Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02180
StatusFinaled
Name DENNIS ROBINSON
Site Address 555 E PARKCENTER BLVD
Project NameDELTA DENTAL OFFICE
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 11,810 SQ. FT, SINGLE STORY, WOOD FRAMED, TYPE V ONE-HOUR, OFFICE BUILDING. 9410 SQUARE FEET OF OFFICE SPACE IS BEING FINISHED WITH BUILDING CONSTRUCTION; 2400 SQUARE FEET WILL BE TENANT SPACE UNFINISHED WITH BUILDING CONSTRUCTION SHELL. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. PERMIT TO LAND SCAPING AND PARKING LOT. ADDITIONAL PERMIT AND CERTIFICATE OF OCCUPANCY REQUIRED TO FINISH THE 2400 SQ.FT. LEASE SPACE. GRADING PERMIT #99-2107. MJP DRH99-0092, P.C.# 557-99
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20004/28/20004/28/2000APASS
DetailsJim Storey
Dan ###-#### final ok 4/28/00 9:21:59 AM
Permanent Occupancy 4/28/20004/28/2000 DONE
Details
FIRE-Final Inspection3/29/20003/29/20003/29/2000PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection3/24/20003/27/20003/27/2000AFAIL
DetailsRick Jackson
Dan ###-#### Security egress doors not working. 3/28/00 8:52:34 AM
BLD-Final3/23/20003/24/20003/24/2000PPART
DetailsJim Storey
Dan ###-#### ada signage at restarooms , pending other sign offs. temp occ ok 3/24/00 2:50:08 PM
FIRE-Final Inspection3/24/20003/24/20003/24/2000PFAIL
DetailsRick Jackson
###-#### Egress doors not working. 3/27/00 10:08:41 AM
FIRE-Final Inspection3/22/20003/22/20003/22/2000PFAIL
DetailsRick Jackson
###-#### Egress doors not working. 3/23/00 9:03:04 AM
FIRE-Conference2/28/20002/28/20002/28/2000PPART
DetailsRick Jackson
Dan ###-#### Exit lights; duct detectors; egress controls on exit. 2/29/00 3:04:41 PM
BLD-Framing/Rough-in2/22/20002/23/20002/23/2000APART
Details
###-#### dan madeok to drop in the ceiling tiles 2/23/00 11:00:51 AM
BLD-Framing/Rough-in2/11/20002/14/20002/14/2000APASS
DetailsJim Storey
ceiling \\###-#### Beam covered w/gyp. ok. 2/14/00 2:27:40 PM
BLD-Conference2/1/20002/2/20002/2/2000APART
DetailsJim Storey
Dan ###-#### fire collors on piping ok thru 1 hr roof syst. c\n pending on how gib is to be 1 hr protected as wellas sadles for beams, subital reg for approval 2/3/00 9:44:36 AM
BLD-Framing/Rough-in1/18/20001/18/20001/18/2000PPART
DetailsJim Storey
FIRE CAULKING--RE-INSP- DAN-- ###-#### Waiting for submittal for column & beam 1hr protection/ plumbing penetration 1 ok 2 failed at ceiling collor not installed correctly. 1/19/00 10:54:06 AM
BLD-Framing/Rough-in1/7/20001/11/20001/11/2000APART
DetailsJim Storey
Dan CM company ###-#### Fire damper/beam & co lwrap/ plastic pipe 3 loc.
BLD-Framing/Rough-in12/15/199912/15/199912/15/1999APART
DetailsJim Storey
SHEETROCK DAN ###-#### Received eng. Letter to address C/N ok archived letter.
BLD-Framing/Rough-in12/10/199912/13/199912/13/1999PFAIL
DetailsJim Storey
###-####-dan fr insp C/N.
BLD-Framing/Rough-in12/6/199912/8/199912/8/1999ANR
DetailsRuss Owen
nailing\###-#### Frost on roof, will recall when complete.
BLD-Framing/Rough-in12/8/199912/8/199912/8/1999PPART
DetailsJim Storey
ROOF NAILING-- ###-####-DAN Deck nailing on roof deck ok.
BLD-Framing/Rough-in12/3/199912/3/199912/3/1999APART
DetailsJim Storey
Exterior shear nailing ok per approved plan ok to cover exterior of Bld.
BLD-Framing/Rough-in12/2/199912/2/199912/2/1999PFAIL
DetailsJim Storey
shear wall dan ###-#### voice pager Sheer nailing C/N.
BLD-Footing10/15/199910/19/199910/19/1999APART
DetailsWes Worcester
dan ###-#### Met w/contractor; MTI onsite.. 301 area.