Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02394
StatusFinaled
Name URBAN RENEWAL AGENCY OF BOI SE
Site Address 1276 W RIVER ST
Project NameRIVER PLAZA
Customer Number 
ePlanReviewNo
Description
RIVER PLAZA OFFICE BUILDING * TO CONSTRUCT A NEW 3-STORY, WOOD FRAMED, TYPE V ONE-HOUR, FULLY SPRINKLERED, SHELL AND CORE, 26,851 SQUARE FOOT OFFICE BUILDING. THE FIRST FLOOR IS APPROXIMATELY 8,987 SQ.FT THE SECOND FLOOR IS APPROXIMATELY 9,054 SQ.FT THE THIRD FLOOR IS APPROXIMATELY 8,810 SQ.FT. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS USED TO SUBSTITUTE FOR THE ONE-HOUR FIRE-RESISTIVE CONSTRUCTION. ALL WORK PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. FOUNDATION PERMIT IS BLD99-2056. THIS PERMIT IS FOR A SHELL BUILDING ONLY SEPARATE PERMITS REQUIRED FOR EACH FUTURE TENANT SPACE TO BE COMPLETED AND OCCUPIED. THE SECOND AND THIRD FLOORS MUST HAVE THE CORRIDOR FINISHED TO PROVIDE ACCESS TO THE SECOND MEANS OF REQUIRED EGRESS. THIS REQUIREMENT MUST BE FINISHED AT THE TIME OF THE FIRST OCCUPANT. THIS BUILDING IS LOCATED IN THE 100 YEAR FLOOD PLANE AND A CERTIFICATE OF ELEVATION IS REQUIRED TO BE SUBMITTED TO THE STRUCTURAL INSPECTOR PRIOR TO THE FRAMING COMPLETION OF THE FIRST FLOOR. DRH99-0067 PC#619-99 MJP

PLAN MODIFICATION 6/26/00 * PLANS ARE BEING MODIFIED THE EXTERIOR ROOF IS BEING REDESIGNED TO HOUSE ROOF TOP HVAC UNITS WITHIN A MECHANICAL WELL AND INSTALL HVAC DUCTING INTO SHAFTS TO THE SECOND AND FIRST FLOORS. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/3/20017/3/20017/3/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/3/2001 2:56:47 PM shell ok for perm...l/c. t/i's need final requests
BLD-Final6/20/20016/21/20016/21/2001ANR
DetailsCarl Dependahl
april ###-####; need verify achd & other ok's; spoke w/ Titan 6/21/2001 11:07:03 AM
BLD-Conference3/13/20013/13/20013/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/13/2001 6:41:37 PM need all sign-offs, complete c/n, draft stops at fl/clgs, waterproofing at ext decks, etc.
BLD-Conference3/8/20013/8/20013/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/8/2001 9:20:23 AM w/ arch re c/n...need 1hr ext wall per plans at east side; prop. line assumed to be at 10'7"...no protected openings
BLD-Conference3/6/20013/6/20013/6/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/6/2001 6:24:09 PM w/arch re 1hr stair ways
BLD-Conference2/7/20012/7/20012/7/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/7/2001 11:09:26 AM w/ Carr const re t/i & finals
BLD-Conference1/29/20011/29/20011/29/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/29/2001 4:01:16 PM w/ arch onsite re c/n...add gyp at passageway
BLD-Conference1/25/20011/25/20011/25/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/25/2001 2:56:06 PM w/ contractor re c/n of 1-9-01. need add gyp at stairs, etc...both sides of assy.
BLD-Conference1/18/20011/18/20011/18/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/18/2001 9:54:27 AM w/rick jackson re c/n
BLD-Conference1/17/20011/17/20011/17/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/17/2001 4:26:16 PM w/ GS re plans
BLD-Final1/5/20011/8/20001/9/2001ACANC
DetailsCarl Dependahl
DARYL W/TITAN; ###-####.
BLD-Final1/9/20011/9/20011/9/2001PPART
DetailsCarl Dependahl
Darrel ###-####,c/n issued, ok for t/o 1/9/2001 6:02:41 PM
FIRE-Final Inspection1/9/20011/9/20011/9/2001APASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 1/9/2001 8:56:55 AM
FIRE-Final Inspection1/4/20011/5/20011/8/2001AFAIL
DetailsRick Jackson
DARRELL ###-#### FN FIRE sprinkler problems and alarm problems 1/8/2001 11:19:38 AM
BLD-Final1/4/20011/5/20011/5/2001ANR
DetailsCarl Dependahl
FN OCC- DARRELL ###-####
BLD-Final1/3/20011/4/20011/4/2001PNR
DetailsCarl Dependahl
temp occ- darrell ###-#### need fire, etc. 1/4/2001 4:08:31 PM
BLD-Framing/Rough-in11/15/200011/16/200011/16/2000APART
DetailsCarl Dependahl
###-####; recd details will review 11/16/2000 4:23:38 PM
BLD-Conference11/15/200011/15/200011/15/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/15/2000 5:42:14 PM w/ supt.
BLD-Framing/Rough-in10/23/200010/24/200010/24/2000APART
DetailsJim Storey
fr-- darrell ###-#### need flood plian cert. maintane east stair penatration of ele heater. 10/25/2000 11:36:45 AM
BLD-Framing/Rough-in10/23/200010/24/200010/24/2000APART
DetailsJim Storey
fr-- darrell ###-#### need flood plian cert. maintane east stair penatration of ele heater. 10/25/2000 11:36:45 AM
BLD-Conference8/29/20008/29/20009/1/2000PPART
Details
###-#### need fire signoff 8/29/2000 4:21:10 PM wiht darrell on the exit passageway etc 9/1/2000 10:46:01 AM
BLD-Framing/Rough-in6/20/20006/21/20006/21/2000APART
Details
Scheduled by a contractor via Hello! on 06/20/2000 at 14:14:31. Contact: ###-####. with darrell 6/21/00 11:11:54 AM
BLD-Conference5/19/20005/19/20005/19/2000PPART
Details
darrell--###-#### for conf with darrell onthe requiremens for a rated shaft for ducts penetrating floors from roof. code says 1 or 2 strys this is3 story building 5/19/00 5:12:56 PM