Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02049
StatusFinaled
Name KRIEZENBECK CONST.
Site Address 312 S 9TH ST
Project NameFOSTER GARAGE
Customer Number 
ePlanReviewNo
Description
FOSTER BLOCK PARKING GARAGE - TO CONSTRUCT A NEW 213,750 SQ. FT., EIGHT-TIER, POST-TENSIONED CONCRETE PARKING STRUCTURE (593 STALLS) WITH A 5385 SQ. FT. BASEMENT AREA. THE NORTHWEST CORNER OF STRUCTURE AT GROUND LEVEL HAS A FUTURE OFFICE TENANT SPACE. THIS OFFICE SPACE IS APPROVED FOR SHELL & CORE CONSTRUCTION ONLY. A SEPARATE TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH AND OCCUPY THAT SPACE. THIS BUILDING TO BE FULLY FIRE SPRINKLED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THE GRADING AND FOUNDATION/BASEMENT WORK ARE BEING COMPLETED UNDER SEPARATE PERMITS. FOUNDATION PERMIT BLD99-1088, GRADING PERMIT BLD99-1262. DRH98-0244/519-99/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20015/11/20015/11/2001PPASS
DetailsCarl Dependahl
Final reinspect... 5/11/2001 2:58:07 PM
BLD-Final4/26/20014/27/20014/27/2001AFAIL
DetailsCarl Dependahl
Final reinspect - Cathy has the card - Dave, ###-####- call 1st so he can meet you; need elec permits for elevator & sensors finalled...spoke w/ bldr...recall. 4/27/2001 12:28:30 PM
BLD-Final11/8/200011/9/200011/9/2000PPART
DetailsJim Storey
tom ###-#### tenp occ ok c/n posted for other isues to be completed. 11/9/2000 4:15:58 PM
BLD-Final11/8/200011/9/200011/9/2000PPART
DetailsJim Storey
tom ###-#### tenp occ ok c/n posted for other isues to be completed. 11/9/2000 4:15:58 PM
BLD-Conference11/7/200011/7/200011/7/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/7/2000 3:38:48 PM w/ 301 re final insp c/n issued.
BLD-Final11/6/200011/7/200011/7/2000PFAIL
DetailsJim Storey
FN TOM ###-#### c/n isued 4 hr p/l protection not complet. ok for temp upon completion of this isue. other isues can be completed on temp occ time frame. 11/7/2000 3:16:07 PM
FIRE-Final Inspection11/6/200011/7/200011/7/2000APASS
DetailsRick Jackson
TOM ###-#### FIRE FN
BLD-Final10/26/200010/30/200010/30/2000PPART
DetailsJim Storey
FN -TOM ###-#### fire stopping in progess ok for four hr assemblie. 10/31/2000 11:42:40 AM
FIRE-Final Inspection10/30/200010/30/200010/30/2000PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 10/30/2000 need all rated glazing installed and door hardware; extinguishers; generator load test; bumper block at gas meter; c/n issued 10/30/2000 2:08:47 PM
BLD-Final10/20/200010/26/200010/26/2000PCANC
DetailsJim Storey
fn --tom-- ###-####
BLD-Final10/24/200010/26/200010/26/2000PCANC
DetailsJim Storey
FN OCC- DAVE- ###-####
BLD-Framing/Rough-in10/6/200010/12/200010/12/2000PFAIL
DetailsJim Storey
fr insp tom ###-#### 4 hr wall not complet/need all special insp. and pt log./ exit signage 100 ft visablity isue/3/4 1 hr at stairs infill./ duct from tennent space to storage qustion of occ. sepration horisontal. engineering and arch. changes to be submited. 10/13/2000 5:24:41 PM
BLD-Other9/13/20009/13/20009/13/2000 PASS
Dave Hattrick and 305 reviewd existing cable rails on 9-12-2000 we found that as currently constucted they will not meet the criteria that was outlined to myself, perry paine and jim storey and as on file with the inspector which stated they met national application and a 4" wedge could not be plulled through the spaces between the guard rails at 30 pounds of pull. I will notify contractor of our findings, rails shall be in compliance with UBC as they were directed.
BLD-Framing/Rough-in8/25/20008/30/20008/30/2000AFAIL
DetailsJim Storey
WEST EQUIP ROOM ROOF---TOM ###-#### -- no ancer on phone or person on site to contact. 8/30/2000 3:46:29 PM
BLD-Framing/Rough-in8/25/20008/30/20008/30/2000AFAIL
Details
WEST EQUIP ROOM ROOF---TOM ###-#### -- no one on site by 301 9/1/2000 10:46:37 AM
BLD-Framing/Rough-in8/25/20008/28/20008/28/2000APART
Details
REBAR INSP--###-#### -TOM--WEST EQUIP ROOM WALLS pending sp insp approvals 8/29/2000 10:12:49 AM
BLD-Concrete8/21/20008/23/20008/23/2000PPART
Details
east stair tower beams and columns 7th and 8th floor ###-#### pending sp insp aprovals 8/24/2000 9:45:50 AM
BLD-Concrete8/21/20008/22/20008/22/2000PPART
Details
west stair tower beams and columns 7th to 8th floor ###-#### pending sp insp approvals 8/22/00 10:02:37 AM
BLD-Concrete8/18/20008/21/20008/21/2000APART
Details
level 6 and 7\\###-#### Tom pending sp insp approvals 8/21/00 11:15:20 AM
BLD-Foundation8/16/20008/17/20008/17/2000APART
Details
rebar Tom ###-#### west stair tower level 6,beams pending sp insp approvals 8/17/2000 3:26:59 PM
BLD-Concrete8/16/20008/16/20008/16/2000APART
Details
Scheduled by a contractor via Hello! on 08/16/2000 at 07:01:53. Contact: ###-####. pending sp insp approvals 8/16/2000 3:31:52 PM
BLD-Concrete7/28/20007/31/20007/31/2000APART
Details
west colum and beams 3rd to 4th floors\\rebar pending sp insp approvals 7/31/2000 3:22:55 PM
BLD-Concrete7/24/20007/26/20007/26/2000APART
Details
east pent house floor ###-#### pending sp insp approvals 7/25/2000 2:30:59 PM
BLD-Concrete7/24/20007/25/20007/25/2000APART
Details
location 2nd to 3rd level west beams ###-#### with sp insp approval 7/25/2000 11:32:56 AM
BLD-Framing/Rough-in7/20/20007/21/20007/21/2000APART
Details
beams & columns for 2nd to 3rd level--east core-- tom ###-#### pending sp insp approvals 7/21/2000 3:00:42 PM
BLD-Foundation7/18/20007/19/20007/19/2000PPART
Details
pouring around noon tom for re-bar east eigth floor walls Tom ###-#### pending sp insp approals 7/19/2000 10:27:29 PM
BLD-Concrete7/12/20007/17/20007/17/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/12/2000 at 16:08:31. Contact: ###-####. pending s/i report 7/17/2000 11:30:26 AM
BLD-Concrete7/12/20007/14/20007/14/2000APART
Details
Scheduled by a contractor via Hello! on 07/12/2000 at 16:07:54. Contact: ###-####. pend sp nsp report 7/14/2000 10:02:32 AM
BLD-Concrete7/12/20007/12/20007/12/2000APART
Details
Scheduled by a contractor via Hello! on 07/12/2000 at 06:43:46. Contact: ###-####. pending sp insp approval 7/12/00 3:27:20 PM
BLD-Concrete7/7/20007/10/20007/10/2000APART
Details
Scheduled by a contractor via Hello! on 07/07/2000 at 13:09:57. Contact: ###-####. for the sides and back found only 7/10/00 1:16:17 PM for the sides and back only 7/10/00 1:16:37 PM
BLD-Foundation6/29/20006/30/20006/30/2000APART
Details
rebar location 6th floor east and west elevated decks-tom ###-#### with sp insp approvals 6/30/00 1:46:33 PM
BLD-Concrete6/23/20006/26/20006/26/2000APART
Details
Scheduled by a contractor via Hello! on 06/23/2000 at 14:43:23. Contact: ###-####. pending sp insp approvals 6/26/00 4:59:20 PM
BLD-Framing/Rough-in6/19/20006/21/20006/21/2000APART
Details
fourth level west deck re-bar Tom ###-#### with sp insp pending 6/21/00 10:24:39 AM
BLD-Framing/Rough-in6/19/20006/20/20006/20/2000APART
Details
re-bar fourth level East deck Tom ###-#### madeok with sp insp approvals 6/21/00 10:08:05 AM
BLD-Other6/16/20006/19/20006/19/2000APART
Details
Scheduled by a contractor via Hello! on 06/16/2000 at 15:29:58. Contact: ###-####. r-bar in the stair tower 6/19/00 2:46:01 PM
BLD-Framing/Rough-in6/12/20006/13/20006/13/2000APART
DetailsJim Storey
re-bar 8th level west elevator core Tom ###-#### work in progess covered by special insp. 6/13/00 1:44:38 PM
BLD-Other6/7/20006/8/20006/8/2000PPART
Details
Scheduled by a contractor via Hello! on 06/07/2000 at 12:54:06. Contact: ###-####. with sp insp approvals 6/8/00 5:15:06 PM
BLD-Concrete5/30/20005/31/20005/31/2000APART
Details
Scheduled by a contractor via Hello! on 05/30/2000 at 12:51:19. Contact: ###-####. made ok with sp insp approvals 6/1/00 9:15:36 AM
BLD-Concrete5/24/20005/24/20005/24/2000PPART
Details
rebar 2nd floor elevator deck on the east elevator ###-#### pend sp insp approvals 5/24/00 10:56:25 AM
BLD-Concrete5/22/20005/23/20005/23/2000APART
Details
###-#### east elevator core, the 6th through 8th floor pendingsp insp aprovals 5/24/00 11:23:50 AM
BLD-Concrete5/12/20005/15/20005/15/2000APART
Details
Scheduled by a contractor via Hello! on 05/12/2000 at 15:35:26. Contact: ###-####. PENDING SP INSP APPROVALS 5/15/00 11:04:26 AM
BLD-Concrete5/15/20005/15/20005/15/2000PPART
Details
Tom ###-#### east core wall 4th thru 6th floor with spinsp approvals 5/15/00 4:14:07 PM
BLD-Concrete5/5/20005/5/20005/5/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/05/2000 at 06:48:53. Contact: ###-####. pending report from special insp. 5/5/00 11:17:56 AM
BLD-Concrete5/2/20005/2/20005/2/2000PPART
Details
###-#### East tower footers with sp insp approvals 5/2/00 4:03:58 PM
BLD-Conference5/1/20005/1/20005/1/2000APART
Details
Scheduled by Inspector: 338 On 5/1/00 WITH dAVE ON THE GUARDRAIL INTERMEDIATE ISSUE WITH DAVE REEDER AND DAVE A WITH ARCH. GUARD RAIL IS OK FOR DEFLECTION AND HEIGHT, VEHICLE BARRIER IS OK FOR DEF PER TABLE 16...INTERMEDIATE RAILS MUST BE THAT A 4" SPHERE CANNOT PENETRATE, PERIOD. 5/1/00 11:31:11 AM
BLD-Concrete4/20/20004/20/20004/20/2000PPART
Details
LOCATION EAST CORE ELEVATORS 2ND AND 3RD LEVEL\\###-#### pending sp inspapprovals 04/21/2000 8:11:47 AM
BLD-Conference4/20/20004/20/20004/20/2000PPART
Details
conference on the guardrail req for people vehicle restraint is ok 04/21/2000 8:12:17 AM
BLD-Concrete4/12/20004/12/20004/12/2000PPART
Details
west 8th floor upstand beam ###-#### ok with sp insp approvals 04/13/2000
BLD-Concrete4/10/20004/11/20004/11/2000APART
Details
8th floor\\###-#### pending sp insp approvals 04/11/2000
BLD-Concrete4/11/20004/11/20004/11/2000PPART
Details
west side deck #15 and columns grid 1 A B C D E made ok with sp insp approvals 04/11/2000
BLD-Concrete4/7/20004/10/20004/10/2000PPART
Details
east upstand beam level 8, colum grid 6 ghjklm\\###-####. rescheduled by 325. madeok with sp insp approvals 04/10/2000
BLD-Concrete4/7/20004/10/20004/10/2000PCANC
Details
east upstand beam level 8, colum grid 6 ghjklm\\###-####. rescheduled by 325.
BLD-Concrete4/6/20004/6/20004/6/2000PPART
DetailsJim Storey
EAST 8TH FLOOR ELVATED STAB\\###-#### covered by special insp.pending report. 4/6/00
BLD-Concrete4/4/20004/4/20004/4/2000PPART
Details
grid 6 G H J K L M level 8 426*8984 pending sp insp reports 04/10/2000
BLD-Concrete4/3/20004/3/20004/3/2000PPART
Details
7th floor grid 12456 abcdef\\###-#### pending sp insp approvals 04/03/2000
BLD-Concrete3/31/20003/31/20003/31/2000PPART
Details
upstand beam at grid A 7th level , columns on Grid 1 A,B, C, D ###-#### ok with sp insp approvals 03/31/2000
BLD-Concrete3/29/20003/30/20003/30/2000APART
Details
west 7th floor floor slab ###-#### pending sp insp approvals 3/30/00 10:12:34 AM
BLD-Concrete3/28/20003/28/20003/28/2000PPART
Details
grid lines 1, 1.1, 2, 6, on M and N ###-#### Dave with pending sp insp approvals 03/28/2000
BLD-Concrete3/24/20003/27/20003/27/2000APART
Details
Scheduled by a contractor via Hello! on 03/24/2000 at 12:25:59. Contact: ###-####. made ok pend sp insp approvals 03/27/2000 3:47:15 PM
BLD-Concrete3/27/20003/27/20003/27/2000 PART
Details
7th level g h j k l m 6\\###-#### with sp insp pending 03/28/2000
BLD-Concrete3/22/20003/23/20003/23/2000APART
Details
LEVEL SEVEN WEST\\###-#### ok pending sp insp approvals 03/22/2000 2:03:53 PM
BLD-Concrete3/21/20003/21/20003/21/2000PPART
Details
location level seven 1a b, 2a,b 3a, 4 5 6 bcdefg \\###-#### made ok with sp insp approvals 03/22/2000 7:01:44 AM
BLD-Concrete3/17/20003/17/20003/17/2000PPART
Details
upstand beam west 6th level columns on grid 1 B,C,D,E,F,G Tom ###-#### made ok with sp insp approvals 03/17/2000 9:13:42 AM
BLD-Concrete3/15/20003/16/20003/16/2000APART
Details
pour 11 west deck N columns of grid 2 B,C,D,E,F,G ###-#### 7th floor ok with sp insp approval 03/16/2000 10:33:59 AM
BLD-Concrete3/15/20003/16/20003/16/2000APART
Details
west elevator core walls ###-#### Tom made ok with sp insp approval 03/16/2000 10:34:14 AM
BLD-Concrete3/15/20003/15/20003/15/2000PPART
Details
###-#### columns grid 1 through 1.1 M,N,L,K,J on 6th level made ok pending sp insp approvals 03/16/2000 7:55:08 AM
BLD-Concrete3/14/20003/14/20003/14/2000PPART
Details
Scheduled by a contractor via Hello! on 03/14/2000 at 08:10:01. Contact: ###-####. made ok pending sp insp approvals 3/14/00 5:06:29 PM
BLD-Concrete3/8/20003/9/20003/9/2000APART
Details
Scheduled by a contractor via Hello! on 03/08/2000 at 12:54:31. Contact: ###-####. pending sp insp approvals 3/9/00 10:21:26 AM
BLD-Concrete3/7/20003/7/20003/7/2000PPART
Details
columns on level 5 4b 5c 6d Tom ###-#### made ok to pour with sp insp approvals 3/8/00 8:55:13 AM
BLD-Concrete3/6/20003/6/20003/6/2000PPART
Details
elevator east core from foundation to 2nd floor Tom ###-#### made ok with sp insp spprovels 3/6/00 5:49:28 PM
BLD-Concrete3/3/20003/3/20003/3/2000PPART
Details
5th floor upstand beam and columns on Grid 1b, c ,d, e and f Tom ###-#### made ok only with sp insp approvals 3/6/00 10:34:10 AM
BLD-Concrete3/1/20003/2/20003/2/2000APART
Details
Scheduled by a contractor via Hello! on 03/01/2000 at 13:18:50. Contact: ###-####. made ok to pour pending sp insp approvals 3/2/00 3:45:55 PM
BLD-Concrete2/28/20002/29/20002/29/2000APART
Details
Scheduled by a contractor via Hello! on 02/28/2000 at 12:17:38. Contact: ###-####. made ok pending sp insp approvals 2/28/00 3:14:38 PM
BLD-Foundation2/29/20002/29/20002/29/2000PPART
DetailsJim Storey
LMN grid 6 level 5 and N1 and M1 columns on level 5 Tom ###-#### LMW grid level 5, N1 M1 columns level 5 pending spec. insp. report. 3/1/00 11:13:03 AM
BLD-Concrete2/25/20002/25/20002/25/2000PPART
Details
5th floor grid 1 G, H, J, K, L, columns 5th floor grid N upstand beam ###-#### made ok pending sp insp report 2/25/00 11:44:54 AM
BLD-Concrete2/24/20002/24/20002/24/2000PPART
Details
5th floor slab east Tom ###-#### made ok with sp insp approvals 2/25/00 11:23:52 AM
BLD-Concrete2/22/20002/22/20002/22/2000PPART
Details
columns on 5th floor 2A , 3A, 2B, 4B, and 5C ###-#### made ok pending sp insp approvals 2/22/00 5:30:15 PM
BLD-Concrete2/17/20002/18/20002/18/2000PPART
DetailsJim Storey
tom ###-#### --upstand beam w. end of the 4th level--columns- grid # 1-b,c,d,e, & f Pend SSI report. 2/22/00 10:11:51 AM
BLD-Concrete2/16/20002/16/20002/17/2000PPART
DetailsJim Storey
###-#### tom 4th floor west slab Work in progress pending reports from special inspection agency. 2/17/00 10:07:08 AM
BLD-Concrete2/15/20002/15/20002/15/2000PPART
DetailsJim Storey
grid L, K, & J on 4th floor, north wall ramp ###-#### pending special insp. report. 2/16/00 10:05:45 AM
BLD-Concrete2/14/20002/14/20002/14/2000PPART
DetailsJim Storey
###-#### location grid N1 1.1 2 and 6 m2 m1 Placed w/special insp. pending report. 2/15/00 9:28:06 AM
BLD-Concrete2/11/20002/11/20002/11/2000PPART
Details
grid line 6 G H K L M N upstand beam on N ###-#### made ok with sp insp approvals pending 2/11/00 5:42:20 PM
BLD-Concrete2/9/20002/9/20002/9/2000PPART
Details
slab 4th floor\\###-#### made ok to pour pending sp insp approvals 2/10/00 10:26:18 AM
BLD-Concrete2/4/20002/4/20002/4/2000PPART
Details
tom ###-#### concrete columns a 1,2, & 3---- 3rd level made pending sp insp approvals r-bar is placed 2/8/00 8:18:59 AM
BLD-Concrete2/3/20002/3/20002/3/2000PPART
Details
up turn beam on grid line A madeok with sp insp approvals r-bar is placed 2/8/00 8:37:52 AM
BLD-Concrete1/31/20002/1/20002/1/2000APART
Details
Pour #5 elevated slab. Tom; ###-####. made ok with sp insp approval 2/1/00 4:42:07 PM
BLD-Concrete1/25/20001/26/20001/26/2000APART
Details
Scheduled by a contractor via Hello! on 01/25/2000 at 12:33:36. Contact: ###-####. pending sp insp approvals 1/26/00 10:44:58 AM
BLD-Concrete1/26/20001/26/20001/26/2000PPART
Details
dave reeder- ###-####--grid line 6, columns l. m. n, grid line 2, m, n, 3rd level r-bar placed sp insp ok 1/27/00 6:47:40 PM
BLD-Concrete1/24/20001/24/20001/24/2000PPART
Details
###-#### Tom columns A 1, 2, 3 and B 4 , C 4 , D, E, F, G, 6 and foundation for elevator 2 and 3 made ok with sp insp approval pending 2/10/00 11:36:27 AM
BLD-Footing1/21/20001/21/20001/21/2000PPART
Details
upside beam on 3rd level--on n line--###-####-tom r-bar placed sp inspection approval still pending ok to pour with same 1/21/00 10:46:47 AM
BLD-Concrete1/19/20001/20/20001/20/2000APART
Details
###-#### made ok to pour columns the r-bar is inspected and passed by myself and sp insp 1/20/00 11:46:57 AM
BLD-Concrete1/19/20001/19/20001/19/2000PPART
Details
###-#### WALK THROUGH WITH SUPER ON GUARDRAIL ELEVATIONS APPROVED FIX FOR ELEVATION CHANGE FOR THE BOTTOM CABLE USED FOR SAME 1/20/00 1:40:47 PM
BLD-Concrete1/13/20001/13/20001/13/2000PFAIL
DetailsJim Storey
###-#### TOM\\COL B C D E F ALL IN LINE ONE SECOND DECK, Col. ok pending SI report work in progress/c/n issued for col link 2 39 inch e/u for gaurdrail cabbles will not meet 42 inch min submit change.
BLD-Concrete1/11/20001/11/20001/11/2000PPART
Details
made ok with sp insp approvals r-bar placed
BLD-Concrete1/5/20001/6/20001/6/2000APART
Details
Scheduled by a contractor via Hello! on 01/05/2000 at 12:52:50. Contact: ###-####.
BLD-Concrete1/3/20001/3/20001/3/2000Ppart
Details
Scheduled by a contractor via Hello! on 01/03/2000 at 10:12:03. Contact: ###-####.r-bar placed made ok w sp insp
BLD-Concrete12/27/199912/28/199912/28/1999APART
Details
Scheduled by a contractor via Hello! on 12/27/1999 at 13:25:14. Contact: ###-####. Made ok R-bar placed sp. insp. ok.
BLD-Footing12/17/199912/17/199912/17/1999PPART
Details
dave--- ###-#### ft --north ft for stairs R-bar placed sp. Insp. Onsite.
BLD-Concrete12/14/199912/15/199912/15/1999APART
Details
grid lines A to G and from grid line 2 to 6 R-bar placed ok to pour.
BLD-Concrete12/7/199912/8/199912/8/1999PPART
Details
###-####--TOM CONCRETE---RETENSION TANK FLOOR-WEST SLAB- & UPSTAND BEAM Ok to pour- sp. Insp. Made ok- R-bar placed.
BLD-Concrete12/3/199912/3/199912/3/1999PPART
Details
elevated slab grid line 1 to 2, grid line g to n, PT Ok with sp. Insp. Approvals. R-bar placed.
BLD-Foundation12/1/199912/1/199912/1/1999PPART
Details
###-####--tom -pour re-bar for columns-d1, d2, a1 Ok to pour R-bar placd sp. Insp. Approved.
BLD-Foundation11/29/199911/29/199911/29/1999PPART
Details
tom --- e1, e2, f1, f2 on 2nd floor----###-#### -rebar Made ok R-bar placed spec. insp. Ok.
BLD-Foundation11/23/199911/23/199911/23/1999PPART
Details
Dave ###-#### west stair way walls Ok to pour w/sp insp. Approval; R-bar placed.
BLD-Foundation11/18/199911/22/199911/22/1999APART
Details
WEST STAIRWELL FOOTING --- ###-####--DAVE ###-#### made ok R-bar placed sp. Insp. On site.
BLD-Foundation11/18/199911/22/199911/22/1999APART
Details
BETWEEN GRID LINE 2 & 6 --FOUND? DAVE ###-#### Ok to pour sp. Insp. On site.
BLD-Concrete11/18/199911/19/199911/19/1999APART
Details
GRID LINE 6, 3 COLUMNS--PILE CAP, GRID LINE A & 1 ---DAVE ###-#### Made ok w/spec. insp. Approvals.
BLD-Concrete11/16/199911/16/199911/16/1999 PART
Details
grid g to n and grid line 1 to 2 made ok w/sp insp. Approval.
walls: grid line 6 to 2
BLD-Concrete11/9/199911/10/199911/10/1999APART
Details
rebar columns grid lines 1 k j h & m dave ###-#### Ok to cover W/sp insp approval.
BLD-Foundation11/4/199911/4/199911/4/1999PPART
Details
REBAR FOR A STEPPED FOOTER BETWEEN N 1.1 TO N 6 LATER THAN 2:00 PLEASE TOM ###-#### Ok to pour w/ sp insp. Approval R-bar placed.
BLD-Footing11/3/199911/3/199911/3/1999PPART
Details
REBAR GRID LINES N 2 -6 DAVE ###-#### R-bar placed made ok w/sp insp. Approval
BLD-Concrete10/29/199911/1/199911/1/1999APART
Details
elevated floor slab ###-#### P/T deck #1 ok to pour w/sp insp. Approval
BLD-Concrete10/28/199910/29/199910/29/1999APART
Details
###-####---dave concrete columns--grid e6, j6, k6, L6 Made ok to pour w/spec. insp. Ok
BLD-Foundation10/29/199910/29/199910/29/1999PPART
Details
location 2-H and 2-J pile caps tom ###-#### Made ok w/spe. Insp. Approval / R-bar placed
BLD-Footing10/27/199910/28/199910/28/1999APART
Details
###-#### GRID LINES 2-6 BETWEEN K-N Ok to pour at sp insp. Approval
BLD-Conference10/26/199910/26/199910/26/1999APART
Details
Conf. with super on air entramment for deck concrete