BLD-Final | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Jim Storey
|
|
|
###-####
|
Permanent Occupancy | | 2/20/2001 | 2/20/2001 | | DONE |
|
|
|
|
BLD-Final | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### wes fn occ c/n door smoke seal/hardware/closers/fire stopping in machenry rm. 2/20/2001 8:45:44 AM
|
FIRE-Final Inspection | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/15/2001 4:07:49 PM
|
BLD-Final | 2/8/2001 | 2/12/2001 | 2/12/2001 | P | NR |
Jim Storey
|
|
|
###-#### John
|
FIRE-Final Inspection | 2/8/2001 | 2/12/2001 | 2/12/2001 | A | FAIL |
Rick Jackson
|
|
|
Jon Small ###-#### need balance report for hood system and exit sign above personnel door by MPU overhead door per plans 2/12/2001 3:23:42 PM
|
FIRE-Alarm Testing | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 10:02:31. Contact: ###-####. c/n issued (exit signs, smoke vents, alarms, address, etc) 1/26/2001 3:53:30 PM
|
BLD-Framing/Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 11:16:06. Contact: ###-####. cellings in tennent spaces ok 12/21/2000 11:01:30 AM
|
BLD-Framing/Rough-in | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 09:16:56. Contact: ###-####. ceilling ok jewellery store. 12/11/2000 3:48:17 PM
|
BLD-Framing/Rough-in | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/01/2000 at 09:42:28. Contact: ###-####. north corridor ok for cover plm acess door must be rated check at later date. 12/1/2000 2:29:56 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/21/2000 | 11/21/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 10:37:10. Contact: ###-####. coridor plm/screws on 12 inch ceilling and clips/light wires and seismic pods./putty pads 2 loc corrdor. 11/24/2000 12:44:48 PM
|
BLD-Framing/Rough-in | 11/16/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 16:00:29. Contact: ###-####. main canopy framing screw atchment not per plan leadger on slpit face not per plan rfi for atchment. 11/17/2000 5:01:49 PM
|
BLD-Framing/Rough-in | 11/8/2000 | 11/9/2000 | 11/9/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/08/2000 at 14:57:21. Contact: ###-####. c/n previous rated const. ok/ east canopy front ok for cover. 11/13/2000 9:19:25 AM
|
BLD-Framing/Rough-in | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Jim Storey
|
|
|
Wes ###-#### colums at mech. mez. not wrapped/ ele putty pads required at center coridor north / south coridor blow patch. 11/8/2000 8:52:39 AM
|
BLD-Framing/Rough-in | 11/1/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 13:32:00. Contact: ###-####. tennent spaces ok at north west corner of bldg curtian wall west /south area ok for cover . 11/2/2000 4:15:17 PM
|
BLD-Framing/Rough-in | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 09:03:04. Contact: ###-####. framing ok exterior and interior walls / pending mech mez. and frnt tunnel corridors. 10/23/2000 12:49:37 PM
|
BLD-Framing/Rough-in | 10/5/2000 | 10/6/2000 | 10/6/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/05/2000 at 11:19:23. Contact: ###-####. home storage area south west walls and all south tunnel corridors ok for cover. 10/6/2000 11:03:07 AM
|
BLD-Framing/Rough-in | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 15:50:15. Contact: ###-####. east coridor must have speaker gyp box protection. 9/29/2000 5:30:14 PM
|
BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 16:04:15. Contact: ###-####. good to cover east to west grid line 10 only one side rated tunnels for reinsp c/n . 9/25/2000 11:42:04 AM
|
BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 13:11:04. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 16:08:13. Contact: ###-####. roof decking ok pending s/i report. 8/16/2000 1:31:46 PM
|
BLD-Concrete | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 8/14/2000 aproved resubmital and archived plan.
|
BLD-Footing | 8/9/2000 | 8/10/2000 | 8/10/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 11:27:29. Contact: ###-####. pending spinsp approvals 8/10/2000 3:38:57 PM
|
BLD-Footing | 8/7/2000 | 8/8/2000 | 8/8/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 13:06:15. Contact: ###-####. on site with 301 c/nissued for bolt projection at post bases and for changes for the steel decking attachments, concrete approved with sp insp approvals 8/8/2000 9:28:15 AM
|
BLD-Foundation | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 12:52:53. Contact: ###-####. rebar ok south wall line at loading docl/ walked roof joist and girder to colum atchaments ok steel deck atachments changed to hilti shot pins requir enginer of record to submit change. east deck 4 bays to the west ok pending aproval of resubmital 8/4/2000 10:33:04 AM
|
BLD-Footing | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 15:57:37. Contact: ###-####. pending report s/i. 7/28/2000 11:49:08 AM
|
BLD-Footing | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 15:02:42. Contact: ###-####. pending report from s/i. 7/27/2000 9:56:34 AM
|
BLD-Footing | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 08:22:37. Contact: ###-####. rebar ok pending s/i report. 7/25/2000 8:16:15 AM
|
BLD-Footing | 7/24/2000 | 7/24/2000 | 7/24/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 08:35:17. Contact: ###-####. south/east 100 ft to 200 ft. pending report appears ok on rebar. 7/24/2000 1:30:55 PM
|
BLD-Footing | 7/19/2000 | 7/20/2000 | 7/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/19/2000 at 10:59:43. Contact: ###-####. covered with s/i. 7/20/2000 2:53:42 PM
|
BLD-Footing | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 15:11:00. Contact: ###-####.
|
BLD-Footing | 7/14/2000 | 7/17/2000 | 7/17/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 15:25:38. Contact: ###-####. pending s/i report. 7/17/2000 1:34:18 PM
|
BLD-Footing | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 14:31:36. Contact: ###-####.
|
BLD-Foundation | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 14:33:21. Contact: ###-####.
|
BLD-Footing | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 12:58:19. Contact: ###-####. pending s/i report. 7/13/00 11:16:21 AM
|
BLD-Footing | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 14:43:07. Contact: ###-####. gil called and cancled via phone. 7/12/00 1:37:58 PM
|
BLD-Footing | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 14:43:07. Contact: ###-####.
|
BLD-Footing | 7/10/2000 | 7/11/2000 | 7/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/10/2000 at 13:52:01. Contact: ###-####. pending s/i report . 7/11/00 1:46:56 PM
|
BLD-Footing | 7/7/2000 | 7/10/2000 | 7/10/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 16:28:53. Contact: ###-####. pending s/i report. 7/10/00 5:11:19 PM
|
BLD-Footing | 7/6/2000 | 7/7/2000 | 7/7/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 15:12:50. Contact: ###-####.
|
BLD-Footing | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 11:56:51. Contact: . SOUTH EAST TO NORTHEAST FOOTER 7/7/00 6:29:36 AM
|