Permit Information
Permit NumberBLD99-02146
StatusFinaled
Name RUMSEY HAROLD E
Site Address 1415 N LIBERTY ST
Project NameASPEN APARTMENTS
Customer Number 
ePlanReviewNo
Description
UNIT TYPE "B" * TO CONSTRUCT A NEW 6,304 SQ.FT. TWO STORY, WOOD FRAMED TYPE V NONRATED, EIGHT UNIT APARTMENT BUILDING. THERE ARE FOUR TYPE I UNITS ON THE FIRST FLOOR AT 736 SQ.FT. EACH, TOTAL FLOOR AREA IS 3,360 AND FOUR TYPE I UNITS ON THE SECOND FLOOR AT 736 SQ.FT. EACH TOTAL FLOOR AREA 2944 SQ.FT.. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A17.1 AND THE 1997 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE PARKING AND LANSCAPING. MJP DRH99-0064 CUP99-0042 PC# 99-572
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/200012/15/200012/15/2000PPASS
DetailsTom Arcoraci
DON ###-#### FN OCC ok for perm 12/15/2000 3:54:22 PM
Permanent Occupancy 12/15/200012/15/2000 DONE
Details
BLD-Final10/27/200010/27/200010/27/2000PFAIL
DetailsCarl Dependahl
Don ###-#### c/n; air seal,s.c. doors, . ok for t/o. 10/27/2000 4:55:18 PM 10/27/2000 5:01:16 PM
FIRE-Final Inspection10/26/200010/27/200010/27/2000APASS
DetailsJoe Tawney
don ###-#### Reinsp OK for permanant occupancy 10/27/2000 12:23:40 PM
FIRE-Final Inspection10/24/200010/25/200010/25/2000AFAIL
DetailsJoe Tawney
Don ###-#### Final Fail C/N issued 10/25/2000 12:09:00 PM
BLD-Wall cover8/31/20008/31/20008/31/2000APASS
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 08/31/2000 at 06:22:44. Contact: ###-####.
BLD-Framing/Rough-in8/29/20008/30/20008/30/2000AFAIL
DetailsCarl Dependahl
shear nailing don ###-####; renail panels at 2nd fl. recall 8/30/2000 9:54:10 AM
BLD-Framing/Rough-in8/28/20008/28/20008/28/2000PPART
DetailsCarl Dependahl
###-####; gyp ok exc. at s 8/28/2000 4:46:04 PM tair lid 8/28/2000 4:46:15 PM
BLD-Wall cover8/25/20008/25/20008/25/2000APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/25/2000 at 07:00:06. Contact: ###-####., int gyp at 1hr
8/25/2000 9:31:47 AM
BLD-Wall cover8/24/20008/24/20008/24/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/24/2000 at 07:46:27. Contact: ###-####. INT GYP OK 8/24/2000 4:39:30 PM
BLD-Framing/Rough-in8/23/20008/23/20008/23/2000PPART
DetailsCarl Dependahl
shear wall Don ###-#### int shear ok to cover, c/n for gyp at lids & firewalls 8/23/2000 11:54:06 AM
BLD-Framing/Rough-in8/22/20008/22/20008/22/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/22/2000 at 07:08:04. Contact: ###-####. ok to cover, need gyp insp for nailing 8/22/2000 9:44:15 AM
BLD-Energy code compliance8/17/20008/18/20008/18/2000APART
DetailsCarl Dependahl
Don ###-#### 1st fl only ok to cover 8/18/2000 11:19:57 AM
BLD-Framing/Rough-in8/17/20008/18/20008/18/2000AFAIL
DetailsCarl Dependahl
Don ###-#### keep c/n at 2nd fl. 8/18/2000 11:20:35 AM
BLD-Energy code compliance8/17/20008/17/20008/17/2000PNR
DetailsCarl Dependahl
Don ###-####
BLD-Framing/Rough-in8/17/20008/17/20008/17/2000PNR
DetailsCarl Dependahl
Don ###-####
BLD-Framing/Rough-in8/15/20008/16/20008/16/2000AFAIL
DetailsCarl Dependahl
Don ###-#### reinspection; ok to ins 1st fl only. c/n nailing, fireblox, truss cut, etc. 8/16/2000 2:32:48 PM
BLD-Framing/Rough-in8/15/20008/15/20008/15/2000PFAIL
DetailsCarl Dependahl
###-#### call 1/2 hour before you go; complete fireblox, recall 8/15/2000 4:59:08 PM
BLD-Framing/Rough-in8/11/20008/14/20008/14/2000AFAIL
DetailsCarl Dependahl
don ###-#### fr; c/n re eng'g changed, e 8/14/2000 11:36:12 AMc 8/14/2000 11:36:18 AM
BLD-Framing/Rough-in8/7/20008/7/20008/7/2000PPART
DetailsCarl Dependahl
shear nailing\\###-####; part, ext nailing ok; add hd's missed & int osb 8/7/2000 3:42:18 PM
BLD-Framing/Rough-in8/2/20008/2/20008/2/2000PFAIL
DetailsCarl Dependahl
###-####; complete blocking, nailing at horiz edges 8/2/2000 4:38:21 PM
BLD-Conference7/25/20007/26/20007/26/2000APART
DetailsCarl Dependahl
Greg Anderson ###-####; need clarify 2hr wall and 1hr lid assy, add fireblox, hold downs 7/26/2000 4:26:49 PM fire 7/26/2000 4:27:38 PM complete 1hr enclosure at exits 7/26/2000 4:27:59 PM 7/26/2000 4:28:20 PM
BLD-Conference7/18/20007/18/20007/18/2000PPASS
DetailsCarl Dependahl
w/ arch...w.i.p. no frame insps called.
BLD-Foundation6/12/20006/13/20006/13/2000APART
DetailsAlan Hauser
clay ###-#### foundation wall
BLD-Footing6/7/20006/8/20006/8/2000APART
DetailsAlan Hauser
clay ###-####