BLD-Final | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PASS |
Alan Hauser
|
|
|
Gil; ###-####. Ok for perm. occ. 2/4/00 11:39:06 AM
|
Permanent Occupancy | | 2/3/2000 | 2/3/2000 | | DONE |
|
|
|
|
BLD-Final | 11/24/1999 | 11/24/1999 | 11/24/1999 | P | PART |
Jim Sly
|
|
|
###-#### C/N.. Need (stamped) letter from engineer for fix or approval of discrepancies in CMN wall ok for temp. occ. Obtain perm. Occ. Status withing 90 days.
|
BLD-Final | 11/23/1999 | 11/23/1999 | 11/23/1999 | P | FAIL |
Jim Sly
|
|
|
wes ###-#### fn occ C/N.. Need final letter from sp. Insp. Agency, need all req. signatures.
|
FIRE-Final Inspection | 11/18/1999 | 11/19/1999 | 11/19/1999 | P | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/18/1999 at 15:14:26. Contact: ###-####. Final ok for permanent occ.
|
BLD-Framing/Rough-in | 11/10/1999 | 11/10/1999 | 11/11/1999 | P | PART |
Jim Sly
|
|
|
grid ceiling wes ###-#### Ceiling grid ok.
|
BLD-Framing/Rough-in | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PASS |
Jim Sly
|
|
|
roger ###-#### Pending special inspection and approvals
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | PART |
Tom Arcoraci
|
|
|
###-#### fr ---roger Ok to cover Ext. walls
|
BLD-Framing/Rough-in | 10/15/1999 | 10/15/1999 | 10/15/1999 | P | PART |
Jim Sly
|
|
|
rOGER ###-#### Ok to cover ext. wall only, bracing ok (exterior side)
|