BLD-Final | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | PASS |
|
|
|
Added by Inspector: 338 On 6/15/00 made ok for letter
|
BLD-Final | 3/23/2000 | 3/24/2000 | 3/24/2000 | P | PART |
|
|
|
###-#### signed the temp col 03/27/2000 6:47:56 AM
|
FIRE-Final Inspection | 3/22/2000 | 3/23/2000 | 3/23/2000 | P | PASS |
Rick Jackson
|
|
|
###-#### Rod
|
BLD-Footing | 11/8/1999 | 11/9/1999 | 11/9/1999 | P | PART |
|
|
|
Rod ###-#### ready at 2:30 they will pour at 3:30 Ok to pour brace frame area and canopy pads.
|