BLD-Final | 5/22/2000 | 5/23/2000 | 5/23/2000 | A | FAIL |
Carl Dependahl
|
|
|
jim ###-#### Need other sig's. 5/24/00 11:11:50 AM
|
FIRE-Final Inspection | 5/22/2000 | 5/23/2000 | 5/23/2000 | A | FAIL |
Joe Tawney
|
|
|
jim ###-#### Final fail C/N issued. 5/23/00 2:12:10 PM
|
BLD-Framing/Rough-in | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Carl Dependahl
|
|
|
Jim ###-#### Rec'd ARch's detail re: 1hr const...ext. side gyp. ok 4/28/00 3:05:31 PM
|
BLD-Framing/Rough-in | 4/27/2000 | 4/27/2000 | 4/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Need Arch's detail for 1hr walls. 4/28/00 3:00:39 PM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/25/2000 | 4/25/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Need detail for 1 hr. ext. wall const. 4/26/00 11:16:38 AM
|
BLD-Concrete | 4/20/2000 | 4/21/2000 | 4/21/2000 | P | PART |
Carl Dependahl
|
|
|
###-####\\rebar
|
BLD-Framing/Rough-in | 3/28/2000 | 3/29/2000 | 3/29/2000 | P | PART |
Carl Dependahl
|
|
|
drainage around fd insp--- jim ###-#### cell Drain rock & "filter" installed. 3/30/00 10:49:58 AM
|
BLD-Footing | 3/23/2000 | 3/24/2000 | 3/24/2000 | A | PART |
Carl Dependahl
|
|
|
perimeter insulation around the foundation jim ###-#### Slab insulated 3/24/00 2:02:34 PM
|
BLD-Foundation | 3/17/2000 | 3/20/2000 | 3/20/2000 | A | PART |
Carl Dependahl
|
|
|
JIM ###-#### CELL FOUND Strata onsite for FDN. & cylinders. 3/21/00 4:10:42 PM
|
BLD-Footing | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 10:47:24. Contact: ###-####. rebar work in progress special insp. to be on site Pending report & scope of work. "Strata" 3/16/00 11:29:43 AM
|