BLD-Final | 4/19/2004 | 4/19/2004 | 4/19/2004 | P | PASS |
Russ Owen
|
|
|
###-#### tim ok perm 4/18/2004 11:03:24 PM
|
Permanent Occupancy | | 4/19/2004 | 4/19/2004 | | DONE |
|
|
|
|
BLD-Final | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | PART |
Russ Owen
|
|
|
###-#### steve .OK TEMP OC PENDING PUBLIC WOTKS FOR FINAL. 1/9/2004 12:20:59 PM
|
BLD-Conference | 4/7/2003 | 4/7/2003 | 4/7/2003 | A | DONE |
Russ Owen
|
|
|
Meet on site with George Slain and Steve Carlson. The building has no CO. The tenants have been given both a 5 day notice on 1/24/03 and 25 day on 2/3/03. Now we have instructed them to submit to the director a letter of intent for all violations on property, also to check with the plan review dept and related office personel for any questions that they may have. 4/7/2003 11:29:24 AM
|
BLD-Conference | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PART |
Russ Owen
|
|
|
Meetr with Steve Carlson will be submitting letter of request for extension and intent for all violations on property. 3/13/2003 2:52:40 PM
|
FIRE-Final Inspection | 3/4/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Troy Cobbley
|
|
|
STEVE; Phone #: ###-#### Fire life safety finaled 3/5/2003 3:26:39 PM
|
Code Occupancy Approval | | | 2/5/2003 | | PASS |
|
|
|
ALL IN AS REQUIRED PER BUILDING A FINAL SIGNED OFF.
|
BLD-Other | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | DONE |
Troy Cobbley
|
|
|
I dropped off a copy of the original correction notice Joe Tawney had written up. I left the copy with Donna
|
BLD-Conference | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | CANC |
Russ Owen
|
|
|
###-#### BRYAN
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Russ Owen
|
|
|
###-####needs achd,public works for a temp. also handrail at stairs need raised,all rest room rear grab bars need relocating. 1/8/2001 2:58:11 PM
|
FIRE-Final Inspection | 12/14/2000 | 12/15/2000 | 12/15/2000 | A | PART |
Joe Tawney
|
|
|
Bryan ###-#### Reinsp OK for temporary occupancy 12/17/2000 8:31:15 PM
|
FIRE-Final Inspection | 12/13/2000 | 12/14/2000 | 12/14/2000 | A | CANC |
Joe Tawney
|
|
|
FIRE FN BRIAN ###-#### Cancel not ready 12/14/2000 12:38:41 PM
|
FIRE-Sprinkler Rough-in | 12/11/2000 | 12/12/2000 | 12/12/2000 | P | FAIL |
Joe Tawney
|
|
|
Brian ###-#### Final Fail C/N issued 12/13/2000 8:02:25 AM
|
FIRE-Final Inspection | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | FAIL |
Joe Tawney
|
|
|
Brian ###-#### Fail NOT READY FOR FINAL INSP 12/6/2000 12:58:08 PM
|
FIRE-Sprinkler Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | CANC |
Joe Tawney
|
|
|
CALL FIRST ###-#### Cancel resched for 12/4/00 12/1/2000 4:12:49 PM
|
FIRE-Sprinkler Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | CANC |
Joe Tawney
|
|
|
CALL FIRST ###-#### Cancel resched for 12/4/00 12/1/2000 4:12:49 PM
|
BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 17:33:38. Contact: ###-####. grid ok 11/29/2000 10:58:16 AM
|
BLD-Conference | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/20/2000 5:08:55 PM w/ Tom re w.i.p.
|
BLD-Framing/Rough-in | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 16:56:01. Contact: ###-####. front entry truss ok to cover 11/20/2000 10:06:19 AM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PART |
Carl Dependahl
|
|
|
Bryan ###-####; conf re roof const...scuppers, etc. for overflow 11/17/2000 5:21:23 PM
|
FIRE-Sprinkler Rough-in | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PART |
Joe Tawney
|
|
|
Brian ###-#### OK on rough in for South & East canopies 11/15/2000 8:04:42 AM
|
BLD-Framing/Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Carl Dependahl
|
|
|
Bryan ###-####; n.s.&w portico roof frames ok 10/31/2000 2:59:44 PM
|
BLD-Framing/Rough-in | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | NR |
Carl Dependahl
|
|
|
Bryan ###-#### recall 10/30/2000 4:44:54 PM
|
BLD-Framing/Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Carl Dependahl
|
|
|
Brian ###-####; draft stop, firesops at passageway framing ok. ok to cover those areas 10/20/2000 2:29:02 PM
|
BLD-Framing/Rough-in | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/19/2000 c/n, firestops & lid const at exit passage at rear; also rfi for s/f dampers same location;seal draft stops 10/19/2000 2:54:59 PM
|
BLD-Framing/Rough-in | 10/5/2000 | 10/5/2000 | 10/5/2000 | P | PART |
Carl Dependahl
|
|
|
###-####; ok to cove 1s 10/5/2000 12:16:36 PM t fl mezz; question re roof drains, will advise 10/5/2000 12:17:04 PM
|
BLD-Framing/Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 11:12:10. Contact: ###-####... 10/2/2000 3:02:30 PM ok to cover 1st fl below mezz & foyer at west end
(exit passage) 10/2/2000 3:05:00 PM
|
FIRE-Conference | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | PART |
Joe Tawney
|
|
|
###-####. Conf on soffits around bldg. Non combustible constr no spklrs req 9/26/2000 12:17:07 PM
|
BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Carl Dependahl
|
|
|
###-####; prelim. at parapet/ soffit... chk w/ fire for sprinklers 9/25/2000 3:52:40 PM
|
BLD-Framing/Rough-in | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
|
|
|
BRIAN-- ###-#### ok to cover foyer area both floors in process of making fire block draft stop seals, also ok to cover the perimeter walls of the assy area south and east 9/19/2000 2:47:45 PM
|
BLD-Framing/Rough-in | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
|
|
|
BRIAN-- ###-#### ok to cover foyer area both floors in process of making fire block draft stop seals, also ok to cover the perimeter walls of the assy area south and east 9/19/2000 2:47:45 PM
|
BLD-Conference | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/11/2000 at 18:50:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 | A | PART |
Carl Dependahl
|
|
|
JASON -- ###-#### FR
|
BLD-Framing/Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | NR |
Carl Dependahl
|
|
|
JASON -###-#### FR
|
BLD-Final | 8/11/2000 | 8/11/2000 | 8/11/2000 | P | CANC |
Tony Young
|
|
|
JASON -- ###-#### FN
canceled by contractor, Jason 8/11/2000 4:55:02 PM
|
FIRE-Conference | 8/10/2000 | 8/10/2000 | 8/10/2000 | P | PART |
Joe Tawney
|
|
|
jason ###-#### for conf Conf. with contractor & architect. 8/11/00 12:01:54 PM
|
FIRE-Conference | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 09:45:48. Contact: ###-####. Conf. with centr. regarding exit signs & fire extinguisher placement. 5/12/00 8:59:27 AM
|
BLD-Framing/Rough-in | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 10:32:36. Contact: ###-####. Conf. on framing 4/13/00 1:04:40 PM
|
BLD-Footing | 1/13/2000 | 1/14/2000 | 1/14/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### BRIAN Int. ftg. ok to continue. 1/14/00 2:57:37 PM
|
BLD-Foundation | 11/23/1999 | 11/23/1999 | 11/24/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/23/1999 at 10:43:03. Contact: ###-####. Rec'd eng's detail for SH. Wall connection to beam; discussed cold protection for remainder masonry- no "anti-freeze".
|
BLD-Foundation | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | NR |
Carl Dependahl
|
|
|
BLOCK INSPECTION BRYAN ###-#### Need verify resubmittal for masonry shear wall met w/supt. & mason recall.
|