BLD-Final | 6/14/2000 | 6/15/2000 | 6/15/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 16:08:56. Contact: ###-####.
|
FIRE-Final Inspection | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 12:34:05. Contact: ###-####.
|
Permanent Occupancy | | 6/15/2000 | 6/15/2000 | | DONE |
|
|
|
|
BLD-Final | 6/8/2000 | 6/9/2000 | 6/9/2000 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 16:31:51. Contact: ###-####.
|
BLD-Final | 6/8/2000 | 6/9/2000 | 6/9/2000 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 16:31:51. Contact: ###-####.
|
BLD-Wall cover | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 11:46:36. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 14:37:51. Contact: ###-####. 16ga double studs at each holddown instaled inverted to the engineered design. requirer engineer to approve instalation or redesign for loading. all other atchments appear to be per plan. 4/25/00 11:32:56 AM
|
BLD-Foundation | 3/21/2000 | 3/22/2000 | 3/22/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 14:11:41. Contact: ###-####. rebar ok pending special insp. report on concrete samples. 3/22/00 11:51:49 AM
|
BLD-Foundation | 3/20/2000 | 3/21/2000 | 3/21/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/20/2000 at 15:10:06. Contact: ###-####.
|
BLD-Foundation | 3/17/2000 | 3/20/2000 | 3/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/17/2000 at 15:18:23. Contact: ###-####. recieved scope of work covered by special inspection. foottings rebar ok set backs surveied in. 3/20/00 2:47:51 PM
|