Permanent Occupancy | | 3/15/2000 | 3/15/2000 | | DONE |
|
|
|
|
BLD-Final | 3/1/2000 | 3/2/2000 | 3/2/2000 | A | PART |
Jim Storey
|
|
|
Mike Tracy ###-#### Temp. ok pend Ken Wickols pern. & MTI final letter. 3/2/00 4:46:48 PM
|
FIRE-Final Inspection | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | PASS |
Joe Tawney
|
|
|
mike ###-#### fn fire Reinsp. ok for per. occ. 3/1/00 11:18:50 AM
|
FIRE-Final Inspection | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | FAIL |
Joe Tawney
|
|
|
Mike Tracy ###-#### Final fail mount fire extinguishers. 2/29/00 2:57:31 PM
|
BLD-Final | 2/23/2000 | 2/25/2000 | 2/25/2000 | P | FAIL |
Carl Dependahl
|
|
|
fn occ--mike ###-#### Need fire...called, left. msg. 2/28/00 2:46:29 PM
|
FIRE-Final Inspection | 2/24/2000 | 2/25/2000 | 2/25/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Final ok on alarm & sprklr. system. bldg. final no yet scheduled. 2/25/00 3:12:50 PM
|
BLD-Conference | 12/13/1999 | 12/14/1999 | 12/14/1999 | P | PASS |
Jim Storey
|
|
|
MIKE TRACY ###-#### MID DAY IF POSSIBLE Conf. W/MTI & contractor to review turn of the nut method req. & spec. by metal bldg. Engineering.
|
BLD-Foundation | 11/24/1999 | 11/26/1999 | 11/26/1999 | A | PART |
Jim Storey
|
|
|
mike ###-#### Covered w/special insp.
|
BLD-Conference | 11/24/1999 | 11/24/1999 | 11/24/1999 | P | FAIL |
Bill VanDegrift
|
|
|
Upgrade existing piping to materials approved for inside the building, secure plumbing permit for interceptor, install vents, test, call for inspection; extend vent from existing interceptor inside building thru roof.
|
BLD-Footing | 11/19/1999 | 11/19/1999 | 11/19/1999 | P | PART |
Carl Dependahl
|
|
|
Rick Shrum ###-#### super job site Mike Tracy ###-#### Boise airport; met w/supt. & MTI. Ok to pour pending complete soils ok.
|