BLD-Final | 12/15/2000 | 12/15/2000 | 12/15/2000 | P | PASS |
Tom Arcoraci
|
|
|
FN DON-- ###-#### ok for perm occ 12/15/2000 3:54:39 PM
|
Permanent Occupancy | | 12/15/2000 | 12/15/2000 | | DONE |
|
|
|
|
BLD-Final | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### DON 11/1/2000 3:09:16 PM cn posted e/code and door closers ok for temp occ 11/1/2000 3:21:33 PM
|
FIRE-Final Inspection | 11/1/2000 | 11/1/2000 | 11/1/2000 | A | PASS |
Joe Tawney
|
|
|
###-####. Final OK for permanant occupancy 11/1/2000 12:19:47 PM
|
FIRE-Final Inspection | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | CANC |
Joe Tawney
|
|
|
Don ###-####
|
BLD-Framing/Rough-in | 9/19/2000 | 9/20/2000 | 9/20/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### drytwall shear ok 9/20/2000 11:05:22 AM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | CANC |
Tony Young
|
|
|
DON ###-#### DRYWALL INSP
|
BLD-Framing/Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PART |
Carl Dependahl
|
|
|
don ###-####; ok to cover, need gyp nailing insp at firewalls 9/8/2000 1:59:07 PM
|
BLD-Framing/Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | PART |
Carl Dependahl
|
|
|
this is a framing and a shear Don ###-####; int & ext osb ok. ok to side both floors 9/5/2000 2:41:21 PM
|
BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/30/2000 renail shear panels at 2nd fl; recall
|
BLD-Framing/Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/28/2000
|
BLD-Wall cover | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/24/2000 GYPSUM
|
BLD-Energy code compliance | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | PART |
Carl Dependahl
|
|
|
###-####, ok to side, ext sheathing ok 8/23/2000 11:54:34 AM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | PART |
Carl Dependahl
|
|
|
shear ###-####; ok to insulate 1st fl shear walls and add osb. 8/23/2000 1:17:43 PM
|
BLD-Framing/Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 07:10:34. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | FAIL |
Carl Dependahl
|
|
|
Don ###-####; missed panels at nw corner, nail &recall 8/18/2000 11:21:41 AM
|
BLD-Framing/Rough-in | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | NR |
Carl Dependahl
|
|
|
Daon ###-####
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Carl Dependahl
|
|
|
don ###-#### shear nailing insp
|
BLD-Framing/Rough-in | 8/11/2000 | 8/11/2000 | 8/11/2000 | P | CANC |
Tony Young
|
|
|
SHEAR NAIL-- FR --###-####- DON--PLEASE CALL 1/2 HR BEFORE INSP
per don cancel -re-scheduled. canceled by 325
|
BLD-Framing/Rough-in | 8/10/2000 | 8/10/2000 | 8/10/2000 | P | FAIL |
Russ Owen
|
|
|
shear wall Don ###-#### Approved plans not on site,prior c/n not at site.new c/n. 8/11/2000 9:23:32 AM
|
BLD-Framing/Rough-in | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | FAIL |
Carl Dependahl
|
|
|
shear nailing don ###-####; ok to side n & s ends only. c/n issued. 8/9/2000 12:18:10 PM
|
BLD-Framing/Rough-in | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | NR |
Tom Arcoraci
|
|
|
shear nailing don ###-####
|
BLD-Foundation | 6/14/2000 | 6/14/2000 | 6/14/2000 | P | PART |
Jim Sly
|
|
|
they are going to pour foundation walls at 3pm Clay ###-####
|
BLD-Footing | 6/8/2000 | 6/9/2000 | 6/9/2000 | P | PART |
Jim Sly
|
|
|
Clay ###-####
|