BLD-Final | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 14:40:47. Contact: ###-####.
|
BLD-Grading Inspection | 3/2/2000 | 3/2/2000 | 3/2/2000 | | BOND |
Rita DeYoung
|
|
|
Grading has been significantly revised and will require a Hillside Development application. To ensure that the originally approved grading can be constructed the engineer has recommended a $3000.00 bond. Upon receipt of this the grading is conditionally approved.
|
BLD-Final | 3/1/2000 | 3/1/2000 | 3/2/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Needs temp. glass and egress ladder. 3/2/00 10:35:27 AM
|
BLD-Energy code compliance | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 08:29:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 09:01:22. Contact: ###-####. C/C truss engineering @ energy.
|
BLD-Framing/Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
|
|
|
JOHN-- ###-#### SHEAR NAIL Hold downs nailed w/3d box eng. Must sign-off hold downs & his eng. Req. (all).
|
BLD-Foundation | 9/16/1999 | 9/17/1999 | 9/17/1999 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 8/27/1999 | 8/27/1999 | 8/27/1999 | | PART |
Wes Worcester
|
|
|
/ / 342 - basement wall ok
|
INSP - Foundation | 8/26/1999 | 8/26/1999 | 8/26/1999 | P | FAIL |
Wes Worcester
|
|
|
08/26/99 342 - RYAN ###-#### not ready
|
INSP - Foundation | 8/24/1999 | 8/25/1999 | 8/25/1999 | A | PART |
Tom Arcoraci
|
|
|
08/25/99 408 - basement ft ok only
|