25/00 11:23:52 AM
|
BLD-Concrete | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | PART |
|
|
|
columns on 5th floor 2A , 3A, 2B, 4B, and 5C ###-#### made ok pending sp insp approvals 2/22/00 5:30:15 PM
|
BLD-Concrete | 2/17/2000 | 2/18/2000 | 2/18/2000 | P | PART |
Jim Storey
|
|
|
tom ###-#### --upstand beam w. end of the 4th level--columns- grid # 1-b,c,d,e, & f Pend SSI report. 2/22/00 10:11:51 AM
|
BLD-Concrete | 2/16/2000 | 2/16/2000 | 2/17/2000 | P | PART |
Jim Storey
|
|
|
###-#### tom 4th floor west slab Work in progress pending reports from special inspection agency. 2/17/00 10:07:08 AM
|
BLD-Concrete | 2/15/2000 | 2/15/2000 | 2/15/2000 | P | PART |
Jim Storey
|
|
|
grid L, K, & J on 4th floor, north wall ramp ###-#### pending special insp. report. 2/16/00 10:05:45 AM
|
BLD-Concrete | 2/14/2000 | 2/14/2000 | 2/14/2000 | P | PART |
Jim Storey
|
|
|
###-#### location grid N1 1.1 2 and 6 m2 m1 Placed w/special insp. pending report. 2/15/00 9:28:06 AM
|
BLD-Concrete | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PART |
|
|
|
grid line 6 G H K L M N upstand beam on N ###-#### made ok with sp insp approvals pending 2/11/00 5:42:20 PM
|
BLD-Concrete | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PART |
|
|
|
slab 4th floor\\###-#### made ok to pour pending sp insp approvals 2/10/00 10:26:18 AM
|
BLD-Concrete | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | PART |
|
|
|
tom ###-#### concrete columns a 1,2, & 3---- 3rd level made pending sp insp approvals r-bar is placed 2/8/00 8:18:59 AM
|
BLD-Concrete | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PART |
|
|
|
up turn beam on grid line A madeok with sp insp approvals r-bar is placed 2/8/00 8:37:52 AM
|
BLD-Concrete | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PART |
|
|
|
Pour #5 elevated slab. Tom; ###-####. made ok with sp insp approval 2/1/00 4:42:07 PM
|
BLD-Concrete | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 12:33:36. Contact: ###-####. pending sp insp approvals 1/26/00 10:44:58 AM
|
BLD-Concrete | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | PART |
|
|
|
dave reeder- ###-####--grid line 6, columns l. m. n, grid line 2, m, n, 3rd level r-bar placed sp insp ok 1/27/00 6:47:40 PM
|
BLD-Concrete | 1/24/2000 | 1/24/2000 | 1/24/2000 | P | PART |
|
|
|
###-#### Tom columns A 1, 2, 3 and B 4 , C 4 , D, E, F, G, 6 and foundation for elevator 2 and 3 made ok with sp insp approval pending 2/10/00 11:36:27 AM
|
BLD-Footing | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | PART |
|
|
|
upside beam on 3rd level--on n line--###-####-tom r-bar placed sp inspection approval still pending ok to pour with same 1/21/00 10:46:47 AM
|
BLD-Concrete | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | PART |
|
|
|
###-#### made ok to pour columns the r-bar is inspected and passed by myself and sp insp 1/20/00 11:46:57 AM
|
BLD-Concrete | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | PART |
|
|
|
###-#### WALK THROUGH WITH SUPER ON GUARDRAIL ELEVATIONS APPROVED FIX FOR ELEVATION CHANGE FOR THE BOTTOM CABLE USED FOR SAME 1/20/00 1:40:47 PM
|
BLD-Concrete | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | FAIL |
Jim Storey
|
|
|
###-#### TOM\\COL B C D E F ALL IN LINE ONE SECOND DECK, Col. ok pending SI report work in progress/c/n issued for col link 2 39 inch e/u for gaurdrail cabbles will not meet 42 inch min submit change.
|
BLD-Concrete | 1/11/2000 | 1/11/2000 | 1/11/2000 | P | PART |
|
|
|
made ok with sp insp approvals r-bar placed
|
BLD-Concrete | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 12:52:50. Contact: ###-####.
|
BLD-Concrete | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | part |
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 10:12:03. Contact: ###-####.r-bar placed made ok w sp insp
|
BLD-Concrete | 12/27/1999 | 12/28/1999 | 12/28/1999 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 13:25:14. Contact: ###-####. Made ok R-bar placed sp. insp. ok.
|
BLD-Footing | 12/17/1999 | 12/17/1999 | 12/17/1999 | P | PART |
|
|
|
dave--- ###-#### ft --north ft for stairs R-bar placed sp. Insp. Onsite.
|
BLD-Concrete | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PART |
|
|
|
grid lines A to G and from grid line 2 to 6 R-bar placed ok to pour.
|
BLD-Concrete | 12/7/1999 | 12/8/1999 | 12/8/1999 | P | PART |
|
|
|
###-####--TOM CONCRETE---RETENSION TANK FLOOR-WEST SLAB- & UPSTAND BEAM Ok to pour- sp. Insp. Made ok- R-bar placed.
|
BLD-Concrete | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PART |
|
|
|
elevated slab grid line 1 to 2, grid line g to n, PT Ok with sp. Insp. Approvals. R-bar placed.
|
BLD-Foundation | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
|
|
|
###-####--tom -pour re-bar for columns-d1, d2, a1 Ok to pour R-bar placd sp. Insp. Approved.
|
BLD-Foundation | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | PART |
|
|
|
tom --- e1, e2, f1, f2 on 2nd floor----###-#### -rebar Made ok R-bar placed spec. insp. Ok.
|
BLD-Foundation | 11/23/1999 | 11/23/1999 | 11/23/1999 | P | PART |
|
|
|
Dave ###-#### west stair way walls Ok to pour w/sp insp. Approval; R-bar placed.
|
BLD-Foundation | 11/18/1999 | 11/22/1999 | 11/22/1999 | A | PART |
|
|
|
WEST STAIRWELL FOOTING --- ###-####--DAVE ###-#### made ok R-bar placed sp. Insp. On site.
|
BLD-Foundation | 11/18/1999 | 11/22/1999 | 11/22/1999 | A | PART |
|
|
|
BETWEEN GRID LINE 2 & 6 --FOUND? DAVE ###-#### Ok to pour sp. Insp. On site.
|
BLD-Concrete | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PART |
|
|
|
GRID LINE 6, 3 COLUMNS--PILE CAP, GRID LINE A & 1 ---DAVE ###-#### Made ok w/spec. insp. Approvals.
|
BLD-Concrete | 11/16/1999 | 11/16/1999 | 11/16/1999 | | PART |
|
|
|
grid g to n and grid line 1 to 2 made ok w/sp insp. Approval.
walls: grid line 6 to 2
|
BLD-Concrete | 11/9/1999 | 11/10/1999 | 11/10/1999 | A | PART |
|
|
|
rebar columns grid lines 1 k j h & m dave ###-#### Ok to cover W/sp insp approval.
|
BLD-Foundation | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | PART |
|
|
|
REBAR FOR A STEPPED FOOTER BETWEEN N 1.1 TO N 6 LATER THAN 2:00 PLEASE TOM ###-#### Ok to pour w/ sp insp. Approval R-bar placed.
|
BLD-Footing | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | PART |
|
|
|
REBAR GRID LINES N 2 -6 DAVE ###-#### R-bar placed made ok w/sp insp. Approval
|
BLD-Concrete | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PART |
|
|
|
elevated floor slab ###-#### P/T deck #1 ok to pour w/sp insp. Approval
|
BLD-Concrete | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PART |
|
|
|
###-####---dave concrete columns--grid e6, j6, k6, L6 Made ok to pour w/spec. insp. Ok
|
BLD-Foundation | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PART |
|
|
|
location 2-H and 2-J pile caps tom ###-#### Made ok w/spe. Insp. Approval / R-bar placed
|
BLD-Footing | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PART |
|
|
|
###-#### GRID LINES 2-6 BETWEEN K-N Ok to pour at sp insp. Approval
|
BLD-Conference | 10/26/1999 | 10/26/1999 | 10/26/1999 | A | PART |
|
|
|
Conf. with super on air entramment for deck concrete
|