BLD-Final | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | PASS |
Jim Storey
|
|
|
mike ###-#### fn occ Final ok. 3/6/00 1:47:58 PM
|
Permanent Occupancy | | 3/6/2000 | 3/6/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | PASS |
Rick Jackson
|
|
|
Final reinspect - Murphy's
|
BLD-Final | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 07:50:35. Contact: ###-####. Ok for temp.
|
FIRE-Alarm Testing | 2/1/2000 | 2/2/2000 | 2/3/2000 | A | PASS |
Rick Jackson
|
|
|
alarms tested okay
|
BLD-Final | 2/1/2000 | 2/2/2000 | 2/2/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 17:42:21. Contact: ###-####. saftey glazing must be labled handrail from cook space to a-3 area 2/3/00 8:10:55 AM
|
FIRE-Final Inspection | 2/2/2000 | 2/2/2000 | 2/2/2000 | P | PART |
Rick Jackson
|
|
|
temp approved pending assembly permit
|
BLD-Other | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 14:25:44. Contact: ###-####.
|
FIRE-Alarm Testing | 1/31/2000 | 2/1/2000 | 2/1/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 15:04:24. Contact: ###-####. c\n issued 2/3/00 7:49:48 AM
|
BLD-Other | 1/25/2000 | 1/25/2000 | 1/25/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 07:56:51. Contact: ###-####. made ok to drop in ceiling tiles 1/26/00 8:18:05 AM
|
BLD-Conference | 1/9/2000 | 1/10/2000 | 1/10/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/09/2000 at 11:58:46. Contact: ###-####. Shaft ok class I.
|
BLD-Conference | 12/17/1999 | 12/20/1999 | 12/20/1999 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 15:03:40. Contact: ###-####. Submittals req.
|
BLD-Framing/Rough-in | 12/12/1999 | 12/13/1999 | 12/13/1999 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/12/1999 at 20:18:36. Contact: ###-####. Wanted to meet with Jim S.
|
BLD-Conference | 12/10/1999 | 12/10/1999 | 12/10/1999 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/10/1999 at 08:47:24. Contact: ###-####. Frame ok/ received engineer letter ceiling load ok.
|
FIRE-Sprinkler Rough-in | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 11:56:11. Contact: ###-####. Okay to cover south side up wall addition
|
BLD-Framing/Rough-in | 12/7/1999 | 12/8/1999 | 12/8/1999 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 16:38:18. Contact: ###-####. Truss eng. To provide bottom chord loading.
|
FIRE-Conference | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 08:38:16. Contact: ###-####. Conf.
|
FIRE-Conference | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PART |
Rick Jackson
|
|
|
Left C/N for exsisting ducts as requirements to meet UMC.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
Jim Storey
|
|
|
fire wall bryan ###-#### First layer 2hr wall gyp. Ok P/L wall/North.
|
BLD-Framing/Rough-in | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | PART |
Jim Storey
|
|
|
sheer nailing Brian ###-#### Exterior shear nailing ok all but 2hr. North wall.
|
BLD-Framing/Rough-in | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/19/1999 at 09:32:39. Contact: ###-####. N/R.
|
BLD-Framing/Rough-in | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PART |
Jim Storey
|
|
|
ROOF NAILING BRYAN ###-#### Roof nail ok on barrel truss & beam perlin framing.
|
BLD-Framing/Rough-in | 11/10/1999 | 11/10/1999 | 11/10/1999 | P | PART |
Jim Storey
|
|
|
BRIAN ###-#### PART FR INSP Shear at tube steel pony wall ok.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/8/1999 | 11/8/1999 | P | FAIL |
Jim Storey
|
|
|
partial framing brian ###-#### 2hr wall verrified const. Ok, framing fail.
|