BLD-Final | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | CANC |
Tony Young
|
|
|
Joel Brown ###-####
|
BLD-Final | 4/12/2001 | 4/12/2001 | 4/12/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 4/12/2001 9:29:21 AM
|
BLD-Final | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/11/2001 5:49:57 PM REinsp Pass OK for certificate of completion
|
FIRE-Final Inspection | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | CANC |
Joe Tawney
|
|
|
###-#### Cancel To be rescheduled 4/11/2001 8:21:13 AM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Tony Young
|
|
|
###-####
foundation wall (not frame) for rear ramp 2/13/2001 4:02:53 PM
|
BLD-Footing | 2/8/2001 | 2/8/2001 | 2/8/2001 | P | NR |
Tom Arcoraci
|
|
|
unable to find footing on site no phone number to call contractor 2/8/2001 4:52:40 PM 2/8/2001 5:02:10 PM 2/8/2001 5:03:13 PM
|
BLD-Conference | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PART |
Joe Tawney
|
|
|
Conf. on alarm system with Sam Rogers, contr., & vendors.
|
FIRE-Final Inspection | 6/28/2000 | 6/30/2000 | 6/30/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/28/2000 at 15:57:43. Contact: ###-####. reinsp alarm system administration area resubmittal requested 6/30/00 3:18:19 PM
|
FIRE-Final Inspection | 6/28/2000 | 6/29/2000 | 6/29/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/28/2000 at 12:10:28. Contact: ###-####. reinsp not ready reschedule to 6/30/00 6/29/00 11:34:44 AM
|
FIRE-Final Inspection | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 15:40:12. Contact: ###-####. Reinsp. not ready wrong permit number. 6/26/00 2:57:38 PM
|
BLD-Final | 6/21/2000 | 6/22/2000 | 6/22/2000 | A | PART |
Bob Archibald
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 13:20:05. Contact: ###-####. Spray on fireproofing ok'd doors 210-a & 442 require cabels door 457 needs adjust. Needs fire approval. 6/22/00 11:20:29 AM
|
FIRE-Final Inspection | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 08:23:21. Contact: ###-####. Final fail C/N issued. 6/23/00 11:23:57 AM
|
BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Wes Worcester
|
|
|
Kitchen area ok for cover. also approved spray-on fireproofing detail for floor joists.
|
FIRE-Alarm Testing | 5/25/2000 | 5/30/2000 | 5/30/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 15:00:01. Contact: ###-####. Ok on alarm test phase 1 5/30/00 3:44:13 PM
|
BLD-Framing/Rough-in | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | CANC |
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 14:02:08. Contact: ###-####. out of time 5/30/00 6:35:37 AM
|
FIRE-Alarm Testing | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 14:46:08. Contact: ###-####. Conf. on fire alarm system 5/25/00 1:39:18 PM
|
FIRE-Alarm Testing | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/15/2000 at 14:08:10. Contact: ###-####. Fail approved plans not on site corrections required. 5/16/00 1:17:47 PM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 15:44:36. Contact: ###-####. storege rm bath 2 hr wall ok. 5/5/00 1:09:54 PM
|
FIRE-Final Inspection | 4/19/2000 | 4/25/2000 | 4/24/2000 | A | CANC |
Joe Tawney
|
|
|
###-#### Disp set to [CANC] by a contractor via Hello! on 04/24/2000 at 15:43:24.
|
FIRE-Conference | 4/19/2000 | 4/21/2000 | 4/21/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 16:16:52. Contact: . Conf. with elect contractor about alarm system. 4/26/00 11:13:38 AM
|
BLD-Framing/Rough-in | 4/13/2000 | 4/13/2000 | 4/13/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 09:25:13. Contact: . area 3# ok for celling drop. 4/13/00
|
FIRE-Conference | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 14:03:11. Contact: . Rorner electric wanted to review door release requirements 4/11/00 11:20:33 AM
|
BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 18:22:04. Contact: . Looked at some frame work under floor. 3/22/00 1:43:49 PM
|
BLD-Framing/Rough-in | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 08:05:48. Contact: .
|
BLD-Framing/Rough-in | 3/17/2000 | 3/20/2000 | 3/20/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/17/2000 at 16:10:28. Contact: . Not ready 3/21/00 9:31:43 AM
|
BLD-Framing/Rough-in | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/15/2000 at 15:16:20. Contact: . Part of 2hr wall behind kitchen 3/16/00 2:28:09 PM
|
FIRE-Conference | 3/13/2000 | 3/14/2000 | 3/14/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 13:50:52. Contact: . Wanted to discuss location of backflow preventers- see plans. 3/14/00 1:56:21 PM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/10/2000 | 3/10/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### Exterior wall 2hr area separation, need detail for eaves running parallel. 3/14/00 11:56:07 AM
|
BLD-Framing/Rough-in | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 09:58:06. Contact: . Ceiling at mechancial bldg. 3/7/00 1:41:42 PM
|
BLD-Framing/Rough-in | 2/23/2000 | 2/24/2000 | 2/24/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/23/2000 at 14:35:19. Contact: . Approved 2hr wall in rm#458 and in cafeteria across from risk management office.
|
BLD-Framing/Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 14:45:37. Contact: . Interior side, of a section of 2hr wall. 2/18/00 3:34:44 PM
|
BLD-Framing/Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 13:03:41. Contact: . Interior walls only of. 2/14/00 2:06:27 PM
|
BLD-Framing/Rough-in | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 16:36:21. Contact: . 2 hr wall in coridoor 221 opposite nurses station 203 ok for cover 2/1/00 2:05:52 PM
|
BLD-Framing/Rough-in | 1/27/2000 | 1/27/2000 | 1/27/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 07:26:39. Contact: . made pk 2/14/00 10:47:52 AM
|
BLD-Framing/Rough-in | 1/25/2000 | 1/25/2000 | 1/25/2000 | P | PART |
Wes Worcester
|
|
|
joel ###-#### Corridor (sic) on saving @ nurse's station grid ceiling & penetrations ok. 2 hr. wall in bathroom #812 & corridors at both 2 hr wall locations covered 801 & 807 1 hr construction ok. Architect details for 2hr area sep wall nor seedy document on site. 1/26/00 2:21:53 PM
|
BLD-Framing/Rough-in | 1/20/2000 | 1/20/2000 | 1/20/2000 | P | PART |
Bob Archibald
|
|
|
Verified 2hr wall construction at rooms 227,228,226,225. 4" penetration requires fire assembly. Also verified 2hr wall costruction in room 812, 2hr wall in bathroom of this room not complete. Coridoors at both 2hr wall locations require reinspection on penetrations.
|
BLD-Framing/Rough-in | 1/13/2000 | 1/13/2000 | 1/13/2000 | A | PART |
Wes Worcester
|
|
|
Conference on 2hr occ. sep. wall. Wall to be constructed as per architects detail or Paul Seedy document detail. Ceiling and bearing wall to be maintained as 1hr construction. 2nd layer of rock on 2hr wall ok.
|
BLD-Framing/Rough-in | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | FAIL |
Wes Worcester
|
|
|
###-#### joel. 2hr. Area separation wall is incorrect and not to UL listed installation criteria.
|
FIRE-Sprinkler Rough-in | 12/27/1999 | 12/27/1999 | 12/28/1999 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 08:24:44. Contact: . Ok on spklr. R/I of one corridor area in Alzheimer wing.
|
BLD-Framing/Rough-in | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/22/1999 at 13:34:19. Contact: . Trans. to 301.
|
BLD-Framing/Rough-in | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 15:31:24. Contact: ###-####. 2hr wall incorrect.
|
BLD-Framing/Rough-in | 12/2/1999 | 12/3/1999 | 12/6/1999 | P | PART |
Jim Storey
|
|
|
JOEL ###-#### Membrane has to butt to ceiling membrane per code exception.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/9/1999 | 11/9/1999 | A | PART |
Wes Worcester
|
|
|
joel ###-#### fr Double layer ok @ 2hr wall @ ceiling.
|
BLD-Framing/Rough-in | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PART |
Wes Worcester
|
|
|
joe--- ###-#### fr insp 2 hr walls @ group room ok
|
FIRE-Sprinkler Rough-in | 10/20/1999 | 10/21/1999 | 10/21/1999 | A | PART |
Joe Tawney
|
|
|
joel ###-#### Reached agreement on location of smoke detectors in relation to air supply grills.
|
BLD-Framing/Rough-in | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | FAIL |
Wes Worcester
|
|
|
joel ###-#### 1hr const. Not to plan ck notes, not to 1hr constr. Criteria
|
BLD-Framing/Rough-in | 10/7/1999 | 10/8/1999 | 10/8/1999 | A | PART |
Wes Worcester
|
|
|
joel ###-#### no one there
|