BLD-Final | 11/22/2000 | 11/22/2000 | 11/22/2000 | P | PASS |
Carl Dependahl
|
|
|
###-####; ok for c/o. 11/22/2000 2:43:20 PM
|
FIRE-Final Inspection | 11/22/2000 | 11/22/2000 | 11/22/2000 | P | PASS |
Rick Jackson
|
|
|
reinspection ###-#### /// update of records - passed final 11/22/2000 4:11:32 PM
|
Permanent Occupancy | | 11/22/2000 | 11/22/2000 | | DONE |
|
|
|
|
BLD-Conference | 11/21/2000 | 11/21/2000 | 11/21/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/21/2000 11:03:12 AM w/bldr, need elec...address now on Fulton???
|
BLD-Final | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | NR |
Carl Dependahl
|
|
|
###-####, recall on 22nd 11/21/2000 11:56:13 AM
|
BLD-Final | 5/19/2000 | 5/19/2000 | 5/19/2000 | P | PART |
|
|
|
mid afternoon per John...338 temp occ ok 310 signed for 338 5/22/00 9:57:13 AM
|
BLD-Other | 5/17/2000 | 5/18/2000 | 5/18/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 19:07:31. Contact: ###-####. not ready for insp and occ req not signed , did not go onto jobsite 5/19/00 8:58:06 AM
|
FIRE-Final Inspection | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### Not complete per plans. 5/18/00 3:11:30 PM
|
FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | FAIL |
Rick Jackson
|
|
|
matt ###-#### Sprinkler final- C/N issued. 5/11/00 10:50:40 AM
|
FIRE-Supply Line Flush | 4/25/2000 | 4/26/2000 | 4/26/2000 | P | PASS |
Rick Jackson
|
|
|
###-#### Flush ok 4/28/00 8:49:37 AM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
###-#### with 409, and contractor super on the placement of exit signage and stair enclosure drywall framing 04/21/2000 8:13:19 AM
|
FIRE-Conference | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
Rick Jackson
|
|
|
###-#### Discussed with skip and Perry exit signs and locations. 4/21/00 9:14:39 AM
|
BLD-Framing/Rough-in | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PART |
|
|
|
###-#### ok to cover restrooms main level 04/12/2000 04/12/2000
|
FIRE-Sprinkler Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 | P | FAIL |
Rick Jackson
|
|
|
first floor Matt ###-#### at 2pm Obstructions in hallway 4/17/00 1:54:55 PM
|
BLD-Conference | 4/7/2000 | 4/10/2000 | 4/10/2000 | P | CANC |
|
|
|
###-####. rescheduled by 325.
|
BLD-Framing/Rough-in | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 14:23:01. Contact: ###-####. strapping complete for the roof diaphram ok to deck 3/6/00 10:44:05 AM
|
BLD-Conference | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | PART |
|
|
|
skip ###-#### installing shear bolting for roof diaphram per plans 3/6/00 10:26:22 AM
|
BLD-Framing/Rough-in | 2/21/2000 | 2/23/2000 | 2/23/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 02/21/2000 at 14:54:43. Contact: ###-####. strapping in the new mez floor 2/23/00 11:01:27 AM
|
BLD-Conference | 2/16/2000 | 2/16/2000 | 2/16/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 09:21:40. Contact: ###-####. basement sprinkler piping height acceptable meets 7ft. elv. in most areas in exit corridor. 6" worse case at side wall location. Thrust block need revised to maintain greatest width possible. 2/17/00 10:08:21 AM
|
BLD-Framing/Rough-in | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 11:58:50. Contact: ###-####. ok to cover basement hallway 2/10/00 10:23:50 AM
|
BLD-Foundation | 1/24/2000 | 1/25/2000 | 1/25/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 14:52:24. Contact: ###-####. pending sp insp approvals 1/26/00 7:57:11 AM
|
FIRE-Sprinkler Rough-in | 1/24/2000 | 1/25/2000 | 1/25/2000 | A | FAIL |
Rick Jackson
|
|
|
per rick 11:00 ????--tracy ###-####--- 200 lbs for 2 hrs Not complete or ready for test. 1/25/00 1:35:00 PM
|
BLD-Concrete | 10/26/1999 | 10/26/1999 | 10/26/1999 | A | PART |
|
|
|
With super. on work going on w/o permits at 516 S. 9th
|