BLD-Final | 3/28/2000 | 3/29/2000 | 3/29/2000 | A | PASS |
|
|
|
###-#### The Bon Mez area c/c #18160 04/04/2000
|
BLD-Final | 3/22/2000 | 3/23/2000 | 3/27/2000 | P | PART |
|
|
|
###-#### ok for the lower level 03/27/2000 3:41:48 PM
|
FIRE-Final Inspection | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PASS |
Rick Jackson
|
|
|
###-#### Greg
|
BLD-Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | PART |
|
|
|
Greg Nitz ###-####. Ok to occupy 1st phase of mez.
|
FIRE-Final Inspection | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | FAIL |
Rick Jackson
|
|
|
Greg Nitz ###-####. Sprinkler corrections.
|
FIRE-Sprinkler Rough-in | 11/30/1999 | 12/1/1999 | 12/1/1999 | A | PART |
Rick Jackson
|
|
|
JUST TO LOOK AT GREG ###-#### Replace old heads; insulated combustible cavity.
|
BLD-Framing/Rough-in | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | PART |
|
|
|
GREG ###-#### REINSPECTION Ok to cover with fire and Ele. Signoffs.
|
BLD-Framing/Rough-in | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | FAIL |
|
|
|
###-####\ The Bon Marche\Mezzaine level Had to go to tuck for approved plans- must have elec. Signoff prior to frame cover.
|