Permanent Occupancy | | 6/6/2000 | 6/6/2000 | | DONE |
|
|
|
|
BLD-Final | 5/26/2000 | 5/26/2000 | 5/26/2000 | P | PASS |
Carl Dependahl
|
|
|
Struct ok for C/N. 5/31/00 9:19:35 AM
|
FIRE-Final Inspection | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PASS |
Rick Jackson
|
|
|
don -###-#### fn fire
|
BLD-Final | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | PART |
Carl Dependahl
|
|
|
JJulio ###-#### C/N- rear exit & gate (disabled), eng's letter ok for T/O. 3/30/00 10:49:47 AM
|
BLD-Final | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | FAIL |
Carl Dependahl
|
|
|
late pm temp occ\\###-#### Still need fire 3/29/00 10:03:13 AM
|
BLD-Final | 3/24/2000 | 3/27/2000 | 3/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
julio ###-#### Need other finals. 3/28/00 9:18:53 AM
|
FIRE-Final Inspection | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Joe Tawney
|
|
|
julio ###-#### final fail not ready for inspection/ 3/27/00 4:21:57 PM
|
FIRE-Hydro test above ground | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | PART |
Joe Tawney
|
|
|
Ok on above & underground hydro tests. Require hydro test on FDC piping.
|
BLD-Final | 3/23/2000 | 3/24/2000 | 3/24/2000 | P | FAIL |
Carl Dependahl
|
|
|
late pm ###-#### Julio Need all finals, door hdwr. 3/27/00 9:59:47 AM
|
BLD-Final | 3/23/2000 | 3/24/2000 | 3/24/2000 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/23/2000 at 11:41:30. Contact: ###-####. wrong inspection 3/27/00 10:04:45 AM
|
BLD-Framing/Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PART |
Carl Dependahl
|
|
|
Julio ###-#### Keep C/N- ceiling grid ok. 3/20/00 10:17:33 AM
|
FIRE-Conference | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PART |
Joe Tawney
|
|
|
julio ###-#### Conf. with Julio on sprnklr. & life safety issued. 3/9/00 2:16:24 PM
|
BLD-Conference | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | FAIL |
Carl Dependahl
|
|
|
julio ###-#### C/N: remove face paper, complete htg. R/I etc. 3/7/00 9:20:07 AM
|
BLD-Framing/Rough-in | 2/1/2000 | 2/2/2000 | 2/2/2000 | A | PART |
Carl Dependahl
|
|
|
Julio- ###-####. ok to begin cover at false cols etc at int keep c\n re shaft detail and wall 2/3/00 8:12:58 AM
|
BLD-Framing/Rough-in | 1/28/2000 | 1/31/2000 | 1/31/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 13:09:48. Contact: ###-####. c\n need engs detail for shear walls windows, fire blocks etc ok to insul ext wall pending elec 2/1/00 9:02:46 AM
|
BLD-Framing/Rough-in | 1/11/2000 | 1/11/2000 | 1/11/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### . Roof nailing ok.
|
BLD-Framing/Rough-in | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | FAIL |
Carl Dependahl
|
|
|
julio ###-####. Need others R/I's- will recall.
|
BLD-Footing | 1/10/2000 | 1/10/2000 | 1/7/2000 | A | PART |
Carl Dependahl
|
|
|
spec insps performed for foundation; pending reports
|
BLD-Concrete | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PART |
Tom Arcoraci
|
|
|
slab/ rebar inspection Julio ###-#### Spec. insp. On site.
|