BLD-Final | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | PASS |
|
|
|
Added by Inspector: 338 On 5/17/00 MADE OK 310 CONFIRMED SIGNOFFS FOR ME OK FOR 310 TO SIGN
|
Permanent Occupancy | | 5/17/2000 | 5/17/2000 | | DONE |
|
|
|
|
BLD-Final | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
|
|
|
Nick ###-#### srtuctural made ok but need ACHD, MECH, AND CODE ENF. SIGNED OFF 5/16/00 3:21:33 PM
|
FIRE-Final Inspection | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | PASS |
Rick Jackson
|
|
|
Nick ###-####
|
BLD-Final | 4/5/2000 | 4/6/2000 | 4/6/2000 | P | FAIL |
Jim Storey
|
|
|
###-####
|
FIRE-Final Inspection | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | FAIL |
Rick Jackson
|
|
|
c/n issued
|
BLD-Other | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
|
|
|
for drywall at the carport to the office space
|
BLD-Framing/Rough-in | 12/28/1999 | 12/28/1999 | 12/23/1999 | P | PART |
|
|
|
BOYD NO PHONE. Ok to cover ceiling basement.
|
BLD-Foundation | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PASS |
|
|
|
nick ###-#### foun wall R-bar placed.
|
BLD-Footing | 12/13/1999 | 12/13/1999 | 12/13/1999 | A | PART |
|
|
|
conf on the reinf placement and ok to up size r-bar in the stair retaining wall NICK ###-####
|
BLD-Footing | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
|
|
|
NICK ###-#### #4 bars a 5 each in the footing 3 on top 2 in bottom; ok to use #4 bars at 18" o.c. for uprithts if continuous with footing to top of wall; #4 s ok for the horiz bars if no more than 16" o.c. doubled at the top. R-bar placed.
|