BLD-Framing/Rough-in | 11/3/1999 | 11/4/1999 | 11/4/1999 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/03/1999 at 16:11:31. Contact: ###-####. Cancelled by contractor.
|
FIRE-Final Inspection | 11/3/1999 | 11/4/1999 | 11/4/1999 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/03/1999 at 16:09:05. Contact: ###-####. Reinsp. Ok for cert. Of completion.
|
BLD-Framing/Rough-in | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | PART |
Carl Dependahl
|
|
|
NEIL ###-#### WALL INSP
|
FIRE-Final Inspection | 10/31/1999 | 11/1/1999 | 11/1/1999 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 10/31/1999 at 15:08:03. Contact: ###-####. Reinsp. Was trying to schedule structural inspection on Hello system.
|
FIRE-Final Inspection | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 10/27/1999 at 14:27:12. Contact: ###-####. Final fail install ceiling tile at sprklr. Heads
|
FIRE-Final Inspection | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PART |
Joe Tawney
|
|
|
###-#### Ok on sprkl. R/I, ok to cover
|
BLD-Framing/Rough-in | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/20/1999 at 08:45:45. Contact: ###-####. Met w/ proj. mgr; ok to cover walls; need sprinkler R/I
|